Question 8

Bob can finish a job in 4040 days, if he works alone. Alex is twice as fast as Bob and thrice as fast as Cole in the same job. Suppose Alex and Bob work together on the first day, Bob and Cole work together on the second day, Cole and Alex work together on the third day, and then, they continue the work by repeating this three- day roster, with Alex and Bob working together on the fourth day, and so on. Then, the total number of days Alex would have worked when the job gets finished, is

Type-in-the-answer (TITA) question: no options are given; enter the value.

Answer this question Opens in practice mode, free, no sign-in.

Show answer and solution

Answer:

11

Solution

  • Assume total work = 120120 units (LCM of times).

  • Rates: Bob = 33, Alex = 66, Cole = 22.

  • 3-day cycle output: (6+3)+(3+2)+(2+6)=9+5+8=22(6+3) + (3+2) + (2+6) = 9 + 5 + 8 = 22 units.

  • 5 cycles (15 days) finish 110110 units. Alex works 2 days per cycle \implies 1010 days.

  • 1010 units remain. Next day (Alex + Bob) finishes 99 units. Alex works 11 day.

  • 11 unit remains for (Bob + Cole). Alex rests.

  • Total days Alex worked = 10+1=1110 + 1 = 11.

Detailed explanation

Concept: Work Rates and Cycles

Let total work be the LCM of the times taken by each person.

Bob's time = 4040 days.

Alex is twice as fast as Bob, so Alex's time = 2020 days.

Alex is thrice as fast as Cole, so Cole's time = 20×3=6020 \times 3 = 60 days.

Total work = \text{LCM}(40, 20, 60) = 120120 units.

Daily rates: Alex = 66, Bob = 33, Cole = 22.

The roster repeats every 3 days:

Day 1 (Alex + Bob): 6+3=96 + 3 = 9 units.

Day 2 (Bob + Cole): 3+2=53 + 2 = 5 units.

Day 3 (Cole + Alex): 2+6=82 + 6 = 8 units.

Total work in one 3-day cycle = 9+5+8=229 + 5 + 8 = 22 units.

Number of full cycles in 120 units: 120=5×22+10120 = 5 \times 22 + 10.

So, 5 full cycles (15 days) complete 110 units.

In these 5 cycles, Alex works on Day 1 and Day 3, totaling 5×2=105 \times 2 = 10 days.

Remaining work = 1010 units.

On the 16th day (Day 1 of new cycle), Alex and Bob work and complete 9 units. Alex works this day.

Remaining work = 11 unit.

On the 17th day, Bob and Cole finish the work. Alex does not work.

Total days Alex worked = 1010 (from full cycles) + 11 (from 16th day) = 1111 days.

Practise similar questions

Practice 1 CAT_2022_SLOT3_QA_Q08_SQ01

Brian can finish a job in 4848 days, if he works alone. Austin is twice as fast as Brian and thrice as fast as Chris in the same job. Suppose Austin and Brian work together on the first day, Brian and Chris work together on the second day, Chris and Austin work together on the third day, and then, they continue the work by repeating this three-day roster, with Austin and Brian working together on the fourth day, and so on. Then, the total number of days Austin would have worked when the job gets finished, is

Type-in-the-answer (TITA) question: no options are given; enter the value.

Show answer and solution

Answer:

13

Solution

  • Let total work = LCM(24,48,72)=144\text{LCM}(24, 48, 72) = 144 units.

  • Individual daily rates: Austin = 66, Brian = 33, Chris = 22.

  • Daily outputs in a 3-day cycle: Day 1 = 6+3=96+3=9, Day 2 = 3+2=53+2=5, Day 3 = 2+6=82+6=8.

  • Total work per 3-day cycle = 9+5+8=229 + 5 + 8 = 22 units.

  • 66 complete cycles (18 days) yield 6×22=1326 \times 22 = 132 units; Austin works 6×2=126 \times 2 = 12 days.

  • Remainder = 144−132=12144 - 132 = 12 units.

  • Day 19 (Austin + Brian) finishes 99 units, leaving 33 units; Austin works 11 full day.

  • Day 20 (Brian + Chris) finishes the remaining 33 units; Austin rests.

  • Total days Austin worked = 12+1=1312 + 1 = 13.

Practice 2 CAT_2022_SLOT3_QA_Q08_SQ02

Karan can finish a construction project in 2626 days, if he works alone. Arjun is twice as fast as Karan and thrice as fast as Dev in the same project. Suppose Arjun and Karan work together on the first day, Karan and Dev work together on the second day, Dev and Arjun work together on the third day, and then, they continue the work by repeating this three-day roster, with Arjun and Karan working together on the fourth day, and so on. Then, the total number of days Arjun would have worked when the project gets finished, is

Type-in-the-answer (TITA) question: no options are given; enter the value.

Show answer and solution

Answer:

7

Solution

  • Let total work = LCM(13,26,39)=78\text{LCM}(13, 26, 39) = 78 units.

  • Individual daily rates: Arjun = 66, Karan = 33, Dev = 22.

  • Daily outputs in a 3-day cycle: Day 1 = 6+3=96+3=9, Day 2 = 3+2=53+2=5, Day 3 = 2+6=82+6=8.

  • Total work per 3-day cycle = 9+5+8=229 + 5 + 8 = 22 units.

  • 33 complete cycles (9 days) yield 3×22=663 \times 22 = 66 units; Arjun works 3×2=63 \times 2 = 6 days.

  • Remainder = 78−66=1278 - 66 = 12 units.

  • Day 10 (Arjun + Karan) finishes 99 units, leaving 33 units; Arjun works 11 full day.

  • Day 11 (Karan + Dev) finishes the remaining 33 units; Arjun rests.

  • Total days Arjun worked = 6+1=76 + 1 = 7.

Time & Work questions from other CAT papers

  1. CAT 2025 Slot 1 Quant Q16
    Arun, Varun and Tarun, if working alone, can complete a task in 24, 21, and 15 days, respectively. They…
  2. CAT 2025 Slot 2 Quant Q10
    Ankita is twice as efficient as Bipin, while Bipin is twice as efficient as Chandan. All three of them start…
  3. CAT 2025 Slot 3 Quant Q7
    Teams A, B, and C consist of five, eight, and ten members, respectively, such that every member within a…
  4. CAT 2025 Slot 3 Quant Q13
    The rate of water flow through three pipes A, B and C are in the ratio 4 : 9 : 36. An empty tank can be…
  5. CAT 2024 Slot 1 Quant Q21
    Renu would take 15 days working 4 hours per day to complete a certain task whereas Seema would take 8 days…

Practise this question with timing, notes and your mistake notebook.

Practise in PrepSoc