CAT 2019 Slot 2 Quant Q32

  • Quantitative Aptitude
  • Arithmetic › Time & Work
  • Medium
  • Multiple choice
  • CAT_2019_SLOT2_QA_Q32

Question 32

Anil alone can do a job in 2020 days while Sunil alone can do it in 4040 days. Anil starts the job, and after 33 days, Sunil joins him. Again, after a few more days, Bimal joins them and they together finish the job. If Bimal has done 10%10\% of the job, then in how many days was the job done?

  1. A

    1515

    Answer A in PrepSoc practice
  2. B

    1212

    Answer B in PrepSoc practice
  3. C

    1313

    Answer C in PrepSoc practice
  4. D

    1414

    Answer D in PrepSoc practice

Answer this questionOr tap an option. Opens in practice mode, free, no sign-in.

Show answer and solution

Answer: (C)

1313

Solution

  • Assume total work = 4040 units:

    • Anil = 22 units/day, Sunil = 11 unit/day.
  • Bimal does 10%=410\% = 4 units   ⟹  \implies Anil + Sunil do 3636 units.

  • Anil works all TT days; Sunil works T−3T - 3 days.

  • 2T+(T−3)=36  ⟹  3T=39  ⟹  T=132T + (T - 3) = 36 \implies 3T = 39 \implies T = 13 days.

Detailed explanation

Concept: Time and Work (Unit Work Approach).

  1. Let the total work be the LCM of 2020 and 4040, which is 4040 units.

  2. Determine daily work rates:

    • Anil's efficiency: EA=4020=2 units/dayE_A = \frac{40}{20} = 2\text{ units/day}

    • Sunil's efficiency: ES=4040=1 unit/dayE_S = \frac{40}{40} = 1\text{ unit/day}

  3. Account for Bimal's contribution:

    • Bimal completes 10%10\% of the total work:

      Work done by Bimal=10%×40=4 units\text{Work done by Bimal} = 10\% \times 40 = 4\text{ units}

    • Remaining work done collectively by Anil and Sunil:

      40−4=36 units40 - 4 = 36\text{ units}

  4. Account for the timeline of Anil and Sunil:

    • Let the total duration of the job be TT days.

    • Anil works from day 11 through day TT: TT days.

    • Sunil joins after 33 days, so Sunil works for: (T−3)(T - 3) days.

  5. Set up the equation for total work done by Anil and Sunil:

    EA×T+ES×(T−3)=36E_A \times T + E_S \times (T - 3) = 36

    2T+1(T−3)=362T + 1(T - 3) = 36

    3T−3=363T - 3 = 36

    3T=39  ⟹  T=13 days3T = 39 \implies T = 13\text{ days}

  6. Therefore, the total job was completed in 1313 days (Option 3).

Practise similar questions

Practice 1 CAT_2019_SLOT2_QA_Q32_SQ01

Aarav alone can complete a software module in 1515 days, while Bhavin alone can complete it in 3030 days. Aarav begins working on the module alone, and after 33 days, Bhavin joins him. After a few more days, Chetan joins them and the three together finish the module. If Chetan has completed 20%20\% of the total work, in how many days was the module completed?

  1. A

    1010

  2. B

    99

  3. C

    1111

  4. D

    88

Show answer and solution

Answer: (B)

99

Solution

  • Assume total work = LCM(15,30)=30\text{LCM}(15, 30) = 30 units.

  • Aarav's rate = 22 units/day, Bhavin's rate = 11 unit/day.

  • Chetan does 20%×30=620\% \times 30 = 6 units, leaving 2424 units for Aarav and Bhavin.

  • Aarav works TT days, Bhavin works T−3T - 3 days.

  • 2T+1(T−3)=24  ⟹  3T=27  ⟹  T=92T + 1(T - 3) = 24 \implies 3T = 27 \implies T = 9 days.

  • Matches Option 2.

Practice 2 CAT_2019_SLOT2_QA_Q32_SQ02

Rohan alone can paint a municipal bridge in 3030 days, while Soham alone can paint it in 4545 days. Rohan starts painting the bridge, and after 44 days, Soham joins him. After a few more days, Tanmay joins them, and the three of them finish the project together. If Tanmay has painted 20%20\% of the bridge, in how many days was the entire bridge painted?

  1. A

    1616

  2. B

    1515

  3. C

    1818

  4. D

    1414

Show answer and solution

Answer: (A)

1616

Solution

  • Assume total work = LCM(30,45)=90\text{LCM}(30, 45) = 90 units.

  • Rohan's rate = 33 units/day, Soham's rate = 22 units/day.

  • Tanmay does 20%×90=1820\% \times 90 = 18 units   ⟹  \implies Rohan and Soham complete 7272 units.

  • Rohan works TT days, Soham works T−4T - 4 days.

  • 3T+2(T−4)=72  ⟹  5T=80  ⟹  T=163T + 2(T - 4) = 72 \implies 5T = 80 \implies T = 16 days.

  • Matches Option 1.

Time & Work questions from other CAT papers

  1. CAT 2025 Slot 1 Quant Q16
    Arun, Varun and Tarun, if working alone, can complete a task in 24, 21, and 15 days, respectively. They…
  2. CAT 2025 Slot 2 Quant Q10
    Ankita is twice as efficient as Bipin, while Bipin is twice as efficient as Chandan. All three of them start…
  3. CAT 2025 Slot 3 Quant Q7
    Teams A, B, and C consist of five, eight, and ten members, respectively, such that every member within a…
  4. CAT 2025 Slot 3 Quant Q13
    The rate of water flow through three pipes A, B and C are in the ratio 4 : 9 : 36. An empty tank can be…
  5. CAT 2024 Slot 1 Quant Q21
    Renu would take 15 days working 4 hours per day to complete a certain task whereas Seema would take 8 days…

Practise this question with timing, notes and your mistake notebook.

Practise in PrepSoc