Question 27

At their usual efficiency levels, AA and BB together finish a task in 1212 days. If AA had worked half as efficiently as she usually does, and BB had worked thrice as efficiently as he usually does, the task would have been completed in 99 days. How many days would AA take to finish the task if she works alone at her usual efficiency?

  1. A

    2424

    Answer A in PrepSoc practice
  2. B

    1212

    Answer B in PrepSoc practice
  3. C

    1818

    Answer C in PrepSoc practice
  4. D

    3636

    Answer D in PrepSoc practice

Answer this questionOr tap an option. Opens in practice mode, free, no sign-in.

Show answer and solution

Answer: (C)

1818

Solution

  • Equate total work: 12(a+b)=9(0.5a+3b)12(a + b) = 9(0.5a + 3b).

  • Divide by 3: 4a+4b=1.5a+9b  ⟹  2.5a=5b  ⟹  a=2b4a + 4b = 1.5a + 9b \implies 2.5a = 5b \implies a = 2b.

  • Since a=2ba = 2b, combined efficiency a+b=3ba + b = 3b, and AA accounts for 23\frac{2}{3} of the total daily output.

  • Total work =12×3=36= 12 \times 3 = 36 units (taking b=1,a=2b = 1, a = 2).

  • Time for AA alone =362=18= \frac{36}{2} = 18 days.

Detailed explanation

Concept: Time and Work Equations via Efficiency Ratios.

  1. Let the daily work efficiencies of AA and BB be aa units/day and bb units/day, respectively.

  2. Formulate the total work WW using the first condition (working together at normal efficiencies for 12 days):

    W=12(a+b)W = 12(a + b)

  3. Formulate the total work WW using the modified efficiencies (a2\frac{a}{2} for AA and 3b3b for BB, taking 9 days):

    W=9(a2+3b)W = 9\left(\frac{a}{2} + 3b\right)

  4. Equate the two expressions for total work:

    12(a+b)=9(a2+3b)12(a + b) = 9\left(\frac{a}{2} + 3b\right)

    Divide both sides by 3:

    4(a+b)=3(a2+3b)4(a + b) = 3\left(\frac{a}{2} + 3b\right)

    4a+4b=3a2+9b4a + 4b = \frac{3a}{2} + 9b

  5. Solve for the efficiency relationship between aa and bb:

    4a−3a2=9b−4b4a - \frac{3a}{2} = 9b - 4b

    5a2=5b  ⟹  a=2b\frac{5a}{2} = 5b \implies a = 2b

    Thus, AA is twice as efficient as BB.

  6. Calculate total work WW in terms of bb:

    W=12(a+b)=12(2b+b)=12×3b=36b unitsW = 12(a + b) = 12(2b + b) = 12 \times 3b = 36b\text{ units}

  7. Determine the time taken by AA working alone at normal efficiency (a=2ba = 2b):

    Days taken by A=Wa=36b2b=18 days\text{Days taken by } A = \frac{W}{a} = \frac{36b}{2b} = 18\text{ days}

    This corresponds to Option 3.

Practise similar questions

Practice 1 CAT_2019_SLOT1_QA_Q27_SQ01

At their usual efficiency levels, Pradeep and Qasim together complete a software project in 1515 days. If Pradeep had worked at one-third of his usual efficiency, and Qasim had worked at four times her usual efficiency, the project would have been completed in 1212 days. How many days would Pradeep take to complete the project alone at his usual efficiency?

  1. A

    2020

  2. B

    2525

  3. C

    3030

  4. D

    6060

Show answer and solution

Answer: (A)

2020

Solution

  • Equate total work: 15(p+q)=12(p3+4q)=4p+48q15(p + q) = 12\left(\frac{p}{3} + 4q\right) = 4p + 48q.

  • Simplify: 11p=33q  ⟹  p=3q11p = 33q \implies p = 3q.

  • With q=1q = 1 and p=3p = 3, total work W=15(3+1)=60W = 15(3 + 1) = 60 units.

  • Time for Pradeep alone =603=20= \frac{60}{3} = 20 days   ⟹  \implies Option 1.

Practice 2 CAT_2019_SLOT1_QA_Q27_SQ02

Working together at their normal printing rates, Machine M1M_1 and Machine M2M_2 complete a printing job in 2020 days. If Machine M1M_1 had operated at half of its normal rate, and Machine M2M_2 had operated at four times its normal rate, the job would have been completed in 1212 days. How many days would Machine M2M_2 take to complete the entire job alone at its normal rate?

  1. A

    3030

  2. B

    4545

  3. C

    6060

  4. D

    4040

Show answer and solution

Answer: (C)

6060

Solution

  • Equate total work: 20(m1+m2)=12(0.5m1+4m2)=6m1+48m220(m_1 + m_2) = 12(0.5m_1 + 4m_2) = 6m_1 + 48m_2.

  • Simplify: 14m1=28m2  ⟹  m1=2m214m_1 = 28m_2 \implies m_1 = 2m_2.

  • Total work with m2=1,m1=2m_2 = 1, m_1 = 2: W=20(2+1)=60W = 20(2 + 1) = 60 units.

  • Time for Machine M2M_2 alone =601=60= \frac{60}{1} = 60 days   ⟹  \implies Option 3.

Time & Work questions from other CAT papers

  1. CAT 2025 Slot 1 Quant Q16
    Arun, Varun and Tarun, if working alone, can complete a task in 24, 21, and 15 days, respectively. They…
  2. CAT 2025 Slot 2 Quant Q10
    Ankita is twice as efficient as Bipin, while Bipin is twice as efficient as Chandan. All three of them start…
  3. CAT 2025 Slot 3 Quant Q7
    Teams A, B, and C consist of five, eight, and ten members, respectively, such that every member within a…
  4. CAT 2025 Slot 3 Quant Q13
    The rate of water flow through three pipes A, B and C are in the ratio 4 : 9 : 36. An empty tank can be…
  5. CAT 2024 Slot 1 Quant Q21
    Renu would take 15 days working 4 hours per day to complete a certain task whereas Seema would take 8 days…

Practise this question with timing, notes and your mistake notebook.

Practise in PrepSoc