Question 32

Ramesh and Ganesh can together complete a work in 1616 days. After seven days of working together, Ramesh got sick and his efficiency fell by 30%30 \%. As a result, they completed the work in 1717 days instead of 1616 days. If Ganesh had worked alone after Ramesh got sick, in how many days would he have completed the remaining work?

  1. A

    13.513.5

    Answer A in PrepSoc practice
  2. B

    14.514.5

    Answer B in PrepSoc practice
  3. C

    1111

    Answer C in PrepSoc practice
  4. D

    1212

    Answer D in PrepSoc practice

Answer this questionOr tap an option. Opens in practice mode, free, no sign-in.

Show answer and solution

Answer: (A)

13.513.5

Solution

  • Remaining work normally takes 16−7=916 - 7 = 9 days at combined rate (R+G)(R + G).

  • With Ramesh at 70%70\% efficiency, it took 17−7=1017 - 7 = 10 days:

    10(0.7R+G)=9(R+G)  ⟹  7R+10G=9R+9G  ⟹  G=2R10(0.7R + G) = 9(R + G) \implies 7R + 10G = 9R + 9G \implies G = 2R

  • Total remaining work =9(R+G)=9(0.5G+G)=13.5G= 9(R + G) = 9(0.5G + G) = 13.5G.

  • Ganesh alone takes: 13.5GG=13.5\frac{13.5G}{G} = 13.5 days (Option 1).

Detailed explanation

Concept: Time and Work, Efficiency and Remaining Work.

  1. Let the daily work efficiencies of Ramesh and Ganesh be RR and GG units per day, respectively.

  2. Together, they can finish the entire job in 1616 days:

    Total Work=16(R+G)\text{Total Work} = 16(R + G)

  3. They work together for the first 77 days:

    Work completed in 7 days=7(R+G)\text{Work completed in } 7 \text{ days} = 7(R + G)

    Remaining Work=16(R+G)−7(R+G)=9(R+G)\text{Remaining Work} = 16(R + G) - 7(R + G) = 9(R + G)

  4. After 77 days, Ramesh's efficiency drops by 30%30\%, becoming (1−0.3)R=0.7R(1 - 0.3)R = 0.7R, while Ganesh continues at full efficiency GG.

    The entire project finishes in 1717 days, meaning the remaining work took 17−7=1017 - 7 = 10 days:

    10(0.7R+G)=9(R+G)10(0.7R + G) = 9(R + G)

  5. Simplify and solve for the relation between efficiencies:

    7R+10G=9R+9G7R + 10G = 9R + 9G

    10G−9G=9R−7R  ⟹  G=2R  ⟹  R=0.5G10G - 9G = 9R - 7R \implies G = 2R \implies R = 0.5G

  6. Express the remaining work purely in terms of GG:

    Remaining Work=9(R+G)=9(0.5G+G)=9(1.5G)=13.5G\text{Remaining Work} = 9(R + G) = 9(0.5G + G) = 9(1.5G) = 13.5G

  7. Time taken by Ganesh to complete the remaining work alone:

    Time=Remaining WorkG=13.5GG=13.5 days\text{Time} = \frac{\text{Remaining Work}}{G} = \frac{13.5G}{G} = 13.5 \text{ days}

  8. This corresponds to Option 1.

Practise similar questions

Practice 1 CAT_2018_SLOT2_QA_Q32_SQ01

Vikram and Arjun can together complete a project in 2020 days. After working together for eight days, Vikram fell sick and his efficiency dropped by 25%25\%. As a result, the project was completed in 2222 days instead of 2020 days. If Arjun had worked alone after Vikram fell sick, in how many days would he have completed the remaining work?

  1. A

    2828

  2. B

    2424

  3. C

    2626

  4. D

    3030

Show answer and solution

Answer: (A)

2828

Solution

  • The remaining work would normally take 20−8=1220 - 8 = 12 days at combined rate (V+A)(V + A).

  • With Vikram at 75%75\% efficiency, the remaining work took 22−8=1422 - 8 = 14 days:

    14(0.75V+A)=12(V+A)  ⟹  10.5V+14A=12V+12A  ⟹  2A=1.5V  ⟹  V=43A14(0.75V + A) = 12(V + A) \implies 10.5V + 14A = 12V + 12A \implies 2A = 1.5V \implies V = \frac{4}{3}A

  • Total remaining work =12(43A+A)=28A= 12\left(\frac{4}{3}A + A\right) = 28A.

  • Time for Arjun alone =28AA=28= \frac{28A}{A} = 28 days (Option 1).

Practice 2 CAT_2018_SLOT2_QA_Q32_SQ02

Priya and Tanvi can together complete a task in 1414 days. After five days of working together, Priya fell ill and her efficiency dropped by 40%40\%. As a result, they completed the task in 1515 days instead of 1414 days. If Tanvi had worked alone after Priya fell ill, in how many days would she have completed the remaining work?

  1. A

    1515

  2. B

    1212

  3. C

    1414

  4. D

    10.510.5

Show answer and solution

Answer: (B)

1212

Solution

  • Remaining work normally takes 14−5=914 - 5 = 9 days at rate (P+T)(P + T).

  • With Priya at 60%60\% efficiency, it took 15−5=1015 - 5 = 10 days:

    10(0.6P+T)=9(P+T)  ⟹  6P+10T=9P+9T  ⟹  T=3P  ⟹  P=13T10(0.6P + T) = 9(P + T) \implies 6P + 10T = 9P + 9T \implies T = 3P \implies P = \frac{1}{3}T

  • Total remaining work =9(P+T)=9(43T)=12T= 9(P + T) = 9\left(\frac{4}{3}T\right) = 12T.

  • Tanvi alone takes: 12TT=12\frac{12T}{T} = 12 days (Option 2).

Time & Work questions from other CAT papers

  1. CAT 2025 Slot 1 Quant Q16
    Arun, Varun and Tarun, if working alone, can complete a task in 24, 21, and 15 days, respectively. They…
  2. CAT 2025 Slot 2 Quant Q10
    Ankita is twice as efficient as Bipin, while Bipin is twice as efficient as Chandan. All three of them start…
  3. CAT 2025 Slot 3 Quant Q7
    Teams A, B, and C consist of five, eight, and ten members, respectively, such that every member within a…
  4. CAT 2025 Slot 3 Quant Q13
    The rate of water flow through three pipes A, B and C are in the ratio 4 : 9 : 36. An empty tank can be…
  5. CAT 2024 Slot 1 Quant Q21
    Renu would take 15 days working 4 hours per day to complete a certain task whereas Seema would take 8 days…

Practise this question with timing, notes and your mistake notebook.

Practise in PrepSoc