Practice Set 1: Foundation & Conceptual Drill

Comprehensive 25-question practice drill mirroring Chapter 5 Exercise 1 with fresh thematic scenarios and mathematically verified solutions.

Practice Set 1: Foundation & Speed Mastery

This practice set covers core foundation concepts and speed calculation patterns for Time and Work. Work through all 25 questions under timed conditions to test concept retention.

Traps and tips

  • Carefully parse the reference base before applying percentage or ratio multipliers.
  • Verify whether units require conversion (hours to minutes, km/h to m/s).
  • Cross-check your intermediate algebraic steps against physical constraints.

Practice questions

Question 1 · Foundation

A distributed computing network utilizes 25 identical automated crawler bots to index an enterprise knowledge base. Working concurrently at a uniform processing rate, the 25 bots can complete the entire indexing project in 20 days. What fraction of the knowledge base can be indexed by a single crawler bot working alone in 1 day?

  1. A

    1/20

  2. B

    1/100

  3. C

    1/250

  4. D

    1/500

Show answer and explanation

Answer: (D) 1/500

The rate at which work is executed depends on both the number of operational units and time. When 25 bots take 20 days to complete 1 entire project, the cumulative effort is 25 × 20 = 500 bot-days. Thus, 1 bot working for 1 day performs exactly 1/500 of the total work. A common student blunder is selecting 1/20, which is the fraction completed by all 25 bots working together in a single day, rather than by a single bot. Another common error is 1/250, resulting from mistakenly halving the total effort or confusing 25 × 20 with 250.

Question 2 · Foundation

An automated cybersecurity scanning engine operates with identical cloud audit agents. If 1 audit agent can inspect and verify 1 microservice repository in 1 day, how many microservice repositories can 12 identical audit agents inspect and verify in 12 days?

  1. A

    12

  2. B

    24

  3. C

    144

  4. D

    1,728

Show answer and explanation

Answer: (C) 144

This question tests the fundamental principle of joint proportionality: Work = Workers × Time × Rate. Since 1 agent inspects 1 repository in 1 day, the productivity rate is 1 repository per agent-day. When 12 agents operate simultaneously, they complete 12 repositories each day. Over a span of 12 days, their total output accumulates to 12 × 12 = 144 repositories. The option 12 is a classic cognitive trap where students mistakenly mirror the input numbers, confusing rate with cumulative output. The option 24 results from erroneously adding the workers and days (12 + 12), while 1,728 represents cubing 12.

Question 3 · Foundation

Pipeline Alpha can transfer a massive enterprise dataset to a secure cloud vault in 3 hours, whereas Pipeline Beta can complete the same data transfer in 5 hours. If both pipelines operate simultaneously from the start until the dataset is completely transferred, what fraction of the total dataset is transferred by Pipeline Alpha alone?

  1. A

    3/8

  2. B

    1/2

  3. C

    5/8

  4. D

    3/5

Show answer and explanation

Answer: (C) 5/8

When two agents work together over the same continuous time window, the amount of work completed by each agent is strictly proportional to their respective operating speeds (efficiencies). Pipeline Alpha finishes alone in 3 hours, while Pipeline Beta requires 5 hours. Therefore, their hourly efficiencies are in the ratio of (1/3) : (1/5) = 5 : 3. Out of 5 + 3 = 8 total parts of the dataset transferred, Pipeline Alpha contributes 5 parts and Pipeline Beta contributes 3 parts. Hence, Pipeline Alpha completes 5/8 of the total transfer. The distractor 3/8 is an intuitive trap caused by mistakenly placing Alpha's own time of 3 hours in the numerator, forgetting that faster entities take less time but complete a larger fraction of work.

Question 4 · Foundation

A high-pressure inlet valve can fill an industrial cooling reservoir in 8 hours, whereas a drainage outflow valve can empty the completely filled reservoir in 12 hours. If the reservoir is initially empty and both valves are opened simultaneously, in how many hours will the reservoir be completely filled?

  1. A

    4

  2. B

    16

  3. C

    20

  4. D

    24

Show answer and explanation

Answer: (D) 24

In problems involving pipes and cisterns with opposing effects, the filling pipe performs positive work while the emptying pipe performs negative work. Rather than subtracting or adding the time taken by each pipe directly, one must subtract their hourly rates of work. The inlet valve contributes +1/8 of the tank per hour, while the drainage valve removes 1/12 of the tank per hour. The net accumulation rate is 1/8 - 1/12 = (3 - 2)/24 = 1/24 of the tank per hour. At a net rate of 1/24 per hour, filling the entire reservoir requires exactly 24 hours. A frequent error is computing 12 - 8 = 4 hours, which confuses time durations with rates of flow.

Question 5 · Foundation

Senior software engineer Anya can build a backend microservices module alone in 15 days, while engineer Boris can build the same module alone in 20 days. Collaborating with an external contractor, Chen, the three engineers complete the entire module together in 5 days. If the total contract fee paid for the module is ₹48,000, what is the earnings share received by Anya?

  1. A

    ₹12,000

  2. B

    ₹16,000

  3. C

    ₹20,000

  4. D

    ₹24,000

Show answer and explanation

Answer: (B) ₹16,000

Wages earned on a collaborative project are split based on the proportion of total work each worker contributes. Anya can finish the job alone in 15 days, so in the 5 days she worked on the project, she completed 5/15 = 1/3 of the entire project. Her share of the total compensation of ₹48,000 must therefore be exactly 1/3 × ₹48,000 = ₹16,000. An important exam insight is that you do not need to calculate Chen's individual rate or efficiency to determine Anya's payment, because Anya's work output depends only on her own rate and the number of days she worked. Distractor ₹12,000 is Boris's share (1/4 × ₹48,000), while ₹20,000 is Chen's share (5/12 × ₹48,000), and ₹24,000 is an erroneous 50% split.

Question 6 · Foundation

An enterprise data engineering team needs to ingest and index an extensive historical transaction archive. Pipeline Alpha can complete the entire ingestion task in 36 hours of continuous standalone processing, whereas Pipeline Beta requires 45 hours of continuous standalone processing to execute the exact same workload. If both pipelines operate simultaneously in parallel without any resource contention, how many hours will they take to complete the ingestion of the transaction archive together?

  1. A

    16 hours

  2. B

    18 hours

  3. C

    20 hours

  4. D

    24 hours

Show answer and explanation

Answer: (C) 20 hours

When two independent pipelines operate concurrently on the same task, their work rates sum up. With standalone completion times of 36 hours and 45 hours, assuming a convenient common workload of LCM(36, 45) = 180 units simplifies the arithmetic: Pipeline Alpha processes 5 units per hour and Pipeline Beta processes 4 units per hour. Operating together, they process 5 + 4 = 9 units per hour, finishing the 180-unit workload in 180 / 9 = 20 hours. Option 18 hours represents the erroneous belief that adding a second worker cuts the faster worker's time in half, 24 hours comes from imprecise harmonic averaging, and 16 hours is an arbitrary underestimate.

Question 7 · Foundation

Two industrial additive manufacturing systems, Fabrication Unit P and Fabrication Unit Q, working concurrently, can complete the 3D printing of a production run of aerospace brackets in 30 hours. The manufacturing throughput (efficiency) of Unit P and Unit Q is in the ratio 3:53 : 5. Working independently, how many hours would the faster fabrication unit take to complete the entire production run alone?

  1. A

    42 hours

  2. B

    48 hours

  3. C

    60 hours

  4. D

    80 hours

Show answer and explanation

Answer: (B) 48 hours

Because efficiency is directly proportional to the rate of work done, the combined rate of Unit P and Unit Q equals 3 + 5 = 8 relative units per hour. In 30 hours of joint operation, the total workload fabricated is 8 * 30 = 240 relative units. The faster machine is Unit Q, whose rate is 5 relative units per hour. Operating in isolation, Unit Q requires 240 / 5 = 48 hours to complete the job. Option 80 hours is the time required by the slower unit alone, 60 hours corresponds to naively assuming equal efficiency where two identical machines double the time, and 42 hours is an arithmetic slip.

Question 8 · Foundation

Three autonomous sorting robots in an omnichannel fulfillment center—Bot X, Bot Y, and Bot Z—require times in the ratio 3:5:63 : 5 : 6 to individually process identical batches of inventory. What is the ratio of the volume of inventory processed by Bot X, Bot Y, and Bot Z in a one-hour operating interval?

  1. A

    6 : 5 : 3

  2. B

    10 : 6 : 5

  3. C

    5 : 6 : 10

  4. D

    9 : 25 : 36

Show answer and explanation

Answer: (B) 10 : 6 : 5

Because work rate is inversely related to time taken, the volume of work finished in one hour is proportional to the reciprocal of the total duration required. With completion times in the ratio 3 : 5 : 6, the rates are in the ratio 1/3 : 1/5 : 1/6. Multiplying through by the LCM of 30 produces the whole-number ratio 10 : 6 : 5. Option 6 : 5 : 3 is a frequent student trap resulting from simply reversing the order of numbers (a method that only works for two-variable ratios, not three), 5 : 6 : 10 is an inverted sequence error, and 9 : 25 : 36 squares the times instead of inverting them.

Question 9 · Foundation

In a distributed stream-processing architecture, three microservices—Ingestor, Parser, and Indexer—work concurrently to process incoming event payloads. Their processing efficiencies (measured in gigabytes processed per minute) are in the ratio 5:7:85 : 7 : 8, respectively. If all three microservices run simultaneously for the entire duration of a large indexing job, what fraction of the total data volume was processed by the Parser?

  1. A

    7/20

  2. B

    7/15

  3. C

    1/4

  4. D

    2/5

Show answer and explanation

Answer: (A) 7/20

Because work completed equals rate multiplied by time, and all three microservices run concurrently for the identical duration, elapsed time factors out completely. The total work performed divides in direct proportion to their individual efficiencies: 5 parts for Ingestor, 7 parts for Parser, and 8 parts for Indexer, giving a total of 5 + 7 + 8 = 20 parts. Therefore, Parser executes 7/20 of the complete job. Option 1/4 (5/20) represents the fraction done by Ingestor, 2/5 (8/20) represents the fraction done by Indexer, and 7/15 is a calculation trap where one of the services is omitted from the denominator.

Question 10 · Foundation

In a specialized aeronautical fabrication plant, Industrial Laser Cutter Alpha is 40%40\% more efficient than Industrial Laser Cutter Beta at cutting titanium alloy sheets. What is the ratio of the work completed by Cutter Alpha to that completed by Cutter Beta in a one-hour operating cycle?

  1. A

    5 : 7

  2. B

    7 : 5

  3. C

    14 : 1

  4. D

    Cannot be determined

Show answer and explanation

Answer: (B) 7 : 5

Efficiency measures the rate of output per unit of time. Being 40% more efficient means Cutter Alpha produces 140 units of work for every 100 units produced by Cutter Beta in any identical operating timeframe. The ratio of their hourly outputs is therefore 140 : 100, which reduces to 7 : 5. Option 5 : 7 is the inverted ratio (Beta to Alpha or the inverse ratio of time taken), 14 : 1 results from a decimal scaling error, and 'Cannot be determined' is a conceptual distractor for those who incorrectly assume total job duration or absolute dimensions are required.

Question 11 · Foundation

A cloud infrastructure platform utilizes 88 enterprise GPU compute instances that can complete a complex deep learning model training run in 1515 days. To reduce computing costs, the platform evaluates standard CPU instances, each of which processes training data at half the speed of an enterprise GPU instance. In how many days can 1212 standard CPU instances complete the exact same model training run?

  1. A

    10 days

  2. B

    20 days

  3. C

    24 days

  4. D

    30 days

Show answer and explanation

Answer: (B) 20 days

The rate of work of an agent is directly proportional to its operating efficiency. Here, a CPU instance operates at half the speed of an enterprise GPU instance (1 CPU=0.5 GPU1\text{ CPU} = 0.5\text{ GPU}). Therefore, a team of 1212 CPU instances possesses the combined processing power of 12×0.5=612 \times 0.5 = 6 GPU instances. The total work required is 8 instances×15 days=120 GPU-days8\text{ instances} \times 15\text{ days} = 120\text{ GPU-days}. With an effective capacity of 66 GPU instances, the time required to complete the training run is 120 GPU-days6 GPU instances=20 days\frac{120\text{ GPU-days}}{6\text{ GPU instances}} = 20\text{ days}. The common distractor 10 days10\text{ days} occurs when one assumes CPU instances operate at equal speed to GPU instances (12012=10\frac{120}{12} = 10).

Question 12 · Foundation

In an automated additive manufacturing center, three industrial 3D printing units—Unit Alpha, Unit Beta, and Unit Gamma—work on identical structural components. Units Alpha and Beta working together can complete an order in 1212 hours. Units Beta and Gamma working together can complete the order in 1515 hours. Units Alpha and Gamma working together can complete the order in 2020 hours. Which of the three units is the slowest when operating alone?

  1. A

    Unit Alpha

  2. B

    Unit Beta

  3. C

    Unit Gamma

  4. D

    Cannot be determined

Show answer and explanation

Answer: (C) Unit Gamma

To find the slowest worker among three workers given pairwise completion times, one can either compute their individual work rates or use the exclusion principle. Assuming a total work of LCM⁡(12,15,20)=60 units\operatorname{LCM}(12, 15, 20) = 60\text{ units}, the rates of the pairs are A+B=5A + B = 5, B+C=4B + C = 4, and A+C=3A + C = 3 units per hour. Adding all three gives 2(A+B+C)=122(A + B + C) = 12, so A+B+C=6A + B + C = 6 units per hour. Subtracting each pair rate reveals individual rates: C=6−5=1C = 6 - 5 = 1, A=6−4=2A = 6 - 4 = 2, and B=6−3=3B = 6 - 3 = 3 units per hour. Unit Gamma has the lowest rate (1 unit/hour1\text{ unit/hour}) and would take the longest time alone (60 hours60\text{ hours}), making it the slowest. Alternatively, by the exclusion rule: the pair (A+B)(A+B) finishes fastest (12 hours12\text{ hours}), which means the worker excluded from it (Gamma) contributes the least overall and is the slowest.

Question 13 · Foundation

In an automated aerospace manufacturing facility, Robotic Welding Station Alpha can complete a fuselage joint assembly alone in 1414 shifts, whereas Robotic Welding Station Beta can complete the identical assembly alone in 3535 shifts. If the two robotic stations are scheduled to operate on alternate shifts (working exactly one shift at a time), which of the following statements is true regarding the total number of shifts required to complete the assembly?

  1. A

    The assembly is completed in the fewest shifts if Station Alpha starts

  2. B

    The assembly is completed in the fewest shifts if Station Beta starts

  3. C

    The assembly is completed in the exact same number of shifts irrespective of which station starts

  4. D

    The assembly completion time cannot be determined without knowing the total number of welds

Show answer and explanation

Answer: (C) The assembly is completed in the exact same number of shifts irrespective of which station starts

In alternating work problems, whether the choice of starting worker influences the total completion time depends entirely on whether the total work is an exact multiple of the cycle capacity. Taking the total work as LCM⁡(14,35)=70 units\operatorname{LCM}(14, 35) = 70\text{ units}, Station Alpha produces 55 units per shift and Station Beta produces 22 units per shift. Together, any continuous pair of shifts delivers 5+2=75 + 2 = 7 units of work. Dividing 7070 by 77 gives exactly 1010 full two-shift cycles, totaling 2020 shifts. If Alpha starts, 6363 units are completed in 1818 shifts, Alpha adds 55 units on shift 1919, and Beta finishes the remaining 22 units on shift 2020. If Beta starts, 6363 units are completed in 1818 shifts, Beta adds 22 units on shift 1919, and Alpha finishes the remaining 55 units on shift 2020. Because both scenarios terminate precisely at the end of the 20th20\text{th} shift, the total duration is identical regardless of who starts.

Question 14 · Foundation

Two autonomous robotic tunneling rigs, Rig P and Rig Q, can excavate an underground utility conduit in 3030 days and 4545 days, respectively, when operating independently. Rig P commences excavation alone and operates for 1010 days. At that point, Rig Q is deployed alongside Rig P to work together until the conduit excavation is completed. In how many additional days will the conduit excavation be completed?

  1. A

    12 days

  2. B

    18 days

  3. C

    20 days

  4. D

    22 days

Show answer and explanation

Answer: (A) 12 days

When a project is carried out in phases with varying worker counts, the work done in each phase is computed sequentially. Choosing a total workload of LCM⁡(30,45)=90 units\operatorname{LCM}(30, 45) = 90\text{ units}, Rig P excavates 33 units per day and Rig Q excavates 22 units per day. In the first 1010 days, Rig P works alone and excavates 10×3=3010 \times 3 = 30 units, leaving 90−30=6090 - 30 = 60 units of excavation remaining. When Rig Q joins Rig P, their combined rate becomes 3+2=53 + 2 = 5 units per day. The additional time required to clear the remaining 6060 units is 605=12\frac{60}{5} = 12 days. The distractor 22 days22\text{ days} represents the total elapsed time (10+1210 + 12), while 18 days18\text{ days} is the time required had both rigs worked together from the beginning (905\frac{90}{5}).

Question 15 · Foundation

In an advanced aerospace components manufacturing plant, 1515 precision CNC robotic cells produce 1313 high-pressure titanium valves in 66 days. How many such CNC robotic cells are required to produce 169169 high-pressure titanium valves in 3030 days?

  1. A

    33

  2. B

    36

  3. C

    39

  4. D

    45

Show answer and explanation

Answer: (C) 39

Under the chain rule of time and work, the work output is directly proportional to both the number of workers and the number of days, giving the invariant relation M×DW=constant\frac{M \times D}{W} = \text{constant}. For the first scenario, 15×613=9013\frac{15 \times 6}{13} = \frac{90}{13}. For the second scenario, the expression becomes M2×30169\frac{M_2 \times 30}{169}. Equating both expressions yields M2=90×16930×13=3×13=39M_2 = \frac{90 \times 169}{30 \times 13} = 3 \times 13 = 39 robotic cells. Conceptually, the work requirement increases by a factor of 16913=13\frac{169}{13} = 13, while the available time expands by a factor of 306=5\frac{30}{6} = 5. Since more days reduce the required cell count, the needed machines scale by 15×135=3915 \times \frac{13}{5} = 39.

Question 16 · Foundation

In an automated fulfillment hub, an initial fleet of 6 autonomous mobile robots (AMRs) can pack and sort a scheduled consignment of warehouse shipments in a certain number of shifts. When 4 additional identical AMRs are deployed to the fleet, the entire consignment is processed in 8 fewer shifts. How many shifts would a smaller team of 4 such AMRs require to sort and pack the identical consignment?

  1. A

    24 shifts

  2. B

    30 shifts

  3. C

    36 shifts

  4. D

    45 shifts

Show answer and explanation

Answer: (B) 30 shifts

Because the total work remains constant, the product of fleet size and shifts required is invariant. Equating 6×S=10×(S−8)6 \times S = 10 \times (S - 8) yields S=20S = 20 shifts, meaning the total consignment workload is 6×20=1206 \times 20 = 120 robot-shifts. Therefore, a team of 4 robots will take 120/4=30120 / 4 = 30 shifts to complete the work.

Question 17 · Foundation

A cluster of identical cloud worker nodes in a distributed streaming pipeline can process and index a massive genomic sequence dataset in 9 hours. If 6 nodes encounter hardware failures and are taken offline, the remaining active nodes require 15 hours to process the identical dataset at the same uniform rate. How many worker nodes were originally operating in the cluster?

  1. A

    10 nodes

  2. B

    12 nodes

  3. C

    15 nodes

  4. D

    18 nodes

Show answer and explanation

Answer: (C) 15 nodes

Since total compute workload is fixed, the number of nodes varies inversely with time. The ratio of times is 9:15=3:59 : 15 = 3 : 5, which implies the ratio of worker nodes is 5:35 : 3. The difference of 5−3=25 - 3 = 2 units represents the 6 failed nodes, so 1 unit corresponds to 3 nodes. The initial cluster size was 5×3=155 \times 3 = 15 nodes.

Question 18 · Foundation

Devanshi, a senior software engineer, can complete a microservices refactoring project alone in 18 days. She begins the refactoring work alone and works for 6 days before being reassigned to an urgent production outage. Tushar, a lead systems engineer who can complete the entire refactoring project independently in 27 days, then takes over and finishes the remaining work alone. In total, how many days did it take from the start to complete the entire refactoring project?

  1. A

    18 days

  2. B

    21 days

  3. C

    24 days

  4. D

    27 days

Show answer and explanation

Answer: (C) 24 days

In 6 days, Devanshi completes 6/18=1/36 / 18 = 1/3 of the refactoring project, leaving 1−1/3=2/31 - 1/3 = 2/3 of the work uncompleted. Tushar takes (2/3)×27=18(2/3) \times 27 = 18 days to finish the remaining work alone. Consequently, the total time required to complete the project is 6+18=246 + 18 = 24 days.

Question 19 · Foundation

In an advanced additive manufacturing facility, a high-precision laser sintering system (Unit A) is 3 times as efficient as a conventional filament-based 3D printing system (Unit B). Due to this difference in throughput speed, Unit B requires 16 days more than Unit A to produce a standardized batch of titanium aerospace brackets. If both printing systems work concurrently on the same batch, in how many days will the production run be completed?

  1. A

    4.5 days

  2. B

    6 days

  3. C

    8 days

  4. D

    10 days

Show answer and explanation

Answer: (B) 6 days

Because Unit A is 3 times as efficient as Unit B, their times are in the ratio 1:31 : 3. The difference of 2 ratio units corresponds to 16 days, meaning 1 unit equals 8 days. Hence, Unit A takes 8 days and Unit B takes 24 days. Working together, their combined daily rate is 1/8+1/24=4/24=1/61/8 + 1/24 = 4/24 = 1/6 of the batch per day, completing the run in 6 days.

Question 20 · Foundation

Two civil engineering contractors, Firm Alpha and Firm Beta, can independently complete a site excavation and grading project in 18 days and 27 days, respectively. Under a turnkey infrastructure contract, they are required to finish the entire project in exactly 6 days for a fixed total fee of ₹16,200. To meet this tight deadline, they subcontract specialized heavy earthmoving machinery from Firm Gamma and complete the work on schedule in 6 days. What is Firm Gamma's rightful share of the total contract fee?

  1. A

    ₹5,400

  2. B

    ₹6,000

  3. C

    ₹7,200

  4. D

    ₹8,100

Show answer and explanation

Answer: (C) ₹7,200

In 6 days, Alpha and Beta complete 6×(1/18+1/27)=6×(5/54)=30/54=5/96 \times (1/18 + 1/27) = 6 \times (5/54) = 30/54 = 5/9 of the total project. To complete the project on time, Gamma must execute the remaining 1−5/9=4/91 - 5/9 = 4/9 of the total work. Since payment is divided in proportion to the work performed, Gamma's share is (4/9)×₹16,200=₹7,200(4/9) \times ₹16,200 = ₹7,200.

Question 21 · Foundation

In an advanced manufacturing facility, automated 3D printer Alpha can fabricate 8484 specialized titanium components in 99 days, while automated 3D printer Beta can fabricate 5656 identical components in 1212 days. Working simultaneously at their respective constant speeds, how many days will both printers take to fabricate 168168 of these components?

  1. A

    10 days

  2. B

    12 days

  3. C

    14 days

  4. D

    16 days

Show answer and explanation

Answer: (B) 12 days

The problem tests the principle of additive productivity. Printer Alpha produces 84 components in 9 days, which simplifies to 28/3 components per day. Printer Beta produces 56 components in 12 days, which simplifies to 14/3 components per day. When both printers run concurrently, their individual daily outputs combine additively: 28/3 + 14/3 = 42/3 = 14 components per day. To produce the required batch of 168 components, the facility requires 168 / 14 = 12 days.

Question 22 · Foundation

Two industrial feeder pumps, P1P_1 and P2P_2, can independently fill a coolant reservoir in 24 minutes24\text{ minutes} and 36 minutes36\text{ minutes}, respectively. Both pumps are activated simultaneously, but pump P1P_1 is shut down after 6 minutes6\text{ minutes}. What is the total time required from the start to completely fill the reservoir?

  1. A

    21 minutes

  2. B

    24 minutes

  3. C

    27 minutes

  4. D

    30 minutes

Show answer and explanation

Answer: (C) 27 minutes

The filling process takes place in two consecutive stages. Taking the reservoir capacity as LCM(24, 36) = 72 units, pump P_1 delivers 3 units/min and pump P_2 delivers 2 units/min. Working jointly for the first 6 minutes, both pumps fill 6 × (3 + 2) = 30 units, leaving 72 - 30 = 42 units unfilled. Once P_1 is turned off, P_2 continues solo at 2 units/min, taking 42 / 2 = 21 minutes to finish the remainder. The total time from start to completion is therefore 6 + 21 = 27 minutes. Beware of the distractor 21 minutes, which reflects only the second stage.

Question 23 · Foundation

Three automated supply lines, L1L_1, L2L_2, and L3L_3, can independently fill a municipal water treatment buffer tank in 12 hours12\text{ hours}, 20 hours20\text{ hours}, and 30 hours30\text{ hours}, respectively. If each supply line is opened sequentially for exactly one hour at a time in the order L1L_1, followed by L2L_2, followed by L3L_3, and this cycle repeats until the tank is completely full, how long will it take to fill the tank?

  1. A

    15 hours

  2. B

    18 hours

  3. C

    21 hours

  4. D

    24 hours

Show answer and explanation

Answer: (B) 18 hours

Under sequential alternating operation, work proceeds in 3-hour repeating blocks. With a total capacity of LCM(12, 20, 30) = 60 units, line L_1 provides 5 units in hour 1, line L_2 provides 3 units in hour 2, and line L_3 provides 2 units in hour 3. Thus, each 3-hour block delivers exactly 5 + 3 + 2 = 10 units of water. To reach the full capacity of 60 units, exactly 60 / 10 = 6 full blocks are needed. With each block lasting 3 hours, the total time required is 6 × 3 = 18 hours.

Question 24 · Foundation

A rectangular drainage basin measuring 8 m×5 m×6 m8\text{ m} \times 5\text{ m} \times 6\text{ m} is equipped with an intake pipe and a discharge valve. The intake pipe feeds water at a uniform rate of 6 m3/h6\text{ m}^3/\text{h}, while the discharge valve alone can completely drain the full basin in 24 hours24\text{ hours}. If the basin is currently half full and both the intake pipe and discharge valve are opened simultaneously, how much time will it take to empty the basin completely?

  1. A

    15 hours

  2. B

    24 hours

  3. C

    30 hours

  4. D

    60 hours

Show answer and explanation

Answer: (C) 30 hours

First calculate the total volume of the rectangular basin: 8 m × 5 m × 6 m = 240 m³. The discharge valve empties this full volume in 24 hours, giving an outflow rate of 240 / 24 = 10 m³/h. With the intake pipe supplying water at 6 m³/h, the net rate of water loss is 10 - 6 = 4 m³/h. Since the basin starts half full, the volume to be emptied is 240 / 2 = 120 m³. At a net drainage rate of 4 m³/h, emptying the basin takes 120 / 4 = 30 hours. Distractor 60 hours arises if the half-full condition is overlooked.

Question 25 · Foundation

A robotic maintenance crawler located at the base of a 45-metre45\text{-metre} vertical ventilation shaft attempts to climb to the exhaust opening at the top. In each climbing cycle, the crawler ascends 1.4 metres1.4\text{ metres} along the wall, but due to surface moisture, it slips back 0.8 metres0.8\text{ metres} before locking its grip. How many complete climbing cycles are required for the crawler to emerge from the top of the shaft?

  1. A

    73

  2. B

    74

  3. C

    75

  4. D

    76

Show answer and explanation

Answer: (B) 74

Problems involving climbing with slippage require careful treatment of the final step. In each complete cycle, the crawler advances 1.4 m and slips 0.8 m, giving a net displacement of 0.6 m. However, once the crawler reaches or passes the 45-metre rim during the ascent portion of a stroke, it exits the shaft and experiences no further slip. Subtracting the final 1.4 m stroke from the 45 m total height gives a threshold of 43.6 m. To reach or exceed 43.6 m with 0.6 m net progress per cycle requires 43.6 / 0.6 ≈ 72.67, which rounds up to 73 complete cycles. After 73 cycles, the crawler rests at 73 × 0.6 = 43.8 m. On the 74th cycle, its 1.4 m climb reaches 43.8 + 1.4 = 45.2 m, surpassing the 45 m summit. Thus, exactly 74 cycles are needed. Naively calculating 45 / 0.6 = 75 incorrectly assumes a slip occurs after the summit is already reached.

Try real CAT questions

Study this concept with interactive practice in PrepSoc.

Open the concept library