Practice Set 2: Advanced & CAT Exam-Level Drill
Rigorous 25-question advanced drill mirroring Chapter 5 Exercise 2 with multi-variable constraints and authentic CAT-level traps.
Practice Set 2: Advanced & CAT Exam-Level Drill
This advanced set tests multi-step problems, subtle algebraic traps, and non-trivial speed shortcuts for Time and Work. Solve without looking at hints for full exam simulation.
Traps and tips
- Watch out for multi-entity dependent chains where variables depend on intermediate quantities.
- Check for boundary cases and integer constraints before picking options.
- Leverage standard speed shortcuts to eliminate distractor options within 30 seconds.
Practice questions
Question 1 · CAT Level
An enterprise cloud analytics firm deploys two automated containerized pipelines, Pipeline Alpha and Pipeline Beta, to index and compress an enterprise data lake. Pipeline Alpha working alone can complete the entire indexing task in 10 days, whereas Pipeline Beta working alone requires 15 days to complete the exact same task. Both pipelines are initiated simultaneously and execute together for several days. Pipeline Alpha is then decommissioned due to scheduled node maintenance, after which Pipeline Beta continues alone to complete the remaining workload. If the entire indexing task takes exactly 9 days from start to finish, for how many days did Pipeline Alpha operate?
Show answer and explanation
Answer: (B) 4 days
When one participant works continuously for the full project timeframe while another leaves early, the simplest shortcut is to subtract the entire output of the continuous worker from the total work. Here, Pipeline Beta works for all 9 days, contributing 18 out of the 30 total units. The remaining 12 units must have been completed by Pipeline Alpha. Dividing 12 units by Alpha's daily rate of 3 units/day immediately yields 4 days. Common errors include selecting 5 days, which is the time Beta spent working alone after Alpha quit, or picking 6 days, which is the time both pipelines would take if working together to complete the entire 30 units.
Question 2 · CAT Level
Three specialized autonomous robotics teams—Team Apex, Team Beacon, and Team Cobalt—are commissioned to assemble a modular orbital satellite structure. Working concurrently, all three teams complete 50% of the entire assembly in 3 days. All three teams commence the project simultaneously, but at the end of the third day, Team Beacon is reassigned to another mission. Teams Apex and Cobalt continue working together and complete one-fifth of the total assembly over the next 2 days, after which Team Apex departs. The remaining portion of the assembly is completed by Team Cobalt working alone in 9 days. In how many days can Team Apex working alone assemble the entire satellite structure?
Show answer and explanation
Answer: (B) 15 days
This problem tests structured phase-by-phase rate isolation. By choosing a total work of 120 units, the fractions 1/2 and 1/5 become neat integers (60 and 24 units). In Phase 1, A + B + C complete 60 units in 3 days (rate = 20 units/day). In Phase 2, A + C complete 24 units in 2 days (rate = 12 units/day). The remaining work after both phases is 120 - 84 = 36 units, which Cobalt completes alone in 9 days, giving Cobalt's rate as 36 / 9 = 4 units/day. Subtracting Cobalt's rate from the combined rate of A + C gives Apex's rate as 12 - 4 = 8 units/day. Therefore, Apex alone needs 120 / 8 = 15 days. Common mistakes include confusing the combined rate of A + C (12 units/day, which would complete the job in 10 days) or Beacon's rate with Apex's rate.
Question 3 · CAT Level
Three cybersecurity researchers—Agent Drake, Agent Ellis, and Agent Finch—collaborate on an urgent vulnerability audit contract and share a total bounty of $5,700 upon completing the assignment together. If working individually, Agent Drake, Agent Ellis, and Agent Finch could complete the entire vulnerability audit in 4 days, 6 days, and 9 days, respectively. Assuming each researcher worked for the entire duration of the project at their standard pace, what is the payout received by Agent Finch?
Show answer and explanation
Answer: (C) \$1,200
Wages in collaborative projects must be divided in proportion to the total work delivered. When all participants work for the exact same duration, their earnings are strictly proportional to their daily rates of work, which are inversely proportional to their individual completion times. For completion times of 4, 6, and 9 days, the rate ratio is 1/4 : 1/6 : 1/9 = 9 : 6 : 4. With 19 total parts dividing the $5,700 contract, each part equals $300. Agent Finch corresponds to 4 parts, yielding 4 × $300 = $1,200. A frequent trap is dividing wages in direct proportion to the days taken (which would erroneously reward the slowest worker the most), or confusing Agent Finch's share with Agent Ellis's share of $1,800.
Question 4 · CAT Level
A precision industrial immersion cooling reservoir is equipped with three inlet feed pipes, Pipe X, Pipe Y, and Pipe Z, which can fill the empty reservoir independently in 10 minutes, 12 minutes, and 15 minutes, respectively. Initially, all three inlet pipes are opened simultaneously into the empty reservoir and operate together for exactly 2 minutes. At that instant, Pipe X and Pipe Y are shut off, while Pipe Z remains open, and a drainage purge valve that can empty a completely full reservoir in 24 minutes is opened simultaneously. How much additional time will be required to fill the reservoir completely?
Show answer and explanation
Answer: (C) 20 minutes
This problem illustrates multi-stage flow dynamics in pipes and cisterns. With total capacity chosen as LCM(10, 12, 15, 24) = 120 units, the initial 2-minute combined rate of X, Y, and Z is 12 + 10 + 8 = 30 units/min, filling 60 units (half the tank). After X and Y are shut off and the drainage valve opens, Pipe Z (+8 units/min) and the drainage valve (-5 units/min) operate simultaneously, yielding a net positive filling rate of 8 - 5 = +3 units/min. To fill the remaining 60 units at +3 units/min requires 60 / 3 = 20 minutes. Common errors include forgetting that Pipe Z stays open (which would mean the tank drains instead of fills), omitting the drain's opposing flow (yielding 60 / 8 = 7.5 minutes), or confusing the total elapsed time (22 minutes) with the additional time (20 minutes).
Question 5 · CAT Level
A high-capacity bioreactor tank in a pharmaceutical production facility is filled using three automated dosing pumps: Pump A, Pump B, and Pump C. Working alone, Pump A can fill the empty tank in 40 minutes, Pump B can fill it in 30 minutes, and Pump C can fill it in 24 minutes. On a production morning, Pump A is activated at 8:00 a.m. Pump B is brought online at 8:12 a.m., and Pump C is activated at 8:20 a.m. If all activated pumps continue operating continuously at their standard rates, at what exact time will the bioreactor tank be completely full?
Show answer and explanation
Answer: (B) 8:22:20 a.m.
Staggered start pipe problems are best solved by synchronizing at the moment the final pump turns on. Here, Pump C turns on at 8:20 a.m. Prior to 8:20 a.m., Pump A has run for 20 minutes (filling 60 units) and Pump B has run for 8 minutes (filling 32 units). Together, they have filled 92 of the 120 total units, leaving 28 units. After 8:20 a.m., all three pumps work together with a combined rate of 3 + 4 + 5 = 12 units/min. The remaining 28 units require 28 / 12 = 7/3 minutes = 2 minutes and 20 seconds. Adding 2 minutes 20 seconds to 8:20 a.m. gives the completion time of 8:22:20 a.m. A common trap is miscalculating the elapsed run-time of Pump B as 12 minutes (the timestamp) rather than 8 minutes (the interval from 8:12 to 8:20), which produces an incorrect completion time.
Question 6 · CAT Level
In an automated pharmaceutical manufacturing facility, a cylindrical bioreactor vessel is filled with a sterile nutrient broth using two precision inlet feed pumps, Pump Alpha and Pump Beta. Working independently at constant rates, Pump Alpha can fill the entire empty vessel in , while Pump Beta can fill it in . The vessel is fitted with an emergency overflow drainage valve positioned at of the vessel's total height above the base. Once the liquid level reaches or exceeds this valve, the valve begins discharging broth at a constant rate that would empty a completely full vessel in (provided no inlet pumps are operating). If both Pump Alpha and Pump Beta are started simultaneously when the bioreactor vessel is completely empty, how much total time will it take to fill the vessel completely?
Show answer and explanation
Answer: (C) 7 1/3 hours
The key insight in problems with height-dependent leaks or drainage valves is that the leak only affects liquid levels at or above its mounting point. For the first two-thirds of the vessel, only the two inlet pumps operate, filling 20 out of 30 units in 20 / 5 = 4 hours. For the final one-third (10 units), the drainage valve discharges fluid at 2 units/hour, reducing the effective filling rate to 5 - 2 = 3 units/hour, which takes 10 / 3 = 3 1/3 hours. The total time is 4 + 3 1/3 = 7 1/3 hours (7 hours 20 minutes). Option 6 2/3 hours results from assuming the leak applies only to the top half, 7 hours ignores the fractional slowdown, and 7 5/6 hours results from miscalculating the net rate as 5 - 1.5 units/hour.
Question 7 · CAT Level
Three compute worker nodes—Node Alpha, Node Beta, and Node Gamma—can process a massive batch of financial transactions independently in , , and respectively. All three nodes are deployed simultaneously to process the transaction batch. However, due to initial memory bandwidth throttling, Node Alpha operates at only of its normal processing rate for the first , while Node Beta operates at only of its normal processing rate for the first . Node Gamma operates at its full normal processing rate from the start. Both Node Alpha and Node Beta resume their full normal processing rates immediately after their respective throttling periods end. In how many hours will the entire transaction batch be completely processed?
Show answer and explanation
Answer: (B) 6 1/4 hours
Instead of setting up multiple piecewise algebraic equations, top test-takers use the deficit principle: if all nodes had worked unhindered at full capacity (12 units/hour), Node Alpha caused a deficit of 3 × (5 - 2) = 9 units, and Node Beta caused a deficit of 2 × (4 - 1) = 6 units. Adding this 15-unit deficit to the baseline 60 units means the cluster must deliver the equivalent of 75 units at the full combined rate of 12 units/hour, yielding exactly 75 / 12 = 6 1/4 hours (6 hours 15 minutes). Option 5 3/4 hours prematurely restores Alpha's full capacity at hour 2, 6 1/2 hours erroneously throttles Beta for 3 hours instead of 2, and 7 hours ignores Beta's partial output during its throttling window.
Question 8 · CAT Level
In a high-density AI data center, a dedicated liquid coolant reservoir is maintained by two inlet feeds and one drainage line. Coolant Feed Alpha supplies coolant at a fixed volumetric rate of . Coolant Feed Beta, working independently, can completely fill the empty reservoir in . Drainage Line Gamma can completely empty a full reservoir in . When all three lines—Feed Alpha, Feed Beta, and Drainage Line Gamma—are opened simultaneously on a completely empty reservoir, the reservoir becomes completely filled in exactly . What is the total volumetric capacity of the coolant reservoir?
Show answer and explanation
Answer: (C) 240 litres
When dealing with a mixture of absolute flow rates (litres/hour) and proportional fill times, isolate the fractional contribution of the proportional pipes first. In 4 hours, Feed Beta fills 4/8 = 1/2 of the reservoir while Drainage Line Gamma drains 4/16 = 1/4, leaving a net gain of 1/4 of the reservoir from those two alone. Therefore, Feed Alpha must supply the remaining 1 - 1/4 = 3/4 of the capacity. Over 4 hours, Alpha pumps 4 × 45 = 180 litres. Equating 3/4 C = 180 yields C = 240 litres. Option 180 litres is the volume supplied by Alpha alone, 210 litres comes from treating Gamma's drainage time as 12 hours, and 280 litres mistakenly adds Gamma's outflow as an inflow.
Question 9 · CAT Level
Three automated testing rigs—Rig Alpha, Rig Beta, and Rig Gamma—can execute an end-to-end hardware stress-testing suite independently in , , and respectively, when operating for a standard workday baseline of . To accelerate delivery, the engineering lab deploys a continuous round-the-clock schedule divided into three consecutive shifts each day: Rig Alpha operates during the first , Rig Beta operates during the next , and Rig Gamma operates during the final . This three-shift sequence continues uninterrupted for , after which Rig Alpha is decommissioned from the project. Thereafter, Rig Beta and Rig Gamma operate alternately in consecutive shifts (Rig Beta for , followed by Rig Gamma for , and so on) around the clock until the stress-testing suite is completely finished. In how many total days will the testing suite be completed?
Show answer and explanation
Answer: (C) 4 2/3 days
This problem tests understanding of multi-shift scheduling where 1 calendar day spans 24 hours while individual shifts are 8 hours. Rigs Alpha, Beta, and Gamma contribute 1/8, 1/12, and 1/24 of the workload in their respective 8-hour shifts, completing 1/4 of the suite each 24-hour day. In 2 days, exactly half the suite is completed. Rigs Beta and Gamma then alternate in 8-hour shifts, completing 1/8 of the suite every 16 hours. Four full cycles (64 hours = 2 2/3 days) finish the remaining half. The total time taken is 2 + 2 2/3 = 4 2/3 days. Option 4 1/4 days assumes 16-hour calendar days, 4 1/2 days forgets Gamma's contribution in the alternating phase, and 5 days rounds up full calendar days instead of exact continuous hours.
Question 10 · CAT Level
Three automated industrial 3D printing systems—Printer Alpha, Printer Beta, and Printer Gamma—can fabricate a standard benchmark aerodynamic prototype independently in , , and respectively. How much time will it take for all three printers, operating concurrently at their respective constant speeds, to fabricate an advanced titanium structural component that Printer Gamma alone would require to produce?
Show answer and explanation
Answer: (C) 6 hours
By scaling workloads relative to a common unit, this problem simplifies into basic rate division. Assuming a benchmark prototype equals LCM(6, 12, 18) = 36 units gives rates of 6, 3, and 2 units/hour for Alpha, Beta, and Gamma respectively. Since Printer Gamma produces 2 units/hour, the advanced component requiring 33 hours represents 33 × 2 = 66 units. With all three printers working together at 6 + 3 + 2 = 11 units/hour, completing the 66-unit workload takes exactly 66 / 11 = 6 hours. Option 4 1/2 hours comes from miscalculating the combined rate, 5 hours is an erroneous difference approximation (33 - 18) / 3, and 7 1/3 hours reflects the completion time if Printer Gamma were excluded from the combined run (66 / 9 = 7 1/3 hours).
Question 11 · CAT Level
In an automated cloud data pipeline, four specialized compute nodes—Node Alpha, Node Beta, Node Gamma, and Node Delta—process massive genomic sequence batches. Node Gamma takes times the time taken by Node Alpha to process an entire batch alone. Node Alpha takes half the time taken by Node Beta to process the same batch alone. Node Delta takes times the time taken by Node Beta to process the same batch alone. In a scheduled sequential batch run, the nodes execute one after another without overlap: Node Beta, Node Gamma, and Node Delta process , , and of the batch respectively, while Node Alpha processes the remaining fraction. If the entire batch is completed in hours of total execution time, how many hours would Node Alpha, Node Beta, Node Gamma, and Node Delta take individually to process the entire batch alone?
Show answer and explanation
Answer: (B) 10, 20, 30, 80 hours
When workers execute fractional portions of a project sequentially one after another, the total project duration is the sum of their individual operating times: , where is the fraction of total work performed by worker and is the time worker needs to complete the entire job alone. Here, relative to Node Alpha taking hours, Node Beta takes hours, Node Gamma takes hours, and Node Delta takes hours. Node Alpha's work fraction is . Summing the sequential times gives hours. Equating this to hours yields hours, which scales to , and hours respectively.
Question 12 · CAT Level
In an advanced aerospace manufacturing facility, three precision robotic fabrication cells—Cell P, Cell Q, and Cell R—are tasked with producing an orbital satellite chassis. Working together in pairs, Cell P and Cell Q can complete the chassis in days, Cell Q and Cell R in days, and Cell P and Cell R in days. All three cells start fabricating the chassis simultaneously. After days, Cell Q is halted. After more days, Cell Q is restarted and Cell P is removed from the line. Cell Q continues working alongside Cell R for days, after which Cell Q is halted permanently. The remaining chassis fabrication is completed by Cell R operating alone. In how many total days from the start will the satellite chassis fabrication be completed?
Show answer and explanation
Answer: (D) 65 days
Assuming a total workload of units, the pairwise rates are , , and units/day. Adding these gives , so units/day. Subtracting each pairwise equation yields individual rates: , , and units/day. Instead of summing consecutive multi-stage intervals, notice that Cell R works continuously from Day 1 until completion. Cell P works for days (producing units), while Cell Q works for days (producing units). Together, P and Q complete units. The remaining units must be completed by Cell R. At units/day, Cell R requires days. Since Cell R worked every day without a break, the total project duration is days.
Question 13 · CAT Level
A baseline autonomous subsea trenching unit, Unit A, can excavate a pipeline route in days when operating for hours a day. An excavation campaign commences with Unit A working alone. On the second day, a second robotic unit with twice the excavation capacity of Unit A joins the campaign. On the third day, a third robotic unit with three times the excavation capacity of Unit A joins, and this progressive deployment continues such that on the day, an additional unit with times the capacity of Unit A joins the operational fleet. If every active robotic unit operates for exactly hours each day, in how many days will the pipeline route excavation be completed?
Show answer and explanation
Answer: (C) 6 days
Unit A completes the work in machine-hours. On each successive day , a new unit with times the baseline capacity is added to the fleet, making the total effective capacity on day equal to the triangular number . Since the units work hours a day, the daily work output is . The total workload required corresponds to effective unit-days. Summing consecutive triangular numbers: Day 1 (), Day 2 (), Day 3 (), Day 4 (), Day 5 (), and Day 6 (). Their sum is . Thus, the project completes exactly on the day.
Question 14 · CAT Level
Three identical autonomous web indexing crawler agents—Agent Alpha, Agent Beta, and Agent Gamma—working continuously together can complete an enterprise web index in days. The three agents commence indexing simultaneously on Day 1. However, to prevent server overheating, each agent follows a distinct repeating duty-rest cycle:
Agent Alpha operates for consecutive days and enters cooldown on the day (a repeating -day cycle).
Agent Beta operates for consecutive days and enters cooldown on the day (a repeating -day cycle).
Agent Gamma operates for consecutive days and enters cooldown for the next consecutive days (a repeating -day cycle).
Given that all three agents index at the exact same uniform rate when active, in how many days will the enterprise web indexing project be completed?
Show answer and explanation
Answer: (B) 31 days
Assuming each agent produces unit per day when active, the total work required is units. Agent Alpha works out of every days, Agent Beta works out of every days, and Agent Gamma works out of every days. By Day , Alpha completes days, Beta completes days, and Gamma completes days, totaling units, with units remaining. On Day , all three agents work ( units, total ). On Day , Alpha and Gamma work while Beta cools down ( units, total ). On Day , all three agents work ( units, total ), completing the project on Day .
Question 15 · CAT Level
Three cloud data transformation nodes—Node X, Node Y, and Node Z—can individually complete an enterprise data ingestion workload in days, days, and days, respectively. The nodes are initially scheduled to execute the workload one day at a time in continuous rotation: Node X works on the first day, Node Y on the second day, and Node Z on the third day, with this -day cyclic pattern repeating until the end of the day. Starting from the day, Node Y is decommissioned, and the remaining workload is completed by Node X and Node Z working on alternate days, with Node X working on the day. In how many total days was the entire data ingestion workload completed?
Show answer and explanation
Answer: (A) 30 days
With a total workload of units, the daily processing rates are , , and units/day. During Phase 1, the three nodes work sequentially in a -day rotation, delivering units per cycle. Over days ( full cycles), they accomplish units, leaving units remaining. In Phase 2, Node X and Node Z work on alternate days, producing units every days. Completing the remaining units requires two-day blocks, or days. The total elapsed project time is days.
Question 16 · CAT Level
In an automated semiconductor fabrication facility, three advanced lithography systems—System X, System Y, and System Z—are evaluated for wafer etching throughput. System X operates with 20% greater efficiency than System Y, and System Y operates with 25% greater efficiency than System Z. To etch a standard production batch of silicon wafers, System X working alone requires 20 fewer shifts than System Y working alone. In a scheduled production run, System X operates alone for 30 shifts, followed by System Y operating alone for 48 shifts. In how many shifts can System Z working alone etch the remaining wafers of the batch?
Show answer and explanation
Answer: (B) 45 shifts
We first relate the efficiencies of the three systems. Setting the rate of System Z as , System Y's rate is , and System X's rate is . The time taken by X and Y to complete the entire batch alone are inversely proportional to their rates, giving a ratio of . Since the difference between their individual times is 20 shifts, X takes 100 shifts and Y takes 120 shifts, defining the total workload as . System X completes and System Y completes , leaving for System Z. Since System Z processes per shift, it requires shifts to finish the remaining work.
Question 17 · CAT Level
Three automated coolant feed lines—Line A, Line B, and Line C—are connected to a thermal regulation reservoir of a hyperscale data center. Seven times the time taken by Line A alone to fill the reservoir is equal to 11 times the time taken by Lines B and C operating simultaneously. Five times the time taken by Line C alone to fill the reservoir is equal to 13 times the time taken by Lines A and B operating simultaneously. If all three lines operating concurrently can fill the reservoir completely in hours, how many hours would Line B alone take to fill the reservoir?
Show answer and explanation
Answer: (B) 10 hours
Since time is inversely proportional to rate, the condition transforms into , which indicates that Line A provides of the aggregate system throughput. Similarly, gives , showing that Line C provides of the total throughput. Subtracting both shares from 1 gives Line B's share: . Because Line B delivers of the total rate, it takes 3 times the combined duration. Since all three lines together require hours, Line B alone requires hours.
Question 18 · CAT Level
Four specialized autonomous robotic 3D-printers—Alpha, Beta, Gamma, and Delta—are evaluated for manufacturing structural aerospace components. Alpha can complete a component in 2 days. Beta takes double the time taken by Alpha, Gamma takes triple the time taken by Beta, and Delta takes double the time taken by Gamma to complete the identical component. The four printers are partitioned into two disjoint pairs working in parallel. One of the pairs takes exactly twice the time taken by the other pair to complete the component. Which of the following represents the faster pair?
Show answer and explanation
Answer: (A) Alpha and Gamma
From the given multipliers, the times taken are 2, 4, 12, and 24 days. Taking a common workload of 24 units, the daily rates of Alpha, Beta, Gamma, and Delta are 12, 6, 2, and 1 units/day, respectively. Among the three possible disjoint pair partitions, only pairing {Alpha, Gamma} (rate ) with {Beta, Delta} (rate ) yields an exact 2:1 rate ratio, which corresponds to {Beta, Delta} taking exactly twice the time of {Alpha, Gamma}. Therefore, Alpha and Gamma is the faster pair.
Question 19 · CAT Level
Five software engineers—Dev, Esha, Farhan, Gita, and Hari—can independently complete a legacy cloud migration project in 12, 15, 20, 30, and 60 days, respectively. To execute the migration: first, Dev and Farhan work together for 3 days; next, Esha takes over the project and works alone for 4 days; finally, Gita and Hari agree to share the remaining work equally, with Gita completing her assigned portion first, after which Hari completes his assigned portion. In how many total days from the start is the entire cloud migration project completed?
Show answer and explanation
Answer: (C) 22 days
We set the total workload to units, giving daily rates of 5, 4, 3, 2, and 1 units/day for Dev, Esha, Farhan, Gita, and Hari, respectively. In Phase 1, Dev and Farhan do units in 3 days. In Phase 2, Esha completes units in 4 days. The remaining work is units, split equally as 10 units each. Gita finishes her 10 units in days, and Hari finishes his 10 units in days. The total time taken from the start is days.
Question 20 · CAT Level
Six auxiliary cooling units and two primary cooling units are deployed to chill a high-temperature chemical reaction vessel. Each auxiliary unit operates at the thermal dissipation rate of each primary unit. If all 8 units operate simultaneously at their standard uniform rates, in what fraction of the time that it would take for a single primary unit working alone will the vessel be completely chilled?
Show answer and explanation
Answer: (C) 1/6
We express the rate of each auxiliary unit in terms of the primary unit rate : each auxiliary unit contributes . The 6 auxiliary units together contribute . Adding the 2 primary units gives a total system rate of . Since completion time is inversely proportional to rate, all 8 units working together complete the cooling task in of the time required by a single primary unit alone.
Question 21 · CAT Level
A cluster of standard cloud processing nodes, each operating at the same uniform throughput, can complete a massive genomic indexing pipeline in . The nodes initiate the processing on March 1. Starting from March 7, one high-throughput quantum accelerator node is added to the cluster at the beginning of each day. Each quantum accelerator node operates at twice the processing throughput of a standard node. By the end of which date will the genomic indexing pipeline be completed?
Show answer and explanation
Answer: (C) March 14
Total pipeline workload equals 12 × 20 = 240 node-days. In the initial 6 days (March 1 to March 6), the 12 standard nodes complete 12 × 6 = 72 node-days, leaving 240 - 72 = 168 node-days. From March 7 onwards, each day adds one quantum node with double the standard capacity (2 node-days/day). Thus, daily outputs on successive days are 14, 16, 18, ..., forming an arithmetic progression. The sum over n days is n/2 × [2(14) + (n - 1)2] = n(n + 13). Setting n(n + 13) = 168 gives the quadratic n² + 13n - 168 = 0, which factors into (n + 21)(n - 8) = 0, yielding n = 8 days. Counting 8 days starting from March 7 brings completion to the end of March 14.
Question 22 · CAT Level
In an aerospace propulsion testing facility, five interconnected coolant buffer reservoirs—, , , , and —each initially contain of liquid coolant. Coolant is simultaneously pumped between reservoirs through pressurized transfer lines at the following constant flow rates:
From to at
From to at
From to at
From to at
From to at
From to at
Which reservoir will be the first to be completely emptied, and how many minutes after pumping starts will it become empty?
Show answer and explanation
Answer: (B) B, 15 minutes
To solve multi-vessel closed flow systems, determine the net rate (inflow minus outflow) for each vessel. Reservoirs A and C have positive net inflows (+60 L/min and +200 L/min) and will never empty. The remaining three reservoirs have net negative rates: B loses 160 L/min, D loses 60 L/min, and E loses 40 L/min. Dividing the initial 2,400 litres by each net draining rate gives emptying times of 15 minutes for B, 40 minutes for D, and 60 minutes for E. Reservoir B is therefore the first to empty, taking exactly 15 minutes. The distractor 'C, 12 minutes' arises from dividing 2,400 by C's net accumulation rate of 200 L/min.
Question 23 · CAT Level
Three automated data transformation engines—Alpha, Beta, and Gamma—can independently process an enterprise data archive in , , and , respectively. Engine Alpha begins the task alone and works for , after which Engine Beta joins Alpha, and both engines work together for another . At that point, Engine Gamma also joins them, and all three engines work concurrently until the archive processing is completed. What percentage of the total work is performed by Engine Alpha?
Show answer and explanation
Answer: (C) 40%
Assuming a total task capacity of LCM(30, 20, 12) = 60 units, the daily processing rates are 2 units for Alpha, 3 units for Beta, and 5 units for Gamma. During the first 5 days, Alpha works solo to complete 5 × 2 = 10 units. During the next 4 days, Alpha and Beta work together at 2 + 3 = 5 units/day, completing 4 × 5 = 20 units. This leaves 60 - (10 + 20) = 30 units. When Gamma joins, the combined rate becomes 2 + 3 + 5 = 10 units/day, which finishes the remaining 30 units in 30 / 10 = 3 days. Because Alpha worked across all three phases, its total operational duration is 5 + 4 + 3 = 12 days. In those 12 days, Alpha produced 12 × 2 = 24 units, which corresponds to exactly (24 / 60) × 100% = 40% of the entire project.
Question 24 · CAT Level
Four identical autonomous robotic grading units can each complete a site excavation project independently in . The project is initiated by a single robotic unit on the first day. On each subsequent day, exactly one additional unit joins the operation until the fourth day, from which point all four units continue working together until the project is completed. In how many days will the excavation project be completed?
Show answer and explanation
Answer: (B) 8 1/4 days
Let the total excavation work be 27 units, meaning each robotic unit completes 1 unit per day. During the ramp-up phase, 1 unit works on Day 1 (1 unit done), 2 on Day 2 (2 units done), and 3 on Day 3 (3 units done), achieving a cumulative total of 1 + 2 + 3 = 6 units. The remaining workload is 27 - 6 = 21 units. From Day 4 onward, all 4 robotic units work together at a steady rate of 4 units per day. The time needed to complete the remaining 21 units is 21 / 4 = 5 1/4 days. Adding the initial 3 days gives a total completion time of 3 + 5 1/4 = 8 1/4 days. The trap option 8 1/27 days occurs when a solver incorrectly assumes the final 1 unit of work is completed at a rate of 1/27 per day instead of dividing by the combined 4-unit capacity.
Question 25 · CAT Level
Three specialized AI processing clusters—Nexus, Oracle, and Pulse—collaborate to compile and optimize an enterprise dataset. The time required for all three clusters operating concurrently to complete the task is less than the time Nexus would take working alone, less than the time Oracle would take working alone, and half the time Pulse would take working alone. How long does it take for all three clusters working together to complete the task?
Show answer and explanation
Answer: (B) 3 hours
Let t be the hours taken when all three AI clusters work concurrently. Then Nexus takes t + 6 hours alone, Oracle takes t + 15 hours alone, and Pulse takes 2t hours alone. Summing their reciprocal hourly rates gives 1/(t + 6) + 1/(t + 15) + 1/(2t) = 1/t. Subtracting 1/(2t) from both sides simplifies the right-hand side to 1/(2t). Bringing the left-hand side over a common denominator gives (2t + 21)/(t² + 21t + 90) = 1/(2t). Cross-multiplying yields 4t² + 42t = t² + 21t + 90, which simplifies to 3t² + 21t - 90 = 0. Dividing across by 3 gives t² + 7t - 30 = 0, which factors into (t + 10)(t - 3) = 0. Rejecting the negative root leaves t = 3 hours. Substituting t = 3 verifies that individual times are 9, 18, and 6 hours; their combined rate 1/9 + 1/18 + 1/6 = 6/18 = 1/3 perfectly matches the 3-hour joint time.