CAT 2024 Slot 2 Quant Q7

  • Quantitative Aptitude
  • Arithmetic › Time & Work
  • Hard
  • Type in the answer (TITA)
  • CAT_2024_SLOT2_QA_Q07

Question 7

Amal and Vimal together can complete a task in 150 days, while Vimal and Sunil together can complete the same task in 100 days. Amal starts working on the task and works for 75 days, then Vimal takes over and works for 135 days. Finally, Sunil takes over and completes the remaining task in 45 days. If Amal had started the task alone and worked on all days, Vimal had worked on every second day, and Sunil had worked on every third day, then the number of days required to complete the task would have been

Type-in-the-answer (TITA) question: no options are given; enter the value.

Answer this question Opens in practice mode, free, no sign-in.

Show answer and solution

Answer:

139

Solution

  • Let total work =300= 300 units. Then A+V=2A+V = 2 units/day, V+S=3V+S = 3 units/day.

  • Work equation: 75A+135V+45S=30075A + 135V + 45S = 300.

  • Regrouping: 75(A+V)+15V+45(V+S)=30075(A+V) + 15V + 45(V+S) = 300.

  • Substituting known values: 75(2)+15V+45(3)=300  ⟹  285+15V=300  ⟹  V=175(2) + 15V + 45(3) = 300 \implies 285 + 15V = 300 \implies V = 1.

  • Thus, A=1A = 1 and S=2S = 2.

  • In the new scenario, the cycle repeats every 6 days.

  • Units done in 6 days: A(6)+V(3)+S(2)=6(1)+3(1)+2(2)=13A(6) + V(3) + S(2) = 6(1) + 3(1) + 2(2) = 13 units.

  • 300/13=23300 / 13 = 23 full cycles (299 units) in 23×6=13823 \times 6 = 138 days.

  • The remaining 11 unit is completed by A on the 139th day.

  • Answer: 139139.

Detailed explanation

Concept: Time and Work

  • Let the total work be W=300W = 300 units (LCM of 150 and 100).

  • Rates of work per day: Amal (AA), Vimal (VV), Sunil (SS).

  • We are given: A+V=300/150=2A + V = 300/150 = 2 units/day.

  • We are given: V+S=300/100=3V + S = 300/100 = 3 units/day.

  • In the actual scenario, work done is: 75A+135V+45S=30075A + 135V + 45S = 300.

  • We can regroup this to use the given equations: 75A+75V+60V+45S=30075A + 75V + 60V + 45S = 300.

  • 75(A+V)+15V+45(V+S)=30075(A + V) + 15V + 45(V + S) = 300.

  • Substitute A+V=2A+V = 2 and V+S=3V+S = 3: 75(2)+15V+45(3)=30075(2) + 15V + 45(3) = 300.

  • 150+15V+135=300  ⟹  15V+285=300  ⟹  15V=15  ⟹  V=1150 + 15V + 135 = 300 \implies 15V + 285 = 300 \implies 15V = 15 \implies V = 1 unit/day.

  • Therefore, A=2−1=1A = 2 - 1 = 1 unit/day and S=3−1=2S = 3 - 1 = 2 units/day.

  • Now, consider the new work pattern repeating every 6 days (LCM of 1, 2, 3):

DayWorkersUnits Done
1A1
2A, V1 + 1 = 2
3A, S1 + 2 = 3
4A, V1 + 1 = 2
5A1
6A, V, S1 + 1 + 2 = 4
  • Total units per 6-day cycle = 1+2+3+2+1+4=131 + 2 + 3 + 2 + 1 + 4 = 13 units.

  • We need to complete 300 units. Number of full cycles = ⌊300/13⌋=23\lfloor 300 / 13 \rfloor = 23.

  • Work completed in 23 cycles = 23×13=29923 \times 13 = 299 units.

  • Days passed = 23×6=13823 \times 6 = 138 days.

  • Remaining work = 300−299=1300 - 299 = 1 unit.

  • On the 139th day (Day 1 of the new cycle), only Amal works. He does exactly 1 unit/day, completing the task.

  • Total days required = 138+1=139138 + 1 = 139 days.

Practise similar questions

Practice 1 CAT_2024_SLOT2_QA_Q07_SQ01

Dev and Eshan together can complete a project in 100 days, while Eshan and Farhan together can complete the same project in 80 days. Dev starts working on the project and works for 20 days, then Eshan takes over and works for 110 days. Finally, Farhan takes over and completes the remaining project in 25 days. If Dev had started the project alone and worked on all days, Eshan had worked on every second day, and Farhan had worked on every third day, then the number of days required to complete the project would have been

Type-in-the-answer (TITA) question: no options are given; enter the value.

Show answer and solution

Answer:

127

Solution

  • Let total work =400= 400 units. Then D+E=4D + E = 4 and E+F=5E + F = 5.

  • Given: 20D+110E+25F=400  ⟹  20(D+E)+65E+25(E+F)=40020D + 110E + 25F = 400 \implies 20(D + E) + 65E + 25(E + F) = 400.

  • 20(4)+65E+25(5)=400  ⟹  205+65E=400  ⟹  E=320(4) + 65E + 25(5) = 400 \implies 205 + 65E = 400 \implies E = 3.

  • Rates: D=1D = 1, E=3E = 3, F=2F = 2.

  • Repeating 6-day cycle work: 6D+3E+2F=6(1)+3(3)+2(2)=196D + 3E + 2F = 6(1) + 3(3) + 2(2) = 19 units.

  • 400/19=21400 / 19 = 21 complete cycles (399399 units) in 21×6=12621 \times 6 = 126 days.

  • Remaining 11 unit completed on Day 127 by Dev alone (11 unit).

  • Total days required: 127.

Practice 2 CAT_2024_SLOT2_QA_Q07_SQ02

Arun and Barun together can complete an assignment in 60 days, while Barun and Chetan together can complete the same assignment in 45 days. Arun starts working on the assignment and works for 20 days, then Barun takes over and works for 65 days. Finally, Chetan takes over and completes the remaining work in 15 days. If Arun had started the assignment alone and worked on all days, Barun had worked on every second day, and Chetan had worked on every third day, then the number of days required to complete the assignment would have been

Type-in-the-answer (TITA) question: no options are given; enter the value.

Show answer and solution

Answer:

68

Solution

  • Total work =180= 180 units. Rates: A+B=3A + B = 3, B+C=4B + C = 4.

  • 20A+65B+15C=180  ⟹  20(A+B)+30B+15(B+C)=18020A + 65B + 15C = 180 \implies 20(A + B) + 30B + 15(B + C) = 180.

  • 20(3)+30B+15(4)=180  ⟹  120+30B=180  ⟹  B=220(3) + 30B + 15(4) = 180 \implies 120 + 30B = 180 \implies B = 2.

  • Individual rates: A=1A = 1, B=2B = 2, C=2C = 2.

  • Work in a 6-day cycle: 6A+3B+2C=6(1)+3(2)+2(2)=166A + 3B + 2C = 6(1) + 3(2) + 2(2) = 16 units.

  • 180/16=11180 / 16 = 11 cycles (176176 units) in 11×6=6611 \times 6 = 66 days, leaving 44 units.

  • Day 67: Arun does 11 unit (leaves 33). Day 68: Arun + Barun do 33 units.

  • Total days required: 68.

Time & Work questions from other CAT papers

  1. CAT 2025 Slot 1 Quant Q16
    Arun, Varun and Tarun, if working alone, can complete a task in 24, 21, and 15 days, respectively. They…
  2. CAT 2025 Slot 2 Quant Q10
    Ankita is twice as efficient as Bipin, while Bipin is twice as efficient as Chandan. All three of them start…
  3. CAT 2025 Slot 3 Quant Q7
    Teams A, B, and C consist of five, eight, and ten members, respectively, such that every member within a…
  4. CAT 2025 Slot 3 Quant Q13
    The rate of water flow through three pipes A, B and C are in the ratio 4 : 9 : 36. An empty tank can be…
  5. CAT 2023 Slot 1 Quant Q16
    The amount of job that Amal, Sunil and Kamal can individually do in a day, are in harmonic progression.…

Practise this question with timing, notes and your mistake notebook.

Practise in PrepSoc