Alternate Working Days & Cyclic Step Sequencing

Master cyclic work scheduling where agents work on alternating days, compute complete repeating blocks, handle delicate final-day remainders, and analyze sensitivity to the starting worker.

1. The Story & Mental Model: The Repeating Carousel

Imagine two painters, Vikram and Anita, sharing a single specialized paintbrush. Vikram paints on Day 1, Anita paints on Day 2, Vikram returns on Day 3, Anita on Day 4, and so on.

Instead of analyzing each day individually, group the days into Repeating Super-Cycles:

  • In a 2-day cycle, the total work completed is:

    Wcycle=EVikram+EAnitaW_{\text{cycle}} = E_{\text{Vikram}} + E_{\text{Anita}}

  • A 2-day cycle acts as a single predictable engine. If the project requires 5050 units and one 2-day cycle delivers 77 units, you know that 77 complete cycles (1414 days) will deliver 4949 units without any doubt.

The only critical thinking required is on the final residual unit. Who paints on Day 15? Vikram does! Since Vikram paints 44 units/day, he knocks out that final 11 unit in exactly 14\frac{1}{4} of a day. Total time: 14.2514.25 days.


2. The CAT Question Blueprint: The Traps Exam Setters Lay

Exam setters design alternating day problems around three specific pressure points:

  1. Starting Person Sensitivity: Answering whether the task finishes faster if Worker A starts versus Worker B.

  2. Three-Person Rotations: Cyclic order A→B→C→A…A \to B \to C \to A \dots where the remainder spills across multiple partial days.

  3. The Slipping Monkey / Demolition Variant: Worker A builds on Day 1 (+E+E), but Worker B demolishes on Day 2 (−E-E). If the target height is reached at any point on an odd day, the job is DONE—Worker B never gets to demolish!


3. The Single Tactical Weapon: The 4-Step Cyclic Algorithm

Step 1: Compute Total Work via LCM:

W=LCM(TA,TB,TC)W = \text{LCM}(T_A, T_B, T_C)

Determine individual integer daily efficiencies EA,EB,ECE_A, E_B, E_C.

Step 2: Determine Cycle Period and Output:

  • For two workers alternating: Cycle length L=2L = 2 days, Wcycle=EA+EBW_{\text{cycle}} = E_A + E_B.

  • For three workers alternating: Cycle length L=3L = 3 days, Wcycle=EA+EB+ECW_{\text{cycle}} = E_A + E_B + E_C.

Step 3: Find Complete Cycles:

k=⌊WWcycle⌋k = \left\lfloor \frac{W}{W_{\text{cycle}}} \right\rfloor

Work Completed in Full Cycles=k×Wcycle\text{Work Completed in Full Cycles} = k \times W_{\text{cycle}}

Time Elapsed in Full Cycles=k×L days\text{Time Elapsed in Full Cycles} = k \times L \text{ days}

Remainder Work R=W−(k×Wcycle)\text{Remainder Work } R = W - (k \times W_{\text{cycle}})

Step 4: Step-by-Step Remainder Exhaustion:

Step through the remaining work unit by unit in the exact assigned order:

  • If R≤EfirstR \le E_{\text{first}}, then additional time =REfirst= \frac{R}{E_{\text{first}}} days.

  • If R>EfirstR > E_{\text{first}}, first worker works 1 full day; new remainder =R−Efirst= R - E_{\text{first}}, handed to the second worker.


4. The Classic Exam Trap & Speed Shortcut

The Demolition Reversal Trap:

If Builder A builds +4+4 units/day and Demolisher B removes −2-2 units/day, net progress is +2+2 units every 2 days.

To reach a target of 2020 units, do NOT simply say 202×2=20\frac{20}{2} \times 2 = 20 days!

On Day 17, the work reaches 1616 units. On Day 18, Demolisher brings it to 1616. But on Day 17 morning, progress was 16+4=2016 + 4 = 20 units! Once the job completes, it stops.

Rule: Subtract the maximum positive daily rate before calculating complete cycles:

Wtarget−EpositiveW_{\text{target}} - E_{\text{positive}}

Formulas

Cycle Work Output

Wcycle=∑i=1nEiW_{\text{cycle}} = \sum_{i=1}^n E_i

Total work completed in one full cyclic rotation of n workers.
Number of Full Cycles

k=⌊WtotalWcycle⌋k = \left\lfloor \frac{W_{\text{total}}}{W_{\text{cycle}}} \right\rfloor

Integer floor of complete cycles before remainder handling.
Residual Time Division

Tresidual=REactiveT_{\text{residual}} = \frac{R}{E_{\text{active}}}

Fraction of a day needed by the active worker to finish residual units R.
Demolition / Slipping Peak Threshold

Wthreshold=Wtarget−EbuilderW_{\text{threshold}} = W_{\text{target}} - E_{\text{builder}}

Guarantees that builder finishing the task on an upswing is not subjected to subsequent destruction.

Traps and tips

  • Never divide the final remainder by the average cycle rate—always assign it step-by-step to the specific worker on duty.
  • Calculate the difference in completion time if worker B starts instead of worker A—CAT loves testing this delta.
  • For construction/demolition problems, subtract the builder's single-day rate from total work before calculating full cycles.
  • In three-worker rotations, check if the remainder requires more than one worker to finish.

Solved examples

Example 1: Classic Two-Worker Alternation (Start Sensitivity)

Worker A can complete a landscaping project in 12 days, and Worker B can complete it in 16 days. They work on alternate days. (1) How many days will the project take if Worker A starts on Day 1? (2) How many days will it take if Worker B starts on Day 1?

Show solution

Step 1: Set Total Work using LCM.

Total Work W=LCM(12,16)=48 units\text{Total Work } W = \text{LCM}(12, 16) = 48 \text{ units}

  • EA=4812=4 units/dayE_A = \frac{48}{12} = 4 \text{ units/day}

  • EB=4816=3 units/dayE_B = \frac{48}{16} = 3 \text{ units/day}

Step 2: Define a 2-day cycle.

Wcycle=EA+EB=4+3=7 units every 2 daysW_{\text{cycle}} = E_A + E_B = 4 + 3 = 7 \text{ units every 2 days}

Case 1: Worker A starts on Day 1.

Full Cycles k=⌊487⌋=6\text{Full Cycles } k = \left\lfloor \frac{48}{7} \right\rfloor = 6

  • Work in 6 cycles: 6×7=42 units6 \times 7 = 42 \text{ units}

  • Time elapsed: 6×2=12 days6 \times 2 = 12 \text{ days}

  • Remainder: R=48−42=6 unitsR = 48 - 42 = 6 \text{ units}

On Day 13, Worker A works:

  • A produces 4 units   ⟹  \implies Remainder =6−4=2 units= 6 - 4 = 2 \text{ units}. (1 full day added, now 13 days).

On Day 14, Worker B works:

  • B produces 3 units/day, needs 2 units   ⟹  23\implies \frac{2}{3} day.

Total Time (A starts)=12+1+23=1323 days\text{Total Time (A starts)} = 12 + 1 + \frac{2}{3} = 13 \frac{2}{3} \text{ days}

Case 2: Worker B starts on Day 1.

  • Work in 6 cycles: 42 units42 \text{ units} in 12 days12 \text{ days}. Remainder =6 units= 6 \text{ units}.

On Day 13, Worker B works:

  • B produces 3 units   ⟹  \implies Remainder =6−3=3 units= 6 - 3 = 3 \text{ units}. (1 full day added, now 13 days).

On Day 14, Worker A works:

  • A produces 4 units/day, needs 3 units   ⟹  34\implies \frac{3}{4} day.

Total Time (B starts)=12+1+34=1334 days\text{Total Time (B starts)} = 12 + 1 + \frac{3}{4} = 13 \frac{3}{4} \text{ days}

(Notice that when the faster worker A starts first, the project finishes 34−23=112\frac{3}{4} - \frac{2}{3} = \frac{1}{12} day faster).

Takeaway: Starting with the more efficient worker consistently yields a faster or equal completion time.

Example 2: Three-Worker Cyclic Rotation (A -> B -> C)

Three automated sorting systems—Alpha, Beta, and Gamma—can clear a fulfillment warehouse in 15, 20, and 30 hours respectively. To prevent overheating, only one system runs at a time, switching every hour in the sequence: Alpha in Hour 1, Beta in Hour 2, Gamma in Hour 3, Alpha in Hour 4, and so on. Exactly how many hours and minutes will it take to clear the entire warehouse?

Show solution

Step 1: Set Total Work using LCM.

Total Work W=LCM(15,20,30)=60 units\text{Total Work } W = \text{LCM}(15, 20, 30) = 60 \text{ units}

  • Eα=6015=4 units/hourE_\alpha = \frac{60}{15} = 4 \text{ units/hour}

  • Eβ=6020=3 units/hourE_\beta = \frac{60}{20} = 3 \text{ units/hour}

  • Eγ=6030=2 units/hourE_\gamma = \frac{60}{30} = 2 \text{ units/hour}

Step 2: 3-Hour Cycle Output.

Wcycle=4+3+2=9 units every 3 hoursW_{\text{cycle}} = 4 + 3 + 2 = 9 \text{ units every 3 hours}

Step 3: Complete Cycles.

k=⌊609⌋=6k = \left\lfloor \frac{60}{9} \right\rfloor = 6

  • Work in 6 cycles: 6×9=54 units6 \times 9 = 54 \text{ units}

  • Time in 6 cycles: 6×3=18 hours6 \times 3 = 18 \text{ hours}

  • Remainder: R=60−54=6 unitsR = 60 - 54 = 6 \text{ units}

Step 4: Step through remainder.

  • Hour 19 (Alpha runs): Alpha does 44 units   ⟹  \implies Remainder =6−4=2 units= 6 - 4 = 2 \text{ units}. (1 full hour).

  • Hour 20 (Beta runs): Beta does 33 units/hour, but only 22 units remain:

    Time needed=23 hours=40 minutes\text{Time needed} = \frac{2}{3} \text{ hours} = 40 \text{ minutes}

Total Time=18 hours+1 hour+40 minutes=19 hours 40 minutes\text{Total Time} = 18 \text{ hours} + 1 \text{ hour} + 40 \text{ minutes} = 19 \text{ hours } 40 \text{ minutes}

Takeaway: In a 3-agent cyclic process, always exhaust the remainder step-by-step through the respective agents in rotation.

Example 3: Constant Worker with Staggered Assistants

Lead Engineer Dev can complete a module alone in 20 days. Associate Anuj takes 30 days alone, and Associate Charu takes 60 days alone. Dev works every single day, but is assisted by Anuj on every second day (Days 2, 4, 6...) and by Charu on every third day (Days 3, 6, 9...). In how many days will the module be completed?

Show solution

Step 1: Set Total Work using LCM.

Total Work W=LCM(20,30,60)=60 units\text{Total Work } W = \text{LCM}(20, 30, 60) = 60 \text{ units}

  • EDev=6020=3 units/dayE_{\text{Dev}} = \frac{60}{20} = 3 \text{ units/day}

  • EAnuj=6030=2 units/dayE_{\text{Anuj}} = \frac{60}{30} = 2 \text{ units/day}

  • ECharu=6060=1 unit/dayE_{\text{Charu}} = \frac{60}{60} = 1 \text{ unit/day}

Step 2: Determine repeating cycle length.

Anuj helps every 2 days; Charu helps every 3 days. The repeating cycle length is LCM(2,3)=6\text{LCM}(2, 3) = 6 days.

Step 3: Track daily work across a 6-day cycle:

  • Day 1: Dev alone =3= 3 units

  • Day 2: Dev + Anuj =3+2=5= 3 + 2 = 5 units

  • Day 3: Dev + Charu =3+1=4= 3 + 1 = 4 units

  • Day 4: Dev + Anuj =3+2=5= 3 + 2 = 5 units

  • Day 5: Dev alone =3= 3 units

  • Day 6: Dev + Anuj + Charu =3+2+1=6= 3 + 2 + 1 = 6 units

Work per 6-day cycle=3+5+4+5+3+6=26 units\text{Work per 6-day cycle} = 3 + 5 + 4 + 5 + 3 + 6 = 26 \text{ units}

Step 4: Find complete 6-day cycles.

k=⌊6026⌋=2k = \left\lfloor \frac{60}{26} \right\rfloor = 2

  • Work in 2 cycles: 2×26=52 units2 \times 26 = 52 \text{ units}

  • Time elapsed: 2×6=12 days2 \times 6 = 12 \text{ days}

  • Remainder: R=60−52=8 unitsR = 60 - 52 = 8 \text{ units}

Step 5: Step through next days.

  • Day 13 (Day 1 of cycle 3): Dev alone does 33 units   ⟹  R=8−3=5\implies R = 8 - 3 = 5 units.

  • Day 14 (Day 2 of cycle 3): Dev + Anuj do 55 units   ⟹  R=5−5=0\implies R = 5 - 5 = 0 units! Exactly finishes!

Total Time=12+2=14 days\text{Total Time} = 12 + 2 = 14 \text{ days}

Takeaway: When helpers join on different periodicities, find the LCM of their periods to construct the master super-cycle.

Example 4: The Demolition / Slipping Peak Threshold

Mason A can build a boundary wall in 15 days working alone. Due to subsidence, poor weather damages and reduces the wall at a rate that would demolish a completed wall in 20 days. Mason A builds on Day 1, weather damage occurs on Day 2, A builds on Day 3, damage occurs on Day 4, and so forth. In how many days will the wall first reach its full required height?

Show solution

Step 1: Set Total Work using LCM.

Total Work W=LCM(15,20)=60 units\text{Total Work } W = \text{LCM}(15, 20) = 60 \text{ units}

  • Building rate EA=+6015=+4 units/dayE_A = +\frac{60}{15} = +4 \text{ units/day}

  • Damage rate ED=−6020=−3 units/dayE_D = -\frac{60}{20} = -3 \text{ units/day}

Step 2: 2-Day Cycle Net Progress.

Wcycle=+4−3=+1 unit every 2 daysW_{\text{cycle}} = +4 - 3 = +1 \text{ unit every 2 days}

Step 3: The Peak Threshold Rule.

Once the wall reaches 6060 units on any building day, the wall is complete—the subsequent demolition never happens!

Subtract Mason A's single-day building rate to find the cycle threshold:

Wthreshold=60−4=56 unitsW_{\text{threshold}} = 60 - 4 = 56 \text{ units}

To achieve 5656 units of net progress:

Number of cycles=561=56 cycles\text{Number of cycles} = \frac{56}{1} = 56 \text{ cycles}

Time for 56 cycles=56×2=112 days\text{Time for 56 cycles} = 56 \times 2 = 112 \text{ days}

Wall height at end of Day 112=56 units\text{Wall height at end of Day 112} = 56 \text{ units}

Step 4: Final Building Day.

On Day 113, Mason A works:

Progress on Day 113=56+4=60 units\text{Progress on Day 113} = 56 + 4 = 60 \text{ units}

The wall reaches 6060 units on Day 113!

Total Days=113 days\text{Total Days} = 113 \text{ days}

Takeaway: In positive/negative alternating problems, subtract the positive single-day step from total work before computing cycles to capture the peak.

Example 5: Alternating Half-Shift Industrial Production

Assembly Line 1 can complete a batch of electric scooters in 8 hours, and Assembly Line 2 takes 12 hours. The factory runs 1-hour shifts alternating between Line 1 and Line 2. However, whenever a line starts a new shift, there is a 10-minute recalibration delay where no scooters are produced (effectively working 50 minutes per hour). If Line 1 starts first, find the total time taken to finish the batch.

Show solution

Step 1: Set Total Work using LCM.

Total Work W=LCM(8,12)=24 units\text{Total Work } W = \text{LCM}(8, 12) = 24 \text{ units}

  • Line 1 rated speed: 248=3 units/hour=0.05 units/min\frac{24}{8} = 3 \text{ units/hour} = 0.05 \text{ units/min}

  • Line 2 rated speed: 2412=2 units/hour=130 units/min\frac{24}{12} = 2 \text{ units/hour} = \frac{1}{30} \text{ units/min}

Step 2: Effective production per 1-hour shift (50 active minutes).

  • Line 1 shift output: 50 mins×0.05=2.5 units50 \text{ mins} \times 0.05 = 2.5 \text{ units}

  • Line 2 shift output: 50 mins×130=53≈1.667 units50 \text{ mins} \times \frac{1}{30} = \frac{5}{3} \approx 1.667 \text{ units}

Step 3: 2-Hour Cycle Output.

Wcycle=2.5+53=7.5+53=12.53=256 units every 2 hoursW_{\text{cycle}} = 2.5 + \frac{5}{3} = \frac{7.5 + 5}{3} = \frac{12.5}{3} = \frac{25}{6} \text{ units every 2 hours}

Step 4: Complete Cycles.

k=⌊2425/6⌋=⌊14425⌋=5k = \left\lfloor \frac{24}{25/6} \right\rfloor = \left\lfloor \frac{144}{25} \right\rfloor = 5

  • Work in 5 cycles: 5×256=1256=20.833 units5 \times \frac{25}{6} = \frac{125}{6} = 20.833 \text{ units}

  • Time in 5 cycles: 5×2=10 hours5 \times 2 = 10 \text{ hours}

  • Remainder: R=24−20.833=3.167 units=196 unitsR = 24 - 20.833 = 3.167 \text{ units} = \frac{19}{6} \text{ units}

Step 5: Step through remainder.

  • Hour 11 (Line 1 runs):

    Line 1 recalibrates for 10 mins, then works for 50 mins producing 2.52.5 units.

    Remaining Work=196−2.5=3.167−2.5=0.667=23 units\text{Remaining Work} = \frac{19}{6} - 2.5 = 3.167 - 2.5 = 0.667 = \frac{2}{3} \text{ units}

    (Time so far: 11 full hours).

  • Hour 12 (Line 2 runs):

    Line 2 recalibrates for 10 mins.

    Then works at 130\frac{1}{30} units/min:

    Active minutes needed=2/31/30=23×30=20 minutes\text{Active minutes needed} = \frac{2/3}{1/30} = \frac{2}{3} \times 30 = 20 \text{ minutes}

    Total time in Hour 12=10 min (recalibration)+20 min (production)=30 minutes\text{Total time in Hour 12} = 10 \text{ min (recalibration)} + 20 \text{ min (production)} = 30 \text{ minutes}

Total Duration=11 hours 30 minutes\text{Total Duration} = 11 \text{ hours } 30 \text{ minutes}

Takeaway: Account for recalibration or startup friction by deducting it before calculating productive minutes in each shift.

Example 6: Optimal Scheduling of Three Workers

Three consultants—X, Y, and Z—can complete an audit in 12, 18, and 24 days respectively. They must work alone on successive days in a fixed cyclic pattern. Determine which starting consultant (X, Y, or Z) minimizes the total completion time, and calculate the exact difference between the fastest and slowest schedules.

Show solution

Step 1: Set Total Work using LCM.

Total Work W=LCM(12,18,24)=72 units\text{Total Work } W = \text{LCM}(12, 18, 24) = 72 \text{ units}

  • EX=7212=6 units/dayE_X = \frac{72}{12} = 6 \text{ units/day}

  • EY=7218=4 units/dayE_Y = \frac{72}{18} = 4 \text{ units/day}

  • EZ=7224=3 units/dayE_Z = \frac{72}{24} = 3 \text{ units/day}

Step 2: 3-Day Cycle Output.

Wcycle=6+4+3=13 units every 3 daysW_{\text{cycle}} = 6 + 4 + 3 = 13 \text{ units every 3 days}

Full cycles k=⌊7213⌋=5\text{Full cycles } k = \left\lfloor \frac{72}{13} \right\rfloor = 5

  • Work in 5 cycles: 5×13=65 units5 \times 13 = 65 \text{ units}

  • Time in 5 cycles: 5×3=15 days5 \times 3 = 15 \text{ days}

  • Remainder: R=72−65=7 unitsR = 72 - 65 = 7 \text{ units}

Step 3: Evaluate Order 1: X -> Y -> Z.

  • Day 16 (X): does 6 units   ⟹  R=7−6=1\implies R = 7 - 6 = 1 unit.

  • Day 17 (Y): needs 1 unit at 4 units/day   ⟹  14\implies \frac{1}{4} day.

Total Time1=15+1+0.25=16.25 days\text{Total Time}_1 = 15 + 1 + 0.25 = 16.25 \text{ days}

Step 4: Evaluate Order 2: Y -> Z -> X.

  • Day 16 (Y): does 4 units   ⟹  R=7−4=3\implies R = 7 - 4 = 3 units.

  • Day 17 (Z): does 3 units   ⟹  R=3−3=0\implies R = 3 - 3 = 0 units!

Total Time2=15+1+1=17.0 days\text{Total Time}_2 = 15 + 1 + 1 = 17.0 \text{ days}

Step 5: Evaluate Order 3: Z -> X -> Y.

  • Day 16 (Z): does 3 units   ⟹  R=7−3=4\implies R = 7 - 3 = 4 units.

  • Day 17 (X): needs 4 units at 6 units/day   ⟹  46=23\implies \frac{4}{6} = \frac{2}{3} day.

Total Time3=15+1+23=16.67 days\text{Total Time}_3 = 15 + 1 + \frac{2}{3} = 16.67 \text{ days}

Conclusion:

  • Fastest schedule is Order 1 (X starts): 16.2516.25 days.

  • Slowest schedule is Order 2 (Y starts): 17.0017.00 days.

Difference=17.0−16.25=0.75 days=18 hours\text{Difference} = 17.0 - 16.25 = 0.75 \text{ days} = 18 \text{ hours}

Takeaway: Front-loading the highest daily efficiencies always achieves the fastest resolution of remainder work.

Practice questions

Question 1 · CAT Level

Three software engineers A, B, and C can complete a migration project individually in 1515, 2020, and 3030 days respectively. Management evaluates two cyclic 4-day scheduling models:

In Scheme 1, Day 1 is worked by A alone, Day 2 by B alone, Day 3 by C alone, and Day 4 by all three working together, with this 4-day cycle repeating.

In Scheme 2, Day 1 is worked by C alone, Day 2 by B alone, Day 3 by A alone, and Day 4 by all three working together, repeating.

What is the positive difference in total completion time between the two schemes?

  1. A

    1010 hours

  2. B

    1212 hours

  3. C

    1414 hours

  4. D

    1616 hours

Show answer and explanation

Answer: (C) 14 hours

Let total work W=LCM(15,20,30)=60 unitsW = \text{LCM}(15, 20, 30) = 60\text{ units}, so EA=4E_A = 4, EB=3E_B = 3, EC=2 units/dayE_C = 2\text{ units/day}.

In both schemes, a 44-day cycle yields Wcycle=4+3+2+(4+3+2)=18 unitsW_{\text{cycle}} = 4 + 3 + 2 + (4 + 3 + 2) = 18\text{ units}.

In 33 complete cycles (1212 days), both complete 3×18=54 units3 \times 18 = 54\text{ units}, leaving a remainder of 6 units6\text{ units}.

Scheme 1 remainder: Day 13 (A) does 4 units4\text{ units} (rem 22), Day 14 (B) needs 23 day  ⟹  T1=1323 days=13 d 16 h\frac{2}{3}\text{ day} \implies T_1 = 13\frac{2}{3}\text{ days} = 13\text{ d } 16\text{ h}.

Scheme 2 remainder: Day 13 (C) does 2 units2\text{ units} (rem 44), Day 14 (B) does 3 units3\text{ units} (rem 11), Day 15 (A) needs 14 day  ⟹  T2=1414 days=14 d 6 h\frac{1}{4}\text{ day} \implies T_2 = 14\frac{1}{4}\text{ days} = 14\text{ d } 6\text{ h}.

Difference =1414−1323=712 days=14 hours= 14\frac{1}{4} - 13\frac{2}{3} = \frac{7}{12}\text{ days} = 14\text{ hours}.

Question 2 · CAT Level

Two construction automata, A and B, assemble a modular tower while a demolition drone C dismantles it. Working alone continuously, A can build the tower in 1010 hours, B can build it in 1515 hours, and C can completely dismantle it in 2020 hours. They operate in a strict 33-hour repeating rotation: A builds alone during Hour 1, B builds alone during Hour 2, and C dismantles alone during Hour 3. If the assembly is deemed complete the instant the tower first reaches its full height, after how many hours and minutes does the work finish?

  1. A

    2424 hours 2020 minutes

  2. B

    2424 hours 4040 minutes

  3. C

    2525 hours 1515 minutes

  4. D

    2525 hours 4040 minutes

Show answer and explanation

Answer: (B) 24 hours 40 minutes

Let total work W=LCM(10,15,20)=60 unitsW = \text{LCM}(10, 15, 20) = 60\text{ units}, with EA=+6E_A = +6, EB=+4E_B = +4, and EC=−3 units/hourE_C = -3\text{ units/hour}.

Net progress per 33-hour cycle =+6+4−3=+7 units= +6 + 4 - 3 = +7\text{ units}.

Peak threshold rule: After 77 full cycles (21 hours21\text{ hours}), net progress is 7×7=49 units7 \times 7 = 49\text{ units}.

During Cycle 8: Hour 22 (A) brings height to 49+6=55 units49 + 6 = 55\text{ units}; Hour 23 (B) brings height to 55+4=59 units55 + 4 = 59\text{ units} (short of 6060); Hour 24 (C) drops height to 59−3=56 units59 - 3 = 56\text{ units}.

During Cycle 9: Hour 25 (A) needs 60−56=4 units60 - 56 = 4\text{ units} at 6 units/h6\text{ units/h}, taking 46 hour=40 minutes\frac{4}{6}\text{ hour} = 40\text{ minutes}.

Total elapsed time =24 hours 40 minutes= 24\text{ hours } 40\text{ minutes}.

Question 3 · CAT Level

Master artisan P can complete a sculpture alone in 1212 days, apprentice Q alone takes 2424 days, and apprentice R alone takes 3636 days. Artisan P works on the sculpture every single day. Apprentice Q assists P on all odd-numbered days (Days 1, 3, 5...), while apprentice R assists P on every third day starting from Day 2 (Days 2, 5, 8, 11...). In how many days will the sculpture be completed?

  1. A

    8138\frac{1}{3} days

  2. B

    8128\frac{1}{2} days

  3. C

    8238\frac{2}{3} days

  4. D

    99 days

Show answer and explanation

Answer: (C) 82/3 days

Let total work W=LCM(12,24,36)=72 unitsW = \text{LCM}(12, 24, 36) = 72\text{ units}, so EP=6E_P = 6, EQ=3E_Q = 3, ER=2 units/dayE_R = 2\text{ units/day}.

The assistance pattern repeats every LCM(2,3)=6 days\text{LCM}(2, 3) = 6\text{ days}.

Daily output across the 66-day cycle: Day 1 (P+QP+Q): 99; Day 2 (P+RP+R): 88; Day 3 (P+QP+Q): 99; Day 4 (PP): 66; Day 5 (P+Q+RP+Q+R): 1111; Day 6 (PP): 66.

Work in one 66-day cycle =9+8+9+6+11+6=49 units= 9 + 8 + 9 + 6 + 11 + 6 = 49\text{ units}.

Remaining work after Day 6 =72−49=23 units= 72 - 49 = 23\text{ units}.

Day 7 (P+QP+Q) does 9 units9\text{ units} (rem 1414); Day 8 (P+RP+R) does 8 units8\text{ units} (rem 66); Day 9 (P+QP+Q) takes 69=23 day\frac{6}{9} = \frac{2}{3}\text{ day}.

Total time =8+23=823 days= 8 + \frac{2}{3} = 8\frac{2}{3}\text{ days}.

Question 4 · CAT Level

Two database replication processes, D1 and D2, can sync an entire dataset alone in 1616 hours and 2424 hours of continuous runtime respectively. The system runs them in alternating 22-hour shifts (D1 for 2 hours, then D2 for 2 hours, repeating). However, whenever a process begins its shift, the first 1515 minutes are consumed by cache warm-up with 0%0\% throughput, after which it operates at full rated speed for the remaining 1 hour 45 minutes1\text{ hour } 45\text{ minutes}. If D1 begins the first shift, what is the total elapsed time to sync the dataset?

  1. A

    2121 hours 2020 minutes

  2. B

    2121 hours 3030 minutes

  3. C

    2121 hours 4040 minutes

  4. D

    2222 hours 1515 minutes

Show answer and explanation

Answer: (C) 21 hours 40 minutes

Let total work W=LCM(16,24)=48 unitsW = \text{LCM}(16, 24) = 48\text{ units}. Rated speeds: E1=3 units/hE_1 = 3\text{ units/h}, E2=2 units/hE_2 = 2\text{ units/h}.

Each 22-hour shift has 1.75 hours1.75\text{ hours} of active work: D1 produces 1.75×3=5.25 units1.75 \times 3 = 5.25\text{ units}; D2 produces 1.75×2=3.50 units1.75 \times 2 = 3.50\text{ units}.

One 44-hour cycle yields 5.25+3.50=8.75 units5.25 + 3.50 = 8.75\text{ units}. In 55 cycles (20 hours20\text{ hours}), work done =5×8.75=43.75 units= 5 \times 8.75 = 43.75\text{ units}.

Remaining work =48−43.75=4.25 units= 48 - 43.75 = 4.25\text{ units}.

D1 starts shift 11: 15 minutes15\text{ minutes} warm-up produces 0 units0\text{ units}; producing 4.25 units4.25\text{ units} at 3 units/h3\text{ units/h} takes 4.253 h=85 minutes=1 h 25 m\frac{4.25}{3}\text{ h} = 85\text{ minutes} = 1\text{ h } 25\text{ m}.

Total elapsed time =20 hours+15 min+1 hour 25 min=21 hours 40 minutes= 20\text{ hours} + 15\text{ min} + 1\text{ hour } 25\text{ min} = 21\text{ hours } 40\text{ minutes}.

Question 5 · CAT Level

Three engineers A, B, and C can complete a codebase refactoring alone in 1212, 1515, and 2020 days respectively. To ensure continuous peer review, they work in pairs on successive days: Pair (A and B) on Day 1, Pair (B and C) on Day 2, Pair (C and A) on Day 3, and this 3-day cyclic pattern repeats until completion. What is the total time (in days) required to complete the refactoring?

  1. A

    7147\frac{1}{4} days

  2. B

    7377\frac{3}{7} days

  3. C

    7497\frac{4}{9} days

  4. D

    7587\frac{5}{8} days

Show answer and explanation

Answer: (B) 73/7 days

Let total work W=LCM(12,15,20)=60 unitsW = \text{LCM}(12, 15, 20) = 60\text{ units}. Individual efficiencies: EA=5E_A = 5, EB=4E_B = 4, EC=3 units/dayE_C = 3\text{ units/day}.

Daily pair rates: Day 1 (A+BA+B) =5+4=9= 5 + 4 = 9; Day 2 (B+CB+C) =4+3=7= 4 + 3 = 7; Day 3 (C+AC+A) =3+5=8 units/day= 3 + 5 = 8\text{ units/day}.

Work per 33-day cycle =9+7+8=24 units= 9 + 7 + 8 = 24\text{ units}.

In 22 full cycles (6 days6\text{ days}), work completed =2×24=48 units= 2 \times 24 = 48\text{ units}, leaving 60−48=12 units60 - 48 = 12\text{ units}.

Day 7 (Pair A+BA+B) completes 9 units9\text{ units}, leaving 12−9=3 units12 - 9 = 3\text{ units}.

Day 8 (Pair B+CB+C) works at 7 units/day7\text{ units/day}, taking 37 day\frac{3}{7}\text{ day} to finish the remaining 3 units3\text{ units}.

Total time =6+1+37=737 days= 6 + 1 + \frac{3}{7} = 7\frac{3}{7}\text{ days}.