Free CAT library

Practice Exercise 2 (46 Questions)

46 advanced CAT-level combinational graph questions covering complex multi-chart syntheses, ratio-index transformations, and constrained systems.

Practice Exercise 2 — Advanced & Past CAT Sets

46 high-difficulty questions covering authentic CAT-level combinational challenges.

Practice questions

Question 1 · Moderate

Directions for Questions 1 to 4

Answer the questions on the basis of the information and graphical telemetry data presented below.

An experimental autonomous linear-induction test pod (AeroPulse Pod-X) is undergoing kinematic calibration along a rectilinear magnetic levitation track. At t=0t = 0 seconds, the vehicle accelerates from rest in the forward testing vector.

The continuous velocity–time telemetry profile is recorded for the initial 15-second burn phase, over which the pod covers an aggregate distance of 345 metres. The accompanying discrete bar chart records the telemetry displacement (distance covered in metres) across three subsequent consecutive 5-second observation windows from t=15t = 15 to t=30t = 30 seconds.

The velocity profile varies linearly (piecewise linear motion with constant acceleration) across each 5-second interval: 0–50–5, 5–105–10, 10–1510–15, 15–2015–20, 20–2520–25, and 25–3025–30 seconds.

AeroPulse Sled Velocity Telemetry Profile and Displacement Windows

The calibrated kinematic telemetry data across the observation windows is summarized below:

Time Interval (seconds)Initial Velocity (m/s)Final Velocity (m/s)Displacement / Area (m)
0 to 503075
5 to 103030150
10 to 153018120
15 to 20181275
20 to 251228100
25 to 3028685

What is the speed (in m/s) of the test vehicle at t=15t = 15 seconds?

  1. A

    14 m/s

  2. B

    18 m/s

  3. C

    16 m/s

  4. D

    20 m/s

Show answer and explanation

Answer: (B) 18 m/s

Question 1 Solution:

In a velocity–time graph, the distance traversed equals the area bounded under the curve.

  1. Distance in the first 10 seconds (0≤t≤100 \le t \le 10 s):

    • For 0≤t≤50 \le t \le 5 s (triangle): 12×5×30=75 m\frac{1}{2} \times 5 \times 30 = 75\text{ m}.

    • For 5≤t≤105 \le t \le 10 s (rectangle at constant 30 m/s30\text{ m/s}): 5×30=150 m5 \times 30 = 150\text{ m}.

    • Total distance covered in first 10 seconds =75+150=225 m= 75 + 150 = 225\text{ m}.

  2. Distance in the interval 10≤t≤1510 \le t \le 15 s:

    Distance10−15=Total distance (15 s)−Distance (10 s)=345−225=120 m\text{Distance}_{10-15} = \text{Total distance (15 s)} - \text{Distance (10 s)} = 345 - 225 = 120\text{ m}

  3. Velocity at t=15t = 15 s (V15V_{15}):

    The velocity profile is linear between t=10t = 10 and t=15t = 15 s, forming a trapezoid of width 5 s5\text{ s}:

    30+V152×5=120  ⟹  30+V15=120×25=48  ⟹  V15=48−30=18 m/s\frac{30 + V_{15}}{2} \times 5 = 120 \implies 30 + V_{15} = \frac{120 \times 2}{5} = 48 \implies V_{15} = 48 - 30 = 18\text{ m/s}

Hence, the speed of the test vehicle at t=15 secondst = 15\text{ seconds} is 18 m/s.

Question 2 · Moderate

Directions for Questions 1 to 4

Answer the questions on the basis of the information and graphical telemetry data presented below.

An experimental autonomous linear-induction test pod (AeroPulse Pod-X) is undergoing kinematic calibration along a rectilinear magnetic levitation track. At t=0t = 0 seconds, the vehicle accelerates from rest in the forward testing vector.

The continuous velocity–time telemetry profile is recorded for the initial 15-second burn phase, over which the pod covers an aggregate distance of 345 metres. The accompanying discrete bar chart records the telemetry displacement (distance covered in metres) across three subsequent consecutive 5-second observation windows from t=15t = 15 to t=30t = 30 seconds.

The velocity profile varies linearly (piecewise linear motion with constant acceleration) across each 5-second interval: 0–50–5, 5–105–10, 10–1510–15, 15–2015–20, 20–2520–25, and 25–3025–30 seconds.

AeroPulse Sled Velocity Telemetry Profile and Displacement Windows

The calibrated kinematic telemetry data across the observation windows is summarized below:

Time Interval (seconds)Initial Velocity (m/s)Final Velocity (m/s)Displacement / Area (m)
0 to 503075
5 to 103030150
10 to 153018120
15 to 20181275
20 to 251228100
25 to 3028685

What is the speed (in m/s) of the test vehicle at t=30t = 30 seconds?

  1. A

    4 m/s

  2. B

    6 m/s

  3. C

    8 m/s

  4. D

    10 m/s

Show answer and explanation

Answer: (B) 6 m/s

Question 2 Solution:

We determine velocities sequentially across the observation windows using the bar chart displacements:

  1. Interval 15≤t≤2015 \le t \le 20 s (Displacement = 75 m):

    V15+V202×5=75  ⟹  18+V202=15  ⟹  18+V20=30  ⟹  V20=12 m/s\frac{V_{15} + V_{20}}{2} \times 5 = 75 \implies \frac{18 + V_{20}}{2} = 15 \implies 18 + V_{20} = 30 \implies V_{20} = 12\text{ m/s}

  2. Interval 20≤t≤2520 \le t \le 25 s (Displacement = 100 m):

    V20+V252×5=100  ⟹  12+V25=40  ⟹  V25=28 m/s\frac{V_{20} + V_{25}}{2} \times 5 = 100 \implies 12 + V_{25} = 40 \implies V_{25} = 28\text{ m/s}

  3. Interval 25≤t≤3025 \le t \le 30 s (Displacement = 85 m):

    V25+V302×5=85  ⟹  28+V30=34  ⟹  V30=34−28=6 m/s\frac{V_{25} + V_{30}}{2} \times 5 = 85 \implies 28 + V_{30} = 34 \implies V_{30} = 34 - 28 = 6\text{ m/s}

Hence, the speed of the vehicle at t=30 secondst = 30\text{ seconds} is 6 m/s.

Question 3 · Moderate

Directions for Questions 1 to 4

Answer the questions on the basis of the information and graphical telemetry data presented below.

An experimental autonomous linear-induction test pod (AeroPulse Pod-X) is undergoing kinematic calibration along a rectilinear magnetic levitation track. At t=0t = 0 seconds, the vehicle accelerates from rest in the forward testing vector.

The continuous velocity–time telemetry profile is recorded for the initial 15-second burn phase, over which the pod covers an aggregate distance of 345 metres. The accompanying discrete bar chart records the telemetry displacement (distance covered in metres) across three subsequent consecutive 5-second observation windows from t=15t = 15 to t=30t = 30 seconds.

The velocity profile varies linearly (piecewise linear motion with constant acceleration) across each 5-second interval: 0–50–5, 5–105–10, 10–1510–15, 15–2015–20, 20–2520–25, and 25–3025–30 seconds.

AeroPulse Sled Velocity Telemetry Profile and Displacement Windows

The calibrated kinematic telemetry data across the observation windows is summarized below:

Time Interval (seconds)Initial Velocity (m/s)Final Velocity (m/s)Displacement / Area (m)
0 to 503075
5 to 103030150
10 to 153018120
15 to 20181275
20 to 251228100
25 to 3028685

What was the average speed (in m/s) of the test vehicle between t=8t = 8 seconds and t=24t = 24 seconds?

  1. A

    17.8 m/s

  2. B

    20.5 m/s

  3. C

    22.4 m/s

  4. D

    24.2 m/s

Show answer and explanation

Answer: (B) 20.5 m/s

Question 3 Solution:

Average speed is defined as the total distance covered divided by total time elapsed:

Average Speed=Total Distance from t=8 to t=2424−8=16 seconds\text{Average Speed} = \frac{\text{Total Distance from } t=8 \text{ to } t=24}{24 - 8 = 16\text{ seconds}}

Let us sum the displacements across the sub-intervals:

  1. From t=8t = 8 to t=10t = 10 s:

    Velocity is constant at 30 m/s30\text{ m/s}:

    d1=30×(10−8)=60 md_1 = 30 \times (10 - 8) = 60\text{ m}

  2. From t=10t = 10 to t=15t = 15 s:

    d2=120 md_2 = 120\text{ m}

  3. From t=15t = 15 to t=20t = 20 s:

    d3=75 md_3 = 75\text{ m}

  4. From t=20t = 20 to t=24t = 24 s:

    In the interval 20≤t≤2520 \le t \le 25, velocity increases linearly from V20=12 m/sV_{20} = 12\text{ m/s} to V25=28 m/sV_{25} = 28\text{ m/s}.

    Acceleration a=28−125=3.2 m/s2a = \frac{28 - 12}{5} = 3.2\text{ m/s}^2.

    Velocity at t=24 st = 24\text{ s}:

    V24=12+3.2×(24−20)=12+12.8=24.8 m/sV_{24} = 12 + 3.2 \times (24 - 20) = 12 + 12.8 = 24.8\text{ m/s}

    Displacement over this 4-second sub-window:

    d4=V20+V242×4=12+24.82×4=18.4×4=73.6 md_4 = \frac{V_{20} + V_{24}}{2} \times 4 = \frac{12 + 24.8}{2} \times 4 = 18.4 \times 4 = 73.6\text{ m}

  5. Total Distance and Average Speed:

    Total Distance=60+120+75+73.6=328.6 m\text{Total Distance} = 60 + 120 + 75 + 73.6 = 328.6\text{ m}

    Average Speed=328.616=20.5375 m/s≈20.5 m/s\text{Average Speed} = \frac{328.6}{16} = 20.5375\text{ m/s} \approx 20.5\text{ m/s}

Hence, the average speed is approximately 20.5 m/s.

Question 4 · Moderate

Directions for Questions 1 to 4

Answer the questions on the basis of the information and graphical telemetry data presented below.

An experimental autonomous linear-induction test pod (AeroPulse Pod-X) is undergoing kinematic calibration along a rectilinear magnetic levitation track. At t=0t = 0 seconds, the vehicle accelerates from rest in the forward testing vector.

The continuous velocity–time telemetry profile is recorded for the initial 15-second burn phase, over which the pod covers an aggregate distance of 345 metres. The accompanying discrete bar chart records the telemetry displacement (distance covered in metres) across three subsequent consecutive 5-second observation windows from t=15t = 15 to t=30t = 30 seconds.

The velocity profile varies linearly (piecewise linear motion with constant acceleration) across each 5-second interval: 0–50–5, 5–105–10, 10–1510–15, 15–2015–20, 20–2520–25, and 25–3025–30 seconds.

AeroPulse Sled Velocity Telemetry Profile and Displacement Windows

The calibrated kinematic telemetry data across the observation windows is summarized below:

Time Interval (seconds)Initial Velocity (m/s)Final Velocity (m/s)Displacement / Area (m)
0 to 503075
5 to 103030150
10 to 153018120
15 to 20181275
20 to 251228100
25 to 3028685

What is the absolute difference between the maximum and minimum speed of the test vehicle in the interval between t=15t = 15 seconds and t=30t = 30 seconds?

  1. A

    16 m/s

  2. B

    22 m/s

  3. C

    18 m/s

  4. D

    24 m/s

Show answer and explanation

Answer: (B) 22 m/s

Question 4 Solution:

Because motion in each 5-second interval is piecewise linear with constant acceleration, local extrema can only occur at the boundary points:

  • At t=15 st = 15\text{ s}: V15=18 m/sV_{15} = 18\text{ m/s}

  • At t=20 st = 20\text{ s}: V20=12 m/sV_{20} = 12\text{ m/s}

  • At t=25 st = 25\text{ s}: V25=28 m/sV_{25} = 28\text{ m/s}

  • At t=30 st = 30\text{ s}: V30=6 m/sV_{30} = 6\text{ m/s}

Examining these values:

  • Maximum Speed =28 m/s= 28\text{ m/s} (at t=25 st = 25\text{ s})

  • Minimum Speed =6 m/s= 6\text{ m/s} (at t=30 st = 30\text{ s})

Absolute difference =28−6=22 m/s= 28 - 6 = \mathbf{22\text{ m/s}}.

Question 5 · Moderate

Directions for Questions 5 to 8

Answer the questions on the basis of the multi-chart dataset presented below.

AeroDynamic Subsystems Corporation (ADSC) manufactures six specialized aerospace hardware modules — designated as A, B, C, D, E, and F. In FY 2021, the company incurred a total production expenditure of Rs. 360 crore across all six modules combined.

The pie chart below depicts the angular distribution (degrees) of total production cost across the six modules:

Breakdown of Production Expenditure across Aerospace Modules A to F

Each module is manufactured in two distinct variants: Type P (Commercial Grade) and Type Q (Defense-Hardened Grade). The ratio of units manufactured and the profit margin percentages realized upon sale are tabulated below:

Product ModuleRatio of Units ProducedProfit Percentage
Type PType QType PType Q
A5420%30%
B5225%20%
C5615%25%
D1120%10%
E5425%15%
F5220%15%

Furthermore, across all six modules, the cost of production per unit of Type P and Type Q are in the fixed ratio of 4 : 5.

For which of the following products is the profit made on items of Type Q NOT more than the profit made on items of Type P?

  1. A

    A, B, C, D

  2. B

    B, D, E, F

  3. C

    A, C, E, F

  4. D

    B, C, D, E

Show answer and explanation

Answer: (B) B, D, E, F

Question 5 Solution:

Let the cost per unit of Type P and Type Q be 4k4k and 5k5k respectively.

If the units produced are in the ratio uP:uQu_P : u_Q, the total production cost splits in the ratio:

Cost Ratio (CP:CQ)=(uP×4):(uQ×5)\text{Cost Ratio } (C_P : C_Q) = (u_P \times 4) : (u_Q \times 5)

With total budget Rs. 360 Cr\text{Rs. } 360\text{ Cr}, 1∘=Rs. 1 Cr1^\circ = \text{Rs. } 1\text{ Cr}:

  • Module A (36∘=36 Cr36^\circ = 36\text{ Cr}): Ratio (5×4):(4×5)=20:20=1:1(5\times 4):(4\times 5) = 20:20 = 1:1. Cost P=18 Cr,Q=18 CrP = 18\text{ Cr}, Q = 18\text{ Cr}.

    Profit P=18×20%=3.60 CrP = 18 \times 20\% = 3.60\text{ Cr}; Profit Q=18×30%=5.40 CrQ = 18 \times 30\% = 5.40\text{ Cr}. Here Profit Q>Q > Profit PP.

  • Module B (90∘=90 Cr90^\circ = 90\text{ Cr}): Ratio (5×4):(2×5)=20:10=2:1(5\times 4):(2\times 5) = 20:10 = 2:1. Cost P=60 Cr,Q=30 CrP = 60\text{ Cr}, Q = 30\text{ Cr}.

    Profit P=60×25%=15.00 CrP = 60 \times 25\% = 15.00\text{ Cr}; Profit Q=30×20%=6.00 CrQ = 30 \times 20\% = 6.00\text{ Cr}. Profit Q<Q < Profit PP.

  • Module C (72∘=72 Cr72^\circ = 72\text{ Cr}): Ratio (5×4):(6×5)=20:30=2:3(5\times 4):(6\times 5) = 20:30 = 2:3. Cost P=28.8 Cr,Q=43.2 CrP = 28.8\text{ Cr}, Q = 43.2\text{ Cr}.

    Profit P=28.8×15%=4.32 CrP = 28.8 \times 15\% = 4.32\text{ Cr}; Profit Q=43.2×25%=10.80 CrQ = 43.2 \times 25\% = 10.80\text{ Cr}. Profit Q>Q > Profit PP.

  • Module D (54∘=54 Cr54^\circ = 54\text{ Cr}): Ratio (1×4):(1×5)=4:5(1\times 4):(1\times 5) = 4:5. Cost P=24 Cr,Q=30 CrP = 24\text{ Cr}, Q = 30\text{ Cr}.

    Profit P=24×20%=4.80 CrP = 24 \times 20\% = 4.80\text{ Cr}; Profit Q=30×10%=3.00 CrQ = 30 \times 10\% = 3.00\text{ Cr}. Profit Q<Q < Profit PP.

  • Module E (36∘=36 Cr36^\circ = 36\text{ Cr}): Ratio (5×4):(4×5)=1:1(5\times 4):(4\times 5) = 1:1. Cost P=18 Cr,Q=18 CrP = 18\text{ Cr}, Q = 18\text{ Cr}.

    Profit P=18×25%=4.50 CrP = 18 \times 25\% = 4.50\text{ Cr}; Profit Q=18×15%=2.70 CrQ = 18 \times 15\% = 2.70\text{ Cr}. Profit Q<Q < Profit PP.

  • Module F (72∘=72 Cr72^\circ = 72\text{ Cr}): Ratio (5×4):(2×5)=2:1(5\times 4):(2\times 5) = 2:1. Cost P=48 Cr,Q=24 CrP = 48\text{ Cr}, Q = 24\text{ Cr}.

    Profit P=48×20%=9.60 CrP = 48 \times 20\% = 9.60\text{ Cr}; Profit Q=24×15%=3.60 CrQ = 24 \times 15\% = 3.60\text{ Cr}. Profit Q<Q < Profit PP.

Profit on Type Q is NOT more than Type P for modules B, D, E, and F.

Question 6 · Moderate

Directions for Questions 5 to 8

Answer the questions on the basis of the multi-chart dataset presented below.

AeroDynamic Subsystems Corporation (ADSC) manufactures six specialized aerospace hardware modules — designated as A, B, C, D, E, and F. In FY 2021, the company incurred a total production expenditure of Rs. 360 crore across all six modules combined.

The pie chart below depicts the angular distribution (degrees) of total production cost across the six modules:

Breakdown of Production Expenditure across Aerospace Modules A to F

Each module is manufactured in two distinct variants: Type P (Commercial Grade) and Type Q (Defense-Hardened Grade). The ratio of units manufactured and the profit margin percentages realized upon sale are tabulated below:

Product ModuleRatio of Units ProducedProfit Percentage
Type PType QType PType Q
A5420%30%
B5225%20%
C5615%25%
D1120%10%
E5425%15%
F5220%15%

Furthermore, across all six modules, the cost of production per unit of Type P and Type Q are in the fixed ratio of 4 : 5.

For which product is the ratio of profit on Type Q to profit on Type P the lowest?

  1. A

    Module B

  2. B

    Module D

  3. C

    Module F

  4. D

    Module E

Show answer and explanation

Answer: (C) Module F

Question 6 Solution:

We compare the ratio Profit QProfit P\frac{\text{Profit } Q}{\text{Profit } P} across modules:

  • A: 5.403.60=1.50\frac{5.40}{3.60} = 1.50

  • B: 6.0015.00=0.400\frac{6.00}{15.00} = 0.400

  • C: 10.804.32=2.50\frac{10.80}{4.32} = 2.50

  • D: 3.004.80=0.625\frac{3.00}{4.80} = 0.625

  • E: 2.704.50=0.600\frac{2.70}{4.50} = 0.600

  • F: 3.609.60=0.375\frac{3.60}{9.60} = 0.375

The lowest ratio is 0.3750.375, attained by Module F.

Question 7 · Moderate

Directions for Questions 5 to 8

Answer the questions on the basis of the multi-chart dataset presented below.

AeroDynamic Subsystems Corporation (ADSC) manufactures six specialized aerospace hardware modules — designated as A, B, C, D, E, and F. In FY 2021, the company incurred a total production expenditure of Rs. 360 crore across all six modules combined.

The pie chart below depicts the angular distribution (degrees) of total production cost across the six modules:

Breakdown of Production Expenditure across Aerospace Modules A to F

Each module is manufactured in two distinct variants: Type P (Commercial Grade) and Type Q (Defense-Hardened Grade). The ratio of units manufactured and the profit margin percentages realized upon sale are tabulated below:

Product ModuleRatio of Units ProducedProfit Percentage
Type PType QType PType Q
A5420%30%
B5225%20%
C5615%25%
D1120%10%
E5425%15%
F5220%15%

Furthermore, across all six modules, the cost of production per unit of Type P and Type Q are in the fixed ratio of 4 : 5.

For how many products is the overall profit percentage strictly more than 20%?

  1. A

    2

  2. B

    3

  3. C

    4

  4. D

    5

Show answer and explanation

Answer: (B) 3

Question 7 Solution:

Overall profit percentage =Total Profit (P + Q)Total Cost of Module×100%= \frac{\text{Total Profit (P + Q)}}{\text{Total Cost of Module}} \times 100\%.

  • A: Total Profit =3.60+5.40=9.00 Cr= 3.60 + 5.40 = 9.00\text{ Cr}; Cost =36 Cr  ⟹  936=25.0%>20%= 36\text{ Cr} \implies \frac{9}{36} = 25.0\% > 20\%.

  • B: Total Profit =15.00+6.00=21.00 Cr= 15.00 + 6.00 = 21.00\text{ Cr}; Cost =90 Cr  ⟹  2190=23.33%>20%= 90\text{ Cr} \implies \frac{21}{90} = 23.33\% > 20\%.

  • C: Total Profit =4.32+10.80=15.12 Cr= 4.32 + 10.80 = 15.12\text{ Cr}; Cost =72 Cr  ⟹  15.1272=21.0%>20%= 72\text{ Cr} \implies \frac{15.12}{72} = 21.0\% > 20\%.

  • D: Total Profit =4.80+3.00=7.80 Cr= 4.80 + 3.00 = 7.80\text{ Cr}; Cost =54 Cr  ⟹  7.854=14.44%<20%= 54\text{ Cr} \implies \frac{7.8}{54} = 14.44\% < 20\%.

  • E: Total Profit =4.50+2.70=7.20 Cr= 4.50 + 2.70 = 7.20\text{ Cr}; Cost =36 Cr  ⟹  7.236=20.0%= 36\text{ Cr} \implies \frac{7.2}{36} = 20.0\% (exactly equal, not strictly more).

  • F: Total Profit =9.60+3.60=13.20 Cr= 9.60 + 3.60 = 13.20\text{ Cr}; Cost =72 Cr  ⟹  13.272=18.33%<20%= 72\text{ Cr} \implies \frac{13.2}{72} = 18.33\% < 20\%.

Exactly 3 modules (A, B, and C) have an overall profit percentage strictly exceeding 20%.

Question 8 · Moderate

Directions for Questions 5 to 8

Answer the questions on the basis of the multi-chart dataset presented below.

AeroDynamic Subsystems Corporation (ADSC) manufactures six specialized aerospace hardware modules — designated as A, B, C, D, E, and F. In FY 2021, the company incurred a total production expenditure of Rs. 360 crore across all six modules combined.

The pie chart below depicts the angular distribution (degrees) of total production cost across the six modules:

Breakdown of Production Expenditure across Aerospace Modules A to F

Each module is manufactured in two distinct variants: Type P (Commercial Grade) and Type Q (Defense-Hardened Grade). The ratio of units manufactured and the profit margin percentages realized upon sale are tabulated below:

Product ModuleRatio of Units ProducedProfit Percentage
Type PType QType PType Q
A5420%30%
B5225%20%
C5615%25%
D1120%10%
E5425%15%
F5220%15%

Furthermore, across all six modules, the cost of production per unit of Type P and Type Q are in the fixed ratio of 4 : 5.

What was the total cost of production (in Rs. crore) of Type P items of A, D, and F taken together?

  1. A

    Rs. 75 crore

  2. B

    Rs. 90 crore

  3. C

    Rs. 84 crore

  4. D

    Rs. 96 crore

Show answer and explanation

Answer: (B) Rs. 90 crore

Question 8 Solution:

From our cost breakdown:

  • Cost of Type P for Module A =Rs. 18 crore= \text{Rs. } 18\text{ crore}

  • Cost of Type P for Module D =Rs. 24 crore= \text{Rs. } 24\text{ crore}

  • Cost of Type P for Module F =Rs. 48 crore= \text{Rs. } 48\text{ crore}

Combined Cost=18+24+48=Rs. 90 crore\text{Combined Cost} = 18 + 24 + 48 = \mathbf{\text{Rs. } 90\text{ crore}}

Question 9 · Moderate

Directions for Questions 9 to 12

Answer the questions on the basis of the multi-chart dataset presented below.

The four donut charts below depict the gender distribution of faculty members across four major research universities — A, B, C, and D — as of December 31, 2020.

Faculty Gender Distribution across Universities A, B, C, D

The number of female professors in universities A, B, C, and D are denoted as P, Q, R, and S respectively. The accompanying bar graph provides algebraic constraint relations among P, Q, R, and S:

Faculty Demographic Constraint Relations

Constraint RelationAggregate Value
$P + Q + R$5,400
$Q + R + S$7,200
$Q - R$600
$P + S$4,200

What was the absolute difference between the number of male professors in University A and the number of female professors in University D?

  1. A

    6,800

  2. B

    7,200

  3. C

    7,800

  4. D

    8,400

Show answer and explanation

Answer: (C) 7,800

Question 9 Solution:

  1. Solving the linear system for P, Q, R, S:

    Summing the three equations:

    (P+Q+R)+(Q+R+S)+(P+S)=5400+7200+4200=16800(P + Q + R) + (Q + R + S) + (P + S) = 5400 + 7200 + 4200 = 16800

    2(P+Q+R+S)=16800  ⟹  P+Q+R+S=84002(P + Q + R + S) = 16800 \implies P + Q + R + S = 8400

    • S=(P+Q+R+S)−(P+Q+R)=8400−5400=3000S = (P + Q + R + S) - (P + Q + R) = 8400 - 5400 = 3000

    • P=(P+Q+R+S)−(Q+R+S)=8400−7200=1200P = (P + Q + R + S) - (Q + R + S) = 8400 - 7200 = 1200

    • Q+R=8400−(P+S)=8400−4200=4200Q + R = 8400 - (P + S) = 8400 - 4200 = 4200

    • Given Q−R=600  ⟹  2Q=4800  ⟹  Q=2400Q - R = 600 \implies 2Q = 4800 \implies Q = 2400, and R=1800R = 1800.

  2. Total Faculty & Male Professors in University A:

    In University A, females represent 10%10\% of the faculty:

    Total FacultyA=P0.10=12000.10=12000\text{Total Faculty}_A = \frac{P}{0.10} = \frac{1200}{0.10} = 12000

    Male ProfessorsA=12000−1200=10800\text{Male Professors}_A = 12000 - 1200 = 10800

  3. Female Professors in University D:

    S=3000S = 3000

  4. Absolute Difference:

    Difference=10800−3000=7800\text{Difference} = 10800 - 3000 = \mathbf{7800}

Question 10 · Moderate

Directions for Questions 9 to 12

Answer the questions on the basis of the multi-chart dataset presented below.

The four donut charts below depict the gender distribution of faculty members across four major research universities — A, B, C, and D — as of December 31, 2020.

Faculty Gender Distribution across Universities A, B, C, D

The number of female professors in universities A, B, C, and D are denoted as P, Q, R, and S respectively. The accompanying bar graph provides algebraic constraint relations among P, Q, R, and S:

Faculty Demographic Constraint Relations

Constraint RelationAggregate Value
$P + Q + R$5,400
$Q + R + S$7,200
$Q - R$600
$P + S$4,200

What was the ratio of the total number of professors in University D to the number of male professors in University C?

  1. A

    24 : 25

  2. B

    4 : 3

  3. C

    5 : 4

  4. D

    25 : 24

Show answer and explanation

Answer: (D) 25 : 24

Question 10 Solution:

  1. Total Professors in University D:

    In University D, female professors constitute 40%40\% of total faculty:

    TotalD=S0.40=30000.40=7500\text{Total}_D = \frac{S}{0.40} = \frac{3000}{0.40} = 7500

  2. Male Professors in University C:

    In University C, females (R=1800R = 1800) constitute 20%20\% of total faculty:

    TotalC=18000.20=9000\text{Total}_C = \frac{1800}{0.20} = 9000

    MaleC=9000−1800=7200\text{Male}_C = 9000 - 1800 = 7200

  3. Ratio:

    Ratio=7500:7200=7500300:7200300=25:24\text{Ratio} = 7500 : 7200 = \frac{7500}{300} : \frac{7200}{300} = \mathbf{25 : 24}

Question 11 · Moderate

Directions for Questions 9 to 12

Answer the questions on the basis of the multi-chart dataset presented below.

The four donut charts below depict the gender distribution of faculty members across four major research universities — A, B, C, and D — as of December 31, 2020.

Faculty Gender Distribution across Universities A, B, C, D

The number of female professors in universities A, B, C, and D are denoted as P, Q, R, and S respectively. The accompanying bar graph provides algebraic constraint relations among P, Q, R, and S:

Faculty Demographic Constraint Relations

Constraint RelationAggregate Value
$P + Q + R$5,400
$Q + R + S$7,200
$Q - R$600
$P + S$4,200

Additional Information for Questions 11 and 12: In 2021, an expansion initiative transfers a total of 2,500 new professors to universities A, B, C, and D in the ratio 4 : 3 : 2 : 1.

In which of the mentioned universities was the number of male professors as a percentage of the total number of professors in that university the maximum?

  1. A

    University B

  2. B

    University C

  3. C

    University A

  4. D

    Cannot be determined

Show answer and explanation

Answer: (C) University A

Question 11 Solution:

The 2,500 new professors are distributed in the ratio 4:3:2:14:3:2:1 (sum of parts =10= 10):

  • Transferred to A: 2500×0.4=10002500 \times 0.4 = 1000

  • Transferred to B: 2500×0.3=7502500 \times 0.3 = 750

  • Transferred to C: 2500×0.2=5002500 \times 0.2 = 500

  • Transferred to D: 2500×0.1=2502500 \times 0.1 = 250

New total faculty:

  • A: 12000+1000=1300012000 + 1000 = 13000

  • B: 8000+750=87508000 + 750 = 8750

  • C: 9000+500=95009000 + 500 = 9500

  • D: 7500+250=77507500 + 250 = 7750

We test the worst-case scenario for University A (all 1,000 new professors are female, so male count remains 10,800):

Min Male % in A=1080013000×100%≈83.08%\text{Min Male \% in A} = \frac{10800}{13000} \times 100\% \approx 83.08\%

Even in the best-case scenario for the other universities (all new recruits are male):

  • Max in B: 5600+7508750=63508750≈72.57%\frac{5600 + 750}{8750} = \frac{6350}{8750} \approx 72.57\%

  • Max in C: 7200+5009500=77009500≈81.05%\frac{7200 + 500}{9500} = \frac{7700}{9500} \approx 81.05\%

  • Max in D: 4500+2507750=47507750≈61.29%\frac{4500 + 250}{7750} = \frac{4750}{7750} \approx 61.29\%

Since the minimum possible percentage in University A (83.08%83.08\%) strictly exceeds the maximum possible percentage in any other university, University A unambiguously has the highest male percentage.

Question 12 · Moderate

Directions for Questions 9 to 12

Answer the questions on the basis of the multi-chart dataset presented below.

The four donut charts below depict the gender distribution of faculty members across four major research universities — A, B, C, and D — as of December 31, 2020.

Faculty Gender Distribution across Universities A, B, C, D

The number of female professors in universities A, B, C, and D are denoted as P, Q, R, and S respectively. The accompanying bar graph provides algebraic constraint relations among P, Q, R, and S:

Faculty Demographic Constraint Relations

Constraint RelationAggregate Value
$P + Q + R$5,400
$Q + R + S$7,200
$Q - R$600
$P + S$4,200

If the total number of female professors who joined the four universities put together was equal to the number of female professors in University A after the joining, then the total number of male professors who joined the four universities put together in 2021 cannot be less than:

  1. A

    200

  2. B

    300

  3. C

    400

  4. D

    500

Show answer and explanation

Answer: (B) 300

Question 12 Solution:

  1. Let FtransF_{\text{trans}} and MtransM_{\text{trans}} be the total number of female and male professors transferred across all four universities.

    Ftrans+Mtrans=2500F_{\text{trans}} + M_{\text{trans}} = 2500

  2. We are given:

    Ftrans=Females in A after joining=1200+FA,transF_{\text{trans}} = \text{Females in A after joining} = 1200 + F_{A,\text{trans}}

  3. Since only 1,000 professors joined University A in total, the number of females joining A cannot exceed 1,000:

    FA,trans≤1000  ⟹  Ftrans=1200+FA,trans≤1200+1000=2200F_{A,\text{trans}} \le 1000 \implies F_{\text{trans}} = 1200 + F_{A,\text{trans}} \le 1200 + 1000 = 2200

  4. Therefore, the number of male professors who joined cannot be less than:

    Mtrans=2500−Ftrans≥2500−2200=300M_{\text{trans}} = 2500 - F_{\text{trans}} \ge 2500 - 2200 = \mathbf{300}

Question 13 · Moderate

Directions for Questions 13 to 16

Answer the questions on the basis of the retail inventory and sales telemetry data presented below.

Gopaljee Beverage Enterprises distributes single-serve packaged fruit drinks in two major product lines: Trooti and Frooti (300 ml packs). The bar chart below shows the number of packs procured by the store at the start of each month from March to August:

Monthly Stock Procurement by Brand (March to August)

In each month, the store sells a specific fraction of its total available stock (the sum of leftover stock from the preceding month, if any, and new inventory procured at the beginning of the month). At the end of February, the store held zero unsold stock of either brand.

The fraction of available stock sold each month is tabulated below:

MonthFraction of Trooti SoldFraction of Frooti Sold
March0.50—
April0.60—
May0.700.70
June0.800.90
July0.900.70
August0.800.50

(Note: Throughout all monthly stock calculations, round any fractional pack to the nearest integer, rounding half values a.5a.5 upwards to a+1a+1.)

In which month, during the given period, was the total number of packets sold of Trooti and Frooti put together the highest?

  1. A

    July

  2. B

    June

  3. C

    August

  4. D

    Cannot be determined

Show answer and explanation

Answer: (B) June

Question 13 Solution:

We track monthly inventory and sales across both brands:

  1. Trooti (FruitPulse):

    • March: Stock =140= 140; Sold =140×0.50=70= 140 \times 0.50 = 70; Leftover =70= 70.

    • April: Stock =70+160=230= 70 + 160 = 230; Sold =230×0.60=138= 230 \times 0.60 = 138; Leftover =92= 92.

    • May: Stock =92+180=272= 92 + 180 = 272; Sold =272×0.70=190.4≈190= 272 \times 0.70 = 190.4 \approx 190; Leftover =82= 82.

    • June: Stock =82+220=302= 82 + 220 = 302; Sold =302×0.80=241.6≈242= 302 \times 0.80 = 241.6 \approx 242; Leftover =60= 60.

    • July: Stock =60+240=300= 60 + 240 = 300; Sold =300×0.90=270= 300 \times 0.90 = 270; Leftover =30= 30.

    • August: Stock =30+260=290= 30 + 260 = 290; Sold =290×0.80=232= 290 \times 0.80 = 232; Leftover =58= 58.

  2. Frooti (CitrusFizz): (Introduced in May)

    • May: Stock =160= 160; Sold =160×0.70=112= 160 \times 0.70 = 112; Leftover =48= 48.

    • June: Stock =48+180=228= 48 + 180 = 228; Sold =228×0.90=205.2≈205= 228 \times 0.90 = 205.2 \approx 205; Leftover =23= 23.

    • July: Stock =23+210=233= 23 + 210 = 233; Sold =233×0.70=163.1≈163= 233 \times 0.70 = 163.1 \approx 163; Leftover =70= 70.

    • August: Stock =70+240=310= 70 + 240 = 310; Sold =310×0.50=155= 310 \times 0.50 = 155; Leftover =155= 155.

  3. Combined Monthly Sales:

    • March: 70+0=7070 + 0 = 70

    • April: 138+0=138138 + 0 = 138

    • May: 190+112=302190 + 112 = 302

    • June: 242+205=447242 + 205 = \mathbf{447}

    • July: 270+163=433270 + 163 = 433

    • August: 232+155=387232 + 155 = 387

Combined sales reached the peak of 447 packs in June.

Question 14 · Moderate

Directions for Questions 13 to 16

Answer the questions on the basis of the retail inventory and sales telemetry data presented below.

Gopaljee Beverage Enterprises distributes single-serve packaged fruit drinks in two major product lines: Trooti and Frooti (300 ml packs). The bar chart below shows the number of packs procured by the store at the start of each month from March to August:

Monthly Stock Procurement by Brand (March to August)

In each month, the store sells a specific fraction of its total available stock (the sum of leftover stock from the preceding month, if any, and new inventory procured at the beginning of the month). At the end of February, the store held zero unsold stock of either brand.

The fraction of available stock sold each month is tabulated below:

MonthFraction of Trooti SoldFraction of Frooti Sold
March0.50—
April0.60—
May0.700.70
June0.800.90
July0.900.70
August0.800.50

(Note: Throughout all monthly stock calculations, round any fractional pack to the nearest integer, rounding half values a.5a.5 upwards to a+1a+1.)

In which month, during the given period, was the total stock of the two brands put together the highest?

  1. A

    June

  2. B

    August

  3. C

    July

  4. D

    Cannot be determined

Show answer and explanation

Answer: (B) August

Question 14 Solution:

Total stock in any month is the sum of opening stock across both brands:

  • March: 140+0=140140 + 0 = 140

  • April: 230+0=230230 + 0 = 230

  • May: 272+160=432272 + 160 = 432

  • June: 302+228=530302 + 228 = 530

  • July: 300+233=533300 + 233 = 533

  • August: 290+310=600290 + 310 = \mathbf{600}

Total combined stock was highest in August (600 packs600\text{ packs}).

Question 15 · Moderate

Directions for Questions 13 to 16

Answer the questions on the basis of the retail inventory and sales telemetry data presented below.

Gopaljee Beverage Enterprises distributes single-serve packaged fruit drinks in two major product lines: Trooti and Frooti (300 ml packs). The bar chart below shows the number of packs procured by the store at the start of each month from March to August:

Monthly Stock Procurement by Brand (March to August)

In each month, the store sells a specific fraction of its total available stock (the sum of leftover stock from the preceding month, if any, and new inventory procured at the beginning of the month). At the end of February, the store held zero unsold stock of either brand.

The fraction of available stock sold each month is tabulated below:

MonthFraction of Trooti SoldFraction of Frooti Sold
March0.50—
April0.60—
May0.700.70
June0.800.90
July0.900.70
August0.800.50

(Note: Throughout all monthly stock calculations, round any fractional pack to the nearest integer, rounding half values a.5a.5 upwards to a+1a+1.)

In which month, during the given period, was the number of packets sold of Trooti the highest?

  1. A

    June

  2. B

    August

  3. C

    July

  4. D

    Cannot be determined

Show answer and explanation

Answer: (C) July

Question 15 Solution:

Examining Trooti sales alone across all months:

  • March: 70

  • April: 138

  • May: 190

  • June: 242

  • July: 270

  • August: 232

Trooti sales peaked in July with 270 packs sold.

Question 16 · CAT Level

Directions for Questions 13 to 16

Answer the questions on the basis of the retail inventory and sales telemetry data presented below.

Gopaljee Beverage Enterprises distributes single-serve packaged fruit drinks in two major product lines: Trooti and Frooti (300 ml packs). The bar chart below shows the number of packs procured by the store at the start of each month from March to August:

Monthly Stock Procurement by Brand (March to August)

In each month, the store sells a specific fraction of its total available stock (the sum of leftover stock from the preceding month, if any, and new inventory procured at the beginning of the month). At the end of February, the store held zero unsold stock of either brand.

The fraction of available stock sold each month is tabulated below:

MonthFraction of Trooti SoldFraction of Frooti Sold
March0.50—
April0.60—
May0.700.70
June0.800.90
July0.900.70
August0.800.50

(Note: Throughout all monthly stock calculations, round any fractional pack to the nearest integer, rounding half values a.5a.5 upwards to a+1a+1.)

In which month, during the given period, was the value of the ratio of the number of packets sold of Trooti in a month to the number of the packets bought at the beginning of the same month the maximum?

  1. A

    May

  2. B

    June

  3. C

    August

  4. D

    July

Show answer and explanation

Answer: (D) July

Question 16 Solution:

We calculate the ratio Trooti SoldTrooti Bought\frac{\text{Trooti Sold}}{\text{Trooti Bought}} for each month:

  • March: 70140=0.5000\frac{70}{140} = 0.5000

  • April: 138160=0.8625\frac{138}{160} = 0.8625

  • May: 190180≈1.0556\frac{190}{180} \approx 1.0556

  • June: 242220=1.1000\frac{242}{220} = 1.1000

  • July: 270240=1.1250\frac{270}{240} = \mathbf{1.1250}

  • August: 232260≈0.8923\frac{232}{260} \approx 0.8923

The maximum ratio is 1.12501.1250, recorded in July.

Question 17 · CAT Level

Directions for Questions 17 to 20

Answer the questions on the basis of the macroeconomic and distillery supply dataset presented below. [CAT 1990]

The first chart displays the total monetary value (in Rs. crore) of liquor supplied by five state jurisdictions in 1996 alongside the respective excise duty levied per litre:

Regional Liquor Supply Total Value and Excise Duty

The second chart depicts the volume of liquor supplied by the five licensed private distilleries in Tamil Nadu — designated as A, B, C, D, and E — across 1996, 1997, and 1998 (in lakh litres):

Tamil Nadu Distilleries Annual Supply Volume

Distillery1996 Supply (Lakh L)1997 Supply (Lakh L)1998 Supply (Lakh L)
A6.0010.0012.00
B3.006.5011.40
C2.006.0014.00
D1.003.005.00
E2.503.204.00

What is the lowest percentage difference in the excise duty rates for any two states in the dataset?

  1. A

    12%

  2. B

    15%

  3. C

    20%

  4. D

    Cannot be determined

Show answer and explanation

Answer: (D) Cannot be determined

Question 17 Solution:

A percentage difference between two quantities XX and YY requires an unambiguous reference base: ∣X−Y∣X\frac{|X - Y|}{X} or ∣X−Y∣Y\frac{|X - Y|}{Y}. Without specifying which state forms the reference base, or because the dataset is restricted to five select states rather than an exhaustive universe, the metric Cannot be determined.

Question 18 · CAT Level

Directions for Questions 17 to 20

Answer the questions on the basis of the macroeconomic and distillery supply dataset presented below. [CAT 1990]

The first chart displays the total monetary value (in Rs. crore) of liquor supplied by five state jurisdictions in 1996 alongside the respective excise duty levied per litre:

Regional Liquor Supply Total Value and Excise Duty

The second chart depicts the volume of liquor supplied by the five licensed private distilleries in Tamil Nadu — designated as A, B, C, D, and E — across 1996, 1997, and 1998 (in lakh litres):

Tamil Nadu Distilleries Annual Supply Volume

Distillery1996 Supply (Lakh L)1997 Supply (Lakh L)1998 Supply (Lakh L)
A6.0010.0012.00
B3.006.5011.40
C2.006.0014.00
D1.003.005.00
E2.503.204.00

Which of the five states manufactured liquor at the lowest cost?

  1. A

    Tamil Nadu

  2. B

    Delhi

  3. C

    The state which has the lowest value for (wholesale price - Excise duty) per litre

  4. D

    Cannot be determined

Show answer and explanation

Answer: (D) Cannot be determined

Question 18 Solution:

The charts provide the aggregate market value of liquor supplied and the statutory excise duty rate per litre. However, neither the total physical volume manufactured by states other than Tamil Nadu nor the per-unit production cost is provided. Therefore, the state with the lowest manufacturing cost Cannot be determined.

Question 19 · CAT Level

Directions for Questions 17 to 20

Answer the questions on the basis of the macroeconomic and distillery supply dataset presented below. [CAT 1990]

The first chart displays the total monetary value (in Rs. crore) of liquor supplied by five state jurisdictions in 1996 alongside the respective excise duty levied per litre:

Regional Liquor Supply Total Value and Excise Duty

The second chart depicts the volume of liquor supplied by the five licensed private distilleries in Tamil Nadu — designated as A, B, C, D, and E — across 1996, 1997, and 1998 (in lakh litres):

Tamil Nadu Distilleries Annual Supply Volume

Distillery1996 Supply (Lakh L)1997 Supply (Lakh L)1998 Supply (Lakh L)
A6.0010.0012.00
B3.006.5011.40
C2.006.0014.00
D1.003.005.00
E2.503.204.00

If Excise duty is levied before the goods leave the factory (on the value of the liquor), then which of the following choices shows distilleries in ascending order of the excise duty paid by them for the year 1996? (Assume the total liquor in Tamil Nadu is supplied only by these 5 distilleries).

  1. A

    ECABD

  2. B

    ADEBC

  3. C

    DCEBA

  4. D

    Cannot be determined

Show answer and explanation

Answer: (C) DCEBA

Question 19 Solution:

Within Tamil Nadu, a uniform state excise duty rate is levied per unit/value of liquor. Hence, the excise duty paid by each distillery is directly proportional to its supply volume.

In 1996, the supply volumes (in lakh litres) were:

  • Distillery D: 1.001.00

  • Distillery C: 2.002.00

  • Distillery E: 2.502.50

  • Distillery B: 3.003.00

  • Distillery A: 6.006.00

Arranging in strictly ascending order: 1.00<2.00<2.50<3.00<6.001.00 < 2.00 < 2.50 < 3.00 < 6.00, which corresponds to D, C, E, B, A (DCEBA).

Question 20 · CAT Level

Directions for Questions 17 to 20

Answer the questions on the basis of the macroeconomic and distillery supply dataset presented below. [CAT 1990]

The first chart displays the total monetary value (in Rs. crore) of liquor supplied by five state jurisdictions in 1996 alongside the respective excise duty levied per litre:

Regional Liquor Supply Total Value and Excise Duty

The second chart depicts the volume of liquor supplied by the five licensed private distilleries in Tamil Nadu — designated as A, B, C, D, and E — across 1996, 1997, and 1998 (in lakh litres):

Tamil Nadu Distilleries Annual Supply Volume

Distillery1996 Supply (Lakh L)1997 Supply (Lakh L)1998 Supply (Lakh L)
A6.0010.0012.00
B3.006.5011.40
C2.006.0014.00
D1.003.005.00
E2.503.204.00

If the Tamil Nadu distillery with the least average simple annual growth in amount of liquor supplied in the given period had shown the same rate of growth as the one which grew fastest, what would that company’s supply have been in 1998, in lakh litres?

  1. A

    14.0 lakh litres

  2. B

    17.5 lakh litres

  3. C

    15.2 lakh litres

  4. D

    21.0 lakh litres

Show answer and explanation

Answer: (B) 17.5 lakh litres

Question 20 Solution:

  1. Average Simple Annual Growth Rate (1996 to 1998, t=2t = 2 years):

    g=V1998−V1996V1996×12×100%g = \frac{V_{1998} - V_{1996}}{V_{1996}} \times \frac{1}{2} \times 100\%

    • A: 12.00−6.006.00×12=50.0%\frac{12.00 - 6.00}{6.00} \times \frac{1}{2} = 50.0\%

    • B: 11.40−3.003.00×12=140.0%\frac{11.40 - 3.00}{3.00} \times \frac{1}{2} = 140.0\%

    • C: 14.00−2.002.00×12=300.0%\frac{14.00 - 2.00}{2.00} \times \frac{1}{2} = \mathbf{300.0\%} (Fastest growing!)

    • D: 5.00−1.001.00×12=200.0%\frac{5.00 - 1.00}{1.00} \times \frac{1}{2} = 200.0\%

    • E: 4.00−2.502.50×12=30.0%\frac{4.00 - 2.50}{2.50} \times \frac{1}{2} = \mathbf{30.0\%} (Slowest growing!)

  2. Simulating E with C's growth rate:

    With g=300%g = 300\% per year for 2 years, total simple growth over the 2-year period is 2×300%=600%2 \times 300\% = 600\% (a factor of 1+6=71 + 6 = 7):

    V1998,new=2.50×(1+6.00)=2.50×7=17.5 lakh litresV_{1998,\text{new}} = 2.50 \times (1 + 6.00) = 2.50 \times 7 = \mathbf{17.5\text{ lakh litres}}

Question 21 · CAT Level

Directions for Questions 21 to 25

Answer the questions based on the software project engineering schedule and manpower telemetry presented below. [CAT 1996]

Apex Enterprise Software Co. executes enterprise cloud migrations following a standardized 15-month schedule partitioned into five sequential stages:

Month SpanEngineering StageBilling Rate (Rs. '000 per man-month)
Months 1–2System Specification50
Months 3–4Architecture & Design25
Months 5–8Core Coding15
Months 9–10System Testing20
Months 11–15Cloud Maintenance12

The scheduled headcount of software engineers assigned across the 15 months is summarized below:

Month123456789101112131415
Headcount244446655244222

Due to an overrun in 'Architecture & Design', the design stage required 3 months (Months 3, 4, and 5). The number of engineers working on design in the fifth month was 6. Calculate the percentage change in the cost incurred in the fifth month (Due to a new framework, 'Core Coding' was completed in Months 6 to 8 only).

  1. A

    125%

  2. B

    150%

  3. C

    175%

  4. D

    200%

Show answer and explanation

Answer: (B) 150%

Question 21 Solution:

  1. Original Scheduled Cost for Month 5:

    Originally, Month 5 was allocated to 'Core Coding' with 4 engineers at Rs. 15,000 per man-month:

    Costorig=4×15000=Rs. 60,000\text{Cost}_{\text{orig}} = 4 \times 15000 = \text{Rs. } 60,000

  2. Revised Actual Cost for Month 5:

    Under the overrun, Month 5 was devoted to 'Architecture & Design' with 6 engineers at Rs. 25,000 per man-month:

    Costnew=6×25000=Rs. 1,50,000\text{Cost}_{\text{new}} = 6 \times 25000 = \text{Rs. } 1,50,000

  3. Percentage Change:

    Percentage Change=150000−6000060000×100%=9000060000×100%=150%\text{Percentage Change} = \frac{150000 - 60000}{60000} \times 100\% = \frac{90000}{60000} \times 100\% = \mathbf{150\%}

Question 22 · CAT Level

Directions for Questions 21 to 25

Answer the questions based on the software project engineering schedule and manpower telemetry presented below. [CAT 1996]

Apex Enterprise Software Co. executes enterprise cloud migrations following a standardized 15-month schedule partitioned into five sequential stages:

Month SpanEngineering StageBilling Rate (Rs. '000 per man-month)
Months 1–2System Specification50
Months 3–4Architecture & Design25
Months 5–8Core Coding15
Months 9–10System Testing20
Months 11–15Cloud Maintenance12

The scheduled headcount of software engineers assigned across the 15 months is summarized below:

Month123456789101112131415
Headcount244446655244222

With reference to the revised schedule above, what is the cost incurred in the new 'Core Coding' stage? (Under the new technique, 5 engineers work in Month 6, 6 in Month 7, and 6 in Month 8).

  1. A

    Rs. 2,40,000

  2. B

    Rs. 2,55,000

  3. C

    Rs. 2,70,000

  4. D

    Rs. 2,85,000

Show answer and explanation

Answer: (B) Rs. 2,55,000

Question 22 Solution:

Under the compressed coding schedule:

  • Month 6: 5 engineers

  • Month 7: 6 engineers

  • Month 8: 6 engineers

  • Total man-months =5+6+6=17 man-months= 5 + 6 + 6 = 17\text{ man-months}.

At the coding billing rate of Rs. 15,000 per man-month:

Cost=17×15000=Rs. 2,55,000\text{Cost} = 17 \times 15000 = \mathbf{\text{Rs. } 2,55,000}

Question 23 · CAT Level

Directions for Questions 21 to 25

Answer the questions based on the software project engineering schedule and manpower telemetry presented below. [CAT 1996]

Apex Enterprise Software Co. executes enterprise cloud migrations following a standardized 15-month schedule partitioned into five sequential stages:

Month SpanEngineering StageBilling Rate (Rs. '000 per man-month)
Months 1–2System Specification50
Months 3–4Architecture & Design25
Months 5–8Core Coding15
Months 9–10System Testing20
Months 11–15Cloud Maintenance12

The scheduled headcount of software engineers assigned across the 15 months is summarized below:

Month123456789101112131415
Headcount244446655244222

What is the net difference in overall project cost between the original and the new rescheduled techniques?

  1. A

    Rs. 60,000

  2. B

    Rs. 90,000

  3. C

    Rs. 75,000

  4. D

    Rs. 1,05,000

Show answer and explanation

Answer: (B) Rs. 90,000

Question 23 Solution:

Months 1–4 and 9–15 have identical staffing and billing rates in both schemes. Cost differences occur strictly in Months 5, 6, and 8:

  1. Original Cost (Months 5, 6, 8):

    • Month 5: 4×15000=60,0004 \times 15000 = 60,000

    • Month 6: 6×15000=90,0006 \times 15000 = 90,000

    • Month 8: 5×15000=75,0005 \times 15000 = 75,000

    • Total =60000+90000+75000=Rs. 2,25,000= 60000 + 90000 + 75000 = \text{Rs. } 2,25,000

  2. New Rescheduled Cost (Months 5, 6, 8):

    • Month 5: 6×25000=1,50,0006 \times 25000 = 1,50,000

    • Month 6: 5×15000=75,0005 \times 15000 = 75,000

    • Month 8: 6×15000=90,0006 \times 15000 = 90,000

    • Total =150000+75000+90000=Rs. 3,15,000= 150000 + 75000 + 90000 = \text{Rs. } 3,15,000

  3. Difference:

    Difference=315000−225000=Rs. 90,000\text{Difference} = 315000 - 225000 = \mathbf{\text{Rs. } 90,000}

Question 24 · CAT Level

Directions for Questions 21 to 25

Answer the questions based on the software project engineering schedule and manpower telemetry presented below. [CAT 1996]

Apex Enterprise Software Co. executes enterprise cloud migrations following a standardized 15-month schedule partitioned into five sequential stages:

Month SpanEngineering StageBilling Rate (Rs. '000 per man-month)
Months 1–2System Specification50
Months 3–4Architecture & Design25
Months 5–8Core Coding15
Months 9–10System Testing20
Months 11–15Cloud Maintenance12

The scheduled headcount of software engineers assigned across the 15 months is summarized below:

Month123456789101112131415
Headcount244446655244222

Under the new rescheduled technique, which stage of software development is the most expensive for Apex Enterprise Software Co.?

  1. A

    System Specification

  2. B

    Architecture & Design

  3. C

    Core Coding

  4. D

    System Testing

Show answer and explanation

Answer: (B) Architecture & Design

Question 24 Solution:

We calculate the total expenditure incurred across each stage under the new technique:

  1. System Specification (Months 1–2): (2+4)×50000=6×50000=Rs. 3,00,000(2 + 4) \times 50000 = 6 \times 50000 = \text{Rs. } 3,00,000

  2. Architecture & Design (Months 3–5): (4+4+6)×25000=14×25000=Rs. 3,50,000(4 + 4 + 6) \times 25000 = 14 \times 25000 = \mathbf{\text{Rs. } 3,50,000}

  3. Core Coding (Months 6–8): (5+6+6)×15000=17×15000=Rs. 2,55,000(5 + 6 + 6) \times 15000 = 17 \times 15000 = \text{Rs. } 2,55,000

  4. System Testing (Months 9–10): (5+2)×20000=7×20000=Rs. 1,40,000(5 + 2) \times 20000 = 7 \times 20000 = \text{Rs. } 1,40,000

  5. Cloud Maintenance (Months 11–15): (4+4+2+2+2)×12000=14×12000=Rs. 1,68,000(4 + 4 + 2 + 2 + 2) \times 12000 = 14 \times 12000 = \text{Rs. } 1,68,000

The most expensive stage is Architecture & Design at Rs. 3,50,000.

Question 25 · CAT Level

Directions for Questions 21 to 25

Answer the questions based on the software project engineering schedule and manpower telemetry presented below. [CAT 1996]

Apex Enterprise Software Co. executes enterprise cloud migrations following a standardized 15-month schedule partitioned into five sequential stages:

Month SpanEngineering StageBilling Rate (Rs. '000 per man-month)
Months 1–2System Specification50
Months 3–4Architecture & Design25
Months 5–8Core Coding15
Months 9–10System Testing20
Months 11–15Cloud Maintenance12

The scheduled headcount of software engineers assigned across the 15 months is summarized below:

Month123456789101112131415
Headcount244446655244222

Which five consecutive months have the lowest average cost per man-month under the new technique?

  1. A

    Months 1–5

  2. B

    Months 6–10

  3. C

    Months 11–15

  4. D

    None of these

Show answer and explanation

Answer: (C) Months 11–15

Question 25 Solution:

In Months 11 through 15, all activities belong entirely to 'Cloud Maintenance', where the billing rate is uniformly Rs. 12,000 per man-month.

Because this is the lowest hourly/monthly billing rate in the entire schedule (compared to 15k, 20k, 25k, and 50k in all earlier months), the average cost per man-month for the consecutive 5-month window of Months 11 to 15 is strictly the lowest.

Question 26 · CAT Level

Directions for Questions 26 to 31

Answer the questions based on the demographic survey data and graphical telemetry presented below. [CAT 1998]

The grouped bar chart below depicts the percentage growth in the number of households across three economic categories — Middle Income, Upper-Middle Income, and High Income — in four sovereign regions (North, South, East, West) over the period from 2010–11 to 2017–18:

Household Growth Percentage by Region (2010–11 to 2017–18)

The table below records national baseline totals in 2010–11 and income growth metrics over the survey period:

Income CategoryNumber of Households in 2010–11 (in thousands)Average Household Income in 2010–11Growth in Average Household Income (2017–18 over 2010–11)
Middle Income60Rs. 40,00050%
Upper-Middle Income16Rs. 60,00060%
High Income8Rs. 1,00,00080%

Which region showed the highest growth in the number of households in all the income categories for the period?

  1. A

    North

  2. B

    South

  3. C

    West

  4. D

    None of these

Show answer and explanation

Answer: (B) South

Question 26 Solution:

Examining the bar chart for each region:

  • North: Middle 150%150\%, Upper-Middle 200%200\%, High 250%250\%

  • South: Middle 200%\mathbf{200\%}, Upper-Middle 350%\mathbf{350\%}, High 400%\mathbf{400\%}

  • East: Middle 100%100\%, Upper-Middle 150%150\%, High 200%200\%

  • West: Middle 120%120\%, Upper-Middle 180%180\%, High 220%220\%

The South recorded the highest growth percentage across all three income categories simultaneously.

Question 27 · CAT Level

Directions for Questions 26 to 31

Answer the questions based on the demographic survey data and graphical telemetry presented below. [CAT 1998]

The grouped bar chart below depicts the percentage growth in the number of households across three economic categories — Middle Income, Upper-Middle Income, and High Income — in four sovereign regions (North, South, East, West) over the period from 2010–11 to 2017–18:

Household Growth Percentage by Region (2010–11 to 2017–18)

The table below records national baseline totals in 2010–11 and income growth metrics over the survey period:

Income CategoryNumber of Households in 2010–11 (in thousands)Average Household Income in 2010–11Growth in Average Household Income (2017–18 over 2010–11)
Middle Income60Rs. 40,00050%
Upper-Middle Income16Rs. 60,00060%
High Income8Rs. 1,00,00080%

What was the total household income in the Northern region for the upper-middle class in 2010–11?

  1. A

    Rs. 240 million

  2. B

    Rs. 480 million

  3. C

    Rs. 960 million

  4. D

    Cannot be determined

Show answer and explanation

Answer: (D) Cannot be determined

Question 27 Solution:

The table provides the aggregate national count of upper-middle households in 2010–11 (16,00016,000 households). However, the baseline passage provides no regional distribution or breakdown for the base year 2010–11. Therefore, the total income in the Northern region alone Cannot be determined.

Question 28 · CAT Level

Directions for Questions 26 to 31

Answer the questions based on the demographic survey data and graphical telemetry presented below. [CAT 1998]

The grouped bar chart below depicts the percentage growth in the number of households across three economic categories — Middle Income, Upper-Middle Income, and High Income — in four sovereign regions (North, South, East, West) over the period from 2010–11 to 2017–18:

Household Growth Percentage by Region (2010–11 to 2017–18)

The table below records national baseline totals in 2010–11 and income growth metrics over the survey period:

Income CategoryNumber of Households in 2010–11 (in thousands)Average Household Income in 2010–11Growth in Average Household Income (2017–18 over 2010–11)
Middle Income60Rs. 40,00050%
Upper-Middle Income16Rs. 60,00060%
High Income8Rs. 1,00,00080%

What is the percentage increase in the total number of households for the Northern region (upper-middle) over the given period?

  1. A

    150%

  2. B

    200%

  3. C

    250%

  4. D

    Cannot be determined

Show answer and explanation

Answer: (B) 200%

Question 28 Solution:

From the grouped bar chart, the height of the Upper-Middle bar for the Northern region is directly readable as 200%.

Question 29 · CAT Level

Directions for Questions 26 to 31

Answer the questions based on the demographic survey data and graphical telemetry presented below. [CAT 1998]

The grouped bar chart below depicts the percentage growth in the number of households across three economic categories — Middle Income, Upper-Middle Income, and High Income — in four sovereign regions (North, South, East, West) over the period from 2010–11 to 2017–18:

Household Growth Percentage by Region (2010–11 to 2017–18)

The table below records national baseline totals in 2010–11 and income growth metrics over the survey period:

Income CategoryNumber of Households in 2010–11 (in thousands)Average Household Income in 2010–11Growth in Average Household Income (2017–18 over 2010–11)
Middle Income60Rs. 40,00050%
Upper-Middle Income16Rs. 60,00060%
High Income8Rs. 1,00,00080%

What was the average income of the high-income group in 2010–11?

  1. A

    Rs. 60,000

  2. B

    Rs. 80,000

  3. C

    Rs. 1,00,000

  4. D

    Cannot be determined

Show answer and explanation

Answer: (C) Rs. 1,00,000

Question 29 Solution:

From the summary table, the average household income in 2010–11 for the High Income category is explicitly given as Rs. 1,00,000.

Question 30 · CAT Level

Directions for Questions 26 to 31

Answer the questions based on the demographic survey data and graphical telemetry presented below. [CAT 1998]

The grouped bar chart below depicts the percentage growth in the number of households across three economic categories — Middle Income, Upper-Middle Income, and High Income — in four sovereign regions (North, South, East, West) over the period from 2010–11 to 2017–18:

Household Growth Percentage by Region (2010–11 to 2017–18)

The table below records national baseline totals in 2010–11 and income growth metrics over the survey period:

Income CategoryNumber of Households in 2010–11 (in thousands)Average Household Income in 2010–11Growth in Average Household Income (2017–18 over 2010–11)
Middle Income60Rs. 40,00050%
Upper-Middle Income16Rs. 60,00060%
High Income8Rs. 1,00,00080%

Additional Direction for Questions 30 and 31: Assume that the numbers of households in each category were equally distributed in all four regions in 2010–11.

The ratio of total income for the high-income category to the upper-middle class increased by approximately how much percentage over the given period?

  1. A

    22%

  2. B

    29%

  3. C

    36%

  4. D

    Cannot be determined

Show answer and explanation

Answer: (B) 29%

Question 30 Solution:

  1. Baseline Incomes in 2010–11:

    • Total High Income =8,000×100,000=Rs. 800 million= 8,000 \times 100,000 = \text{Rs. } 800\text{ million}

    • Total Upper-Middle Income =16,000×60,000=Rs. 960 million= 16,000 \times 60,000 = \text{Rs. } 960\text{ million}

    • Baseline Ratio R0=800960=56≈0.8333R_0 = \frac{800}{960} = \frac{5}{6} \approx 0.8333

  2. Households in 2017–18 (Equally distributed at 25% per region in 2010–11):

    • High Income (2,000 per region):

      • North: 2000×3.5=70002000 \times 3.5 = 7000

      • South: 2000×5.0=100002000 \times 5.0 = 10000

      • East: 2000×3.0=60002000 \times 3.0 = 6000

      • West: 2000×3.2=64002000 \times 3.2 = 6400

      • Total High Households =7000+10000+6000+6400=29,400= 7000 + 10000 + 6000 + 6400 = 29,400

      • New Average Income =100,000×1.8=Rs. 1,80,000= 100,000 \times 1.8 = \text{Rs. } 1,80,000

      • Total High Income (2017–18) =29,400×180,000=Rs. 5,292 million= 29,400 \times 180,000 = \text{Rs. } 5,292\text{ million}

    • Upper-Middle (4,000 per region):

      • North: 4000×3.0=120004000 \times 3.0 = 12000

      • South: 4000×4.5=180004000 \times 4.5 = 18000

      • East: 4000×2.5=100004000 \times 2.5 = 10000

      • West: 4000×2.8=112004000 \times 2.8 = 11200

      • Total Upper-Middle Households =12000+18000+10000+11200=51,200= 12000 + 18000 + 10000 + 11200 = 51,200

      • New Average Income =60,000×1.6=Rs. 96,000= 60,000 \times 1.6 = \text{Rs. } 96,000

      • Total Upper-Middle Income (2017–18) =51,200×96,000=Rs. 4,915.2 million= 51,200 \times 96,000 = \text{Rs. } 4,915.2\text{ million}

  3. New Ratio and Percentage Increase:

    R1=52924915.2≈1.07666R_1 = \frac{5292}{4915.2} \approx 1.07666

    Percentage Increase=1.07666−0.833330.83333×100%≈29.2%≈29%\text{Percentage Increase} = \frac{1.07666 - 0.83333}{0.83333} \times 100\% \approx \mathbf{29.2\%} \approx \mathbf{29\%}

Question 31 · CAT Level

Directions for Questions 26 to 31

Answer the questions based on the demographic survey data and graphical telemetry presented below. [CAT 1998]

The grouped bar chart below depicts the percentage growth in the number of households across three economic categories — Middle Income, Upper-Middle Income, and High Income — in four sovereign regions (North, South, East, West) over the period from 2010–11 to 2017–18:

Household Growth Percentage by Region (2010–11 to 2017–18)

The table below records national baseline totals in 2010–11 and income growth metrics over the survey period:

Income CategoryNumber of Households in 2010–11 (in thousands)Average Household Income in 2010–11Growth in Average Household Income (2017–18 over 2010–11)
Middle Income60Rs. 40,00050%
Upper-Middle Income16Rs. 60,00060%
High Income8Rs. 1,00,00080%

The average income for the Northern region in 2010–11 was approximately:

  1. A

    Rs. 45,000

  2. B

    Rs. 49,524

  3. C

    Rs. 52,400

  4. D

    Cannot be determined

Show answer and explanation

Answer: (B) Rs. 49,524

Question 31 Solution:

With equal regional distribution in 2010–11, Northern region households were:

  • Middle Income: 60,0004=15,000\frac{60,000}{4} = 15,000 households

  • Upper-Middle: 16,0004=4,000\frac{16,000}{4} = 4,000 households

  • High Income: 8,0004=2,000\frac{8,000}{4} = 2,000 households

  • Total Northern households =15,000+4,000+2,000=21,000= 15,000 + 4,000 + 2,000 = 21,000

Total Northern income in 2010–11:

Total Income=(15000×40000)+(4000×60000)+(2000×100000)\text{Total Income} = (15000 \times 40000) + (4000 \times 60000) + (2000 \times 100000)

=600M+240M+200M=Rs. 1,040,000,000= 600\text{M} + 240\text{M} + 200\text{M} = \text{Rs. } 1,040,000,000

Average income:

Average Income=1,040,000,00021,000≈Rs. 49,524\text{Average Income} = \frac{1,040,000,000}{21,000} \approx \mathbf{\text{Rs. } 49,524}

Question 32 · CAT Level

Directions for Questions 32 to 34

Answer the questions on the basis of the agricultural production telemetry presented below. [CAT 2003]

The first chart below presents the Per Capita Domestic Availability of Tea (in grams) in the nation of Chaidesh from 2015 to 2019:

Chaidesh Per Capita Domestic Availability of Tea

(Note: Domestic availability is defined as Production minus Export.)

The second chart depicts total Annual Production and Export of tea (in million kg) over the same period:

Chaidesh Annual Tea Production and Export Volume

YearProduction (Million Kg)Export (Million Kg)Per Capita Availability (Grams)
2015450225500
2016600210480
2017640240520
2018700238560
2019720252585

In which year during the period 2016–2019 was Chaidesh’s export of tea, as a proportion of tea produced, the highest?

  1. A

    2016

  2. B

    2017

  3. C

    2018

  4. D

    2019

Show answer and explanation

Answer: (B) 2017

Question 32 Solution:

We calculate the ratio ExportProduction\frac{\text{Export}}{\text{Production}} across the four years:

  • 2016: 210600=0.3500 (35.0%)\frac{210}{600} = 0.3500\text{ (35.0\%)}

  • 2017: 240640=0.3750 (37.5%)\frac{240}{640} = 0.3750\text{ (37.5\%)}

  • 2018: 238700=0.3400 (34.0%)\frac{238}{700} = 0.3400\text{ (34.0\%)}

  • 2019: 252720=0.3500 (35.0%)\frac{252}{720} = 0.3500\text{ (35.0\%)}

The export proportion is strictly highest in 2017 (37.5%37.5\%).

Question 33 · CAT Level

Directions for Questions 32 to 34

Answer the questions on the basis of the agricultural production telemetry presented below. [CAT 2003]

The first chart below presents the Per Capita Domestic Availability of Tea (in grams) in the nation of Chaidesh from 2015 to 2019:

Chaidesh Per Capita Domestic Availability of Tea

(Note: Domestic availability is defined as Production minus Export.)

The second chart depicts total Annual Production and Export of tea (in million kg) over the same period:

Chaidesh Annual Tea Production and Export Volume

YearProduction (Million Kg)Export (Million Kg)Per Capita Availability (Grams)
2015450225500
2016600210480
2017640240520
2018700238560
2019720252585

In which of the following years was the population of Chaidesh the lowest?

  1. A

    2015

  2. B

    2016

  3. C

    2017

  4. D

    2019

Show answer and explanation

Answer: (A) 2015

Question 33 Solution:

Population is derived from Domestic Availability and Per Capita Availability:

Population=Production−ExportPer Capita Availability\text{Population} = \frac{\text{Production} - \text{Export}}{\text{Per Capita Availability}}

Note: 1 million kg=109 grams1\text{ million kg} = 10^9\text{ grams}, so Availability in million kg×103Per capita in gm=Population in millions\frac{\text{Availability in million kg} \times 10^3}{\text{Per capita in gm}} = \text{Population in millions}:

  • 2015: (450−225)×103500=225000500=450 million\frac{(450 - 225) \times 10^3}{500} = \frac{225000}{500} = \mathbf{450\text{ million}} (Lowest!)

  • 2016: (600−210)×103480=390000480=812.5 million\frac{(600 - 210) \times 10^3}{480} = \frac{390000}{480} = 812.5\text{ million}

  • 2017: (640−240)×103520=400000520≈769.2 million\frac{(640 - 240) \times 10^3}{520} = \frac{400000}{520} \approx 769.2\text{ million}

  • 2019: (720−252)×103585=468000585=800 million\frac{(720 - 252) \times 10^3}{585} = \frac{468000}{585} = 800\text{ million}

The population was lowest in 2015 (450 million450\text{ million}).

Question 34 · CAT Level

Directions for Questions 32 to 34

Answer the questions on the basis of the agricultural production telemetry presented below. [CAT 2003]

The first chart below presents the Per Capita Domestic Availability of Tea (in grams) in the nation of Chaidesh from 2015 to 2019:

Chaidesh Per Capita Domestic Availability of Tea

(Note: Domestic availability is defined as Production minus Export.)

The second chart depicts total Annual Production and Export of tea (in million kg) over the same period:

Chaidesh Annual Tea Production and Export Volume

YearProduction (Million Kg)Export (Million Kg)Per Capita Availability (Grams)
2015450225500
2016600210480
2017640240520
2018700238560
2019720252585

The area under tea cultivation continuously decreased in all four years from 2016 to 2019, by 10%, 7%, 4%, and 1%, respectively. In which year was tea productivity (production per unit of area) the highest?

  1. A

    2019

  2. B

    2018

  3. C

    2017

  4. D

    2016

Show answer and explanation

Answer: (A) 2019

Question 34 Solution:

Productivity is defined as Total ProductionCultivation Area\frac{\text{Total Production}}{\text{Cultivation Area}}.

From 2016 to 2019:

  1. Production: Continuously and strictly increased each year (600<640<700<720 million kg600 < 640 < 700 < 720\text{ million kg}).

  2. Area: Continuously and strictly decreased each year (by 10%10\%, 7%7\%, 4%4\%, and 1%1\%).

Because the numerator is maximized in 2019 while the denominator is minimized in 2019, productivity is unambiguously highest in 2019.

Question 35 · CAT Level

Directions for Questions 35 to 38

Answer the questions on the basis of the vital demographic registry presented below. [CAT 2003]

The Global Demographic Surveillance Bureau (GDSB) records the vital statistics of sovereign nations categorized into regional registries: Africa, Europe, Asia, North America, Oceania / Pacific, and South America.

Within each regional table, countries are sorted first by Birth Rate in ascending order, and then alphabetically by name.

Consolidation & Ranking Protocol:

To establish a single consolidated global ranking:

  1. Primary Criterion: Lower Birth Rate ranks higher.

  2. Tie-Breaker: For countries with identical birth rates, the country with the lower Death Rate ranks higher.

  3. Tied Positions: Countries sharing both identical birth and death rates receive the same rank.

  4. Competition Ranking: Subsequent positions are skipped. For example, if two countries tie for 3rd position, both receive Rank 3, and the next country receives Rank 5.

Regional Demographic Registries: Africa & Europe

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
South Africa4014AfricaGermany (FRG)1414Europe
Egypt4315AfricaAustria1615Europe
Cameroon4624AfricaBelgium1614Europe
Mozambique4920AfricaGermany (DRG)1616Europe
Zaire4920AfricaSweden1613Europe
Ghana5016AfricaSwitzerland1611Europe
Angola5125AfricaU.K.1614Europe
Madagascar5124AfricaNetherlands1710Europe
Morocco5118AfricaFrance1813Europe
Tanzania5119AfricaItaly1812Europe
Ethiopia5225AfricaGreece2011Europe
Ivory Coast5225AfricaBulgaria2112Europe
Rhodesia5216AfricaSpain2210Europe
Uganda5219AfricaYugoslavia2210Europe
Nigeria5324AfricaHungary2215Europe
Saudi Arabia5321AfricaUSSR2212Europe
Sudan5319AfricaCzech Rep.2314Europe
Algeria5418AfricaPortugal2312Europe
Kenya5416AfricaRomania2312Europe
Upper Volta5430AfricaPoland2411Europe

Regional Demographic Registries: Asia, Americas & Pacific

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
Japan208AsiaU.S.A.1911N. America
Korea (ROK)308AsiaCanada209N. America
Sri Lanka3011AsiaCuba248N. America
Taiwan307AsiaMexico449N. America
Malaysia348AsiaAustralia2010Pacific
China3513AsiaPhilippines3812Pacific
Thailand3812AsiaIndonesia4218Pacific
Turkey3814AsiaArgentina2612S. America
India4017AsiaChile269S. America
Burma4217AsiaColombia3812S. America
Iran4614AsiaBrazil4012S. America
Vietnam4619AsiaVenezuela408S. America
Korea (DPRK)4714AsiaGuatemala4416S. America
Pakistan4816AsiaPeru4415S. America
Nepal5022AsiaEcuador4613S. America
Bangladesh5121Asia————
Syria5116Asia————
Iraq5216Asia————
Afghanistan5632Asia————

In the consolidated list, what would be the overall rank of the Philippines?

  1. A

    32

  2. B

    33

  3. C

    34

  4. D

    35

Show answer and explanation

Answer: (B) 33

Question 35 Solution:

  1. In the consolidated list, exactly 32 nations have a birth rate strictly lower than 3838.

  2. Three nations — Philippines (Pacific), Thailand (Asia), and Colombia (S. America) — share identical birth rate 3838 and identical death rate 1212.

  3. Therefore, all three nations tie and receive Rank 33 in the consolidated global list.

Question 36 · CAT Level

Directions for Questions 35 to 38

Answer the questions on the basis of the vital demographic registry presented below. [CAT 2003]

The Global Demographic Surveillance Bureau (GDSB) records the vital statistics of sovereign nations categorized into regional registries: Africa, Europe, Asia, North America, Oceania / Pacific, and South America.

Within each regional table, countries are sorted first by Birth Rate in ascending order, and then alphabetically by name.

Consolidation & Ranking Protocol:

To establish a single consolidated global ranking:

  1. Primary Criterion: Lower Birth Rate ranks higher.

  2. Tie-Breaker: For countries with identical birth rates, the country with the lower Death Rate ranks higher.

  3. Tied Positions: Countries sharing both identical birth and death rates receive the same rank.

  4. Competition Ranking: Subsequent positions are skipped. For example, if two countries tie for 3rd position, both receive Rank 3, and the next country receives Rank 5.

Regional Demographic Registries: Africa & Europe

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
South Africa4014AfricaGermany (FRG)1414Europe
Egypt4315AfricaAustria1615Europe
Cameroon4624AfricaBelgium1614Europe
Mozambique4920AfricaGermany (DRG)1616Europe
Zaire4920AfricaSweden1613Europe
Ghana5016AfricaSwitzerland1611Europe
Angola5125AfricaU.K.1614Europe
Madagascar5124AfricaNetherlands1710Europe
Morocco5118AfricaFrance1813Europe
Tanzania5119AfricaItaly1812Europe
Ethiopia5225AfricaGreece2011Europe
Ivory Coast5225AfricaBulgaria2112Europe
Rhodesia5216AfricaSpain2210Europe
Uganda5219AfricaYugoslavia2210Europe
Nigeria5324AfricaHungary2215Europe
Saudi Arabia5321AfricaUSSR2212Europe
Sudan5319AfricaCzech Rep.2314Europe
Algeria5418AfricaPortugal2312Europe
Kenya5416AfricaRomania2312Europe
Upper Volta5430AfricaPoland2411Europe

Regional Demographic Registries: Asia, Americas & Pacific

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
Japan208AsiaU.S.A.1911N. America
Korea (ROK)308AsiaCanada209N. America
Sri Lanka3011AsiaCuba248N. America
Taiwan307AsiaMexico449N. America
Malaysia348AsiaAustralia2010Pacific
China3513AsiaPhilippines3812Pacific
Thailand3812AsiaIndonesia4218Pacific
Turkey3814AsiaArgentina2612S. America
India4017AsiaChile269S. America
Burma4217AsiaColombia3812S. America
Iran4614AsiaBrazil4012S. America
Vietnam4619AsiaVenezuela408S. America
Korea (DPRK)4714AsiaGuatemala4416S. America
Pakistan4816AsiaPeru4415S. America
Nepal5022AsiaEcuador4613S. America
Bangladesh5121Asia————
Syria5116Asia————
Iraq5216Asia————
Afghanistan5632Asia————

In the consolidated list, how many countries would rank below Spain and above Taiwan?

  1. A

    7

  2. B

    8

  3. C

    9

  4. D

    10

Show answer and explanation

Answer: (C) 9

Question 36 Solution:

  1. Rank of Spain: Spain has birth rate 2222 and death rate 1010. It ties with Yugoslavia (22,1022, 10) at Rank 17.

    Because two nations tie at Rank 17, the next position is Rank 19.

  2. Rank of Taiwan: Taiwan has birth rate 3030 and death rate 77, ranking at Rank 28.

  3. Count of intervening nations:

    The nations strictly below Spain and strictly above Taiwan occupy positions from Rank 19 through Rank 27:

    Count=28−19=9 countries\text{Count} = 28 - 19 = \mathbf{9\text{ countries}}

Question 37 · CAT Level

Directions for Questions 35 to 38

Answer the questions on the basis of the vital demographic registry presented below. [CAT 2003]

The Global Demographic Surveillance Bureau (GDSB) records the vital statistics of sovereign nations categorized into regional registries: Africa, Europe, Asia, North America, Oceania / Pacific, and South America.

Within each regional table, countries are sorted first by Birth Rate in ascending order, and then alphabetically by name.

Consolidation & Ranking Protocol:

To establish a single consolidated global ranking:

  1. Primary Criterion: Lower Birth Rate ranks higher.

  2. Tie-Breaker: For countries with identical birth rates, the country with the lower Death Rate ranks higher.

  3. Tied Positions: Countries sharing both identical birth and death rates receive the same rank.

  4. Competition Ranking: Subsequent positions are skipped. For example, if two countries tie for 3rd position, both receive Rank 3, and the next country receives Rank 5.

Regional Demographic Registries: Africa & Europe

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
South Africa4014AfricaGermany (FRG)1414Europe
Egypt4315AfricaAustria1615Europe
Cameroon4624AfricaBelgium1614Europe
Mozambique4920AfricaGermany (DRG)1616Europe
Zaire4920AfricaSweden1613Europe
Ghana5016AfricaSwitzerland1611Europe
Angola5125AfricaU.K.1614Europe
Madagascar5124AfricaNetherlands1710Europe
Morocco5118AfricaFrance1813Europe
Tanzania5119AfricaItaly1812Europe
Ethiopia5225AfricaGreece2011Europe
Ivory Coast5225AfricaBulgaria2112Europe
Rhodesia5216AfricaSpain2210Europe
Uganda5219AfricaYugoslavia2210Europe
Nigeria5324AfricaHungary2215Europe
Saudi Arabia5321AfricaUSSR2212Europe
Sudan5319AfricaCzech Rep.2314Europe
Algeria5418AfricaPortugal2312Europe
Kenya5416AfricaRomania2312Europe
Upper Volta5430AfricaPoland2411Europe

Regional Demographic Registries: Asia, Americas & Pacific

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
Japan208AsiaU.S.A.1911N. America
Korea (ROK)308AsiaCanada209N. America
Sri Lanka3011AsiaCuba248N. America
Taiwan307AsiaMexico449N. America
Malaysia348AsiaAustralia2010Pacific
China3513AsiaPhilippines3812Pacific
Thailand3812AsiaIndonesia4218Pacific
Turkey3814AsiaArgentina2612S. America
India4017AsiaChile269S. America
Burma4217AsiaColombia3812S. America
Iran4614AsiaBrazil4012S. America
Vietnam4619AsiaVenezuela408S. America
Korea (DPRK)4714AsiaGuatemala4416S. America
Pakistan4816AsiaPeru4415S. America
Nepal5022AsiaEcuador4613S. America
Bangladesh5121Asia————
Syria5116Asia————
Iraq5216Asia————
Afghanistan5632Asia————

In the consolidated list, which country ranks 37th?

  1. A

    South Africa

  2. B

    Brazil

  3. C

    Turkey

  4. D

    Venezuela

Show answer and explanation

Answer: (D) Venezuela

Question 37 Solution:

  1. Exactly 36 countries have a birth rate ≤38\le 38 (32 countries with BR <38< 38, 3 countries at BR 3838, DR 1212 tied at Rank 33, and Turkey at BR 3838, DR 1414 at Rank 36).

  2. For birth rate 4040, the nations ordered by death rate are:

    • Venezuela: BR =40= 40, DR =8= 8

    • Brazil: BR =40= 40, DR =12= 12

    • South Africa: BR =40= 40, DR =14= 14

    • India: BR =40= 40, DR =17= 17

  3. Having the lowest death rate (88) among nations with birth rate 4040, Venezuela is assigned Rank 37.

Question 38 · CAT Level

Directions for Questions 35 to 38

Answer the questions on the basis of the vital demographic registry presented below. [CAT 2003]

The Global Demographic Surveillance Bureau (GDSB) records the vital statistics of sovereign nations categorized into regional registries: Africa, Europe, Asia, North America, Oceania / Pacific, and South America.

Within each regional table, countries are sorted first by Birth Rate in ascending order, and then alphabetically by name.

Consolidation & Ranking Protocol:

To establish a single consolidated global ranking:

  1. Primary Criterion: Lower Birth Rate ranks higher.

  2. Tie-Breaker: For countries with identical birth rates, the country with the lower Death Rate ranks higher.

  3. Tied Positions: Countries sharing both identical birth and death rates receive the same rank.

  4. Competition Ranking: Subsequent positions are skipped. For example, if two countries tie for 3rd position, both receive Rank 3, and the next country receives Rank 5.

Regional Demographic Registries: Africa & Europe

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
South Africa4014AfricaGermany (FRG)1414Europe
Egypt4315AfricaAustria1615Europe
Cameroon4624AfricaBelgium1614Europe
Mozambique4920AfricaGermany (DRG)1616Europe
Zaire4920AfricaSweden1613Europe
Ghana5016AfricaSwitzerland1611Europe
Angola5125AfricaU.K.1614Europe
Madagascar5124AfricaNetherlands1710Europe
Morocco5118AfricaFrance1813Europe
Tanzania5119AfricaItaly1812Europe
Ethiopia5225AfricaGreece2011Europe
Ivory Coast5225AfricaBulgaria2112Europe
Rhodesia5216AfricaSpain2210Europe
Uganda5219AfricaYugoslavia2210Europe
Nigeria5324AfricaHungary2215Europe
Saudi Arabia5321AfricaUSSR2212Europe
Sudan5319AfricaCzech Rep.2314Europe
Algeria5418AfricaPortugal2312Europe
Kenya5416AfricaRomania2312Europe
Upper Volta5430AfricaPoland2411Europe

Regional Demographic Registries: Asia, Americas & Pacific

CountryBirth RateDeath RateRegionCountryBirth RateDeath RateRegion
Japan208AsiaU.S.A.1911N. America
Korea (ROK)308AsiaCanada209N. America
Sri Lanka3011AsiaCuba248N. America
Taiwan307AsiaMexico449N. America
Malaysia348AsiaAustralia2010Pacific
China3513AsiaPhilippines3812Pacific
Thailand3812AsiaIndonesia4218Pacific
Turkey3814AsiaArgentina2612S. America
India4017AsiaChile269S. America
Burma4217AsiaColombia3812S. America
Iran4614AsiaBrazil4012S. America
Vietnam4619AsiaVenezuela408S. America
Korea (DPRK)4714AsiaGuatemala4416S. America
Pakistan4816AsiaPeru4415S. America
Nepal5022AsiaEcuador4613S. America
Bangladesh5121Asia————
Syria5116Asia————
Iraq5216Asia————
Afghanistan5632Asia————

In the consolidated list, how many countries in Asia will rank lower than every country in South America, but higher than at least one country in Africa?

  1. A

    6

  2. B

    7

  3. C

    8

  4. D

    9

Show answer and explanation

Answer: (C) 8

Question 38 Solution:

  1. The lowest-ranked South American country is Ecuador (BR =46= 46, DR =13= 13).

  2. The lowest-ranked African country is Upper Volta (BR =54= 54, DR =30= 30).

  3. We count the Asian countries ranked strictly below Ecuador and strictly above Upper Volta:

    • Iran (46, 14)

    • Vietnam (46, 19)

    • Korea (DPRK) (47, 14)

    • Pakistan (48, 16)

    • Nepal (50, 22)

    • Syria (51, 16)

    • Bangladesh (51, 21)

    • Iraq (52, 16)

(Note: Afghanistan has BR 56, DR 32, which ranks below Upper Volta).

Thus, exactly 8 Asian countries satisfy the condition.

Question 39 · CAT Level

Directions for Questions 39 to 42

Answer the questions on the basis of the corporate financial charts presented below. [CAT 2003]

The profitability of an enterprise is defined as the ratio of its operating profit to its operating income, expressed as a percentage:

Profitability=(Operating ProfitOperating Income)×100\text{Profitability} = \left(\frac{\text{Operating Profit}}{\text{Operating Income}}\right) \times 100

The first chart displays the operating income and profitability of six enterprise groups (A, B, C, D, E, and F) across the fiscal years FY 2001–02 and FY 2002–03:

Operating Income and Profitability across Companies A to F

The second chart plots the Operating Profit vs. Operating Income coordinates for four of these companies for FY 2002–03:

Operating Profit vs Operating Income Scatter Plot

CompanyOperating Income (Rs. Cr)Profitability (%)FY 2002–03 Operating Profit (Rs. Cr)
FY 01–02FY 02–03FY 01–02FY 02–03
A1601808%10%18.0
B300250-5%2%5.0
C20024015%15%36.0
D300350-3%1%3.5
E18022018%20%44.0
F22026012%10%26.0

Which of the following statements is NOT true?

  1. A

    The company with the third lowest profitability in FY 2001–02 has the lowest operating income in FY 2002–03.

  2. B

    The company with the highest operating income in the two financial years combined has the lowest operating profit in FY 2002–03.

  3. C

    Companies with a higher operating income in FY 2001–02 than in FY 2002–03 have higher profitability in FY 2002–03 than in FY 2001–02.

  4. D

    Companies with profitability between 10% and 20% in FY 2001–02 also have operating incomes between 180 crore and 230 crore in FY 2002–03.

Show answer and explanation

Answer: (D) Companies with profitability between 10% and 20% in FY 2001–02 also have operating incomes between 180 crore and 230 crore in FY 2002–03.

Question 39 Solution:

We evaluate each statement against the dataset:

  1. Statement 1: Profitability in FY 01–02 in ascending order: B (−5%-5\%), D (−3%-3\%), A (8%8\%), F (12%12\%), C (15%15\%), E (18%18\%). The 3rd lowest is Company A. In FY 02–03, Company A has operating income Rs. 180 Cr, which is the lowest among all six companies. (TRUE)

  2. Statement 2: Combined operating income: D has 300+350=650 Cr300 + 350 = 650\text{ Cr} (highest). In FY 02–03, D's operating profit is 350×1%=3.5 Cr350 \times 1\% = 3.5\text{ Cr}, which is the lowest. (TRUE)

  3. Statement 3: Only Company B had higher income in FY 01–02 than FY 02–03 (300>250 Cr300 > 250\text{ Cr}). B's profitability improved from −5%-5\% to 2%2\%. (TRUE)

  4. Statement 4: Companies with profitability between 10%10\% and 20%20\% in FY 01–02 are F (12%12\%), C (15%15\%), and E (18%18\%). Their FY 02–03 operating incomes are F (260 Cr260\text{ Cr}), C (240 Cr240\text{ Cr}), and E (220 Cr220\text{ Cr}). F and C exceed 230 Cr230\text{ Cr}, making the statement NOT true.

Question 40 · CAT Level

Directions for Questions 39 to 42

Answer the questions on the basis of the corporate financial charts presented below. [CAT 2003]

The profitability of an enterprise is defined as the ratio of its operating profit to its operating income, expressed as a percentage:

Profitability=(Operating ProfitOperating Income)×100\text{Profitability} = \left(\frac{\text{Operating Profit}}{\text{Operating Income}}\right) \times 100

The first chart displays the operating income and profitability of six enterprise groups (A, B, C, D, E, and F) across the fiscal years FY 2001–02 and FY 2002–03:

Operating Income and Profitability across Companies A to F

The second chart plots the Operating Profit vs. Operating Income coordinates for four of these companies for FY 2002–03:

Operating Profit vs Operating Income Scatter Plot

CompanyOperating Income (Rs. Cr)Profitability (%)FY 2002–03 Operating Profit (Rs. Cr)
FY 01–02FY 02–03FY 01–02FY 02–03
A1601808%10%18.0
B300250-5%2%5.0
C20024015%15%36.0
D300350-3%1%3.5
E18022018%20%44.0
F22026012%10%26.0

Which company recorded the highest operating profit in FY 2002–03?

  1. A

    Company A

  2. B

    Company C

  3. C

    Company E

  4. D

    Company F

Show answer and explanation

Answer: (C) Company E

Question 40 Solution:

Calculating FY 2002–03 operating profit for each company:

  • A: 180×10%=Rs. 18.0 crore180 \times 10\% = \text{Rs. } 18.0\text{ crore}

  • B: 250×2%=Rs. 5.0 crore250 \times 2\% = \text{Rs. } 5.0\text{ crore}

  • C: 240×15%=Rs. 36.0 crore240 \times 15\% = \text{Rs. } 36.0\text{ crore}

  • D: 350×1%=Rs. 3.5 crore350 \times 1\% = \text{Rs. } 3.5\text{ crore}

  • E: 220×20%=Rs. 44.0 crore220 \times 20\% = \mathbf{\text{Rs. } 44.0\text{ crore}}

  • F: 260×10%=Rs. 26.0 crore260 \times 10\% = \text{Rs. } 26.0\text{ crore}

Company E achieved the highest operating profit of Rs. 44.0 crore.

Question 41 · CAT Level

Directions for Questions 39 to 42

Answer the questions on the basis of the corporate financial charts presented below. [CAT 2003]

The profitability of an enterprise is defined as the ratio of its operating profit to its operating income, expressed as a percentage:

Profitability=(Operating ProfitOperating Income)×100\text{Profitability} = \left(\frac{\text{Operating Profit}}{\text{Operating Income}}\right) \times 100

The first chart displays the operating income and profitability of six enterprise groups (A, B, C, D, E, and F) across the fiscal years FY 2001–02 and FY 2002–03:

Operating Income and Profitability across Companies A to F

The second chart plots the Operating Profit vs. Operating Income coordinates for four of these companies for FY 2002–03:

Operating Profit vs Operating Income Scatter Plot

CompanyOperating Income (Rs. Cr)Profitability (%)FY 2002–03 Operating Profit (Rs. Cr)
FY 01–02FY 02–03FY 01–02FY 02–03
A1601808%10%18.0
B300250-5%2%5.0
C20024015%15%36.0
D300350-3%1%3.5
E18022018%20%44.0
F22026012%10%26.0

What is the approximate average operating profit, in FY 2001–02, of the two companies excluded from the second chart?

  1. A

    –12.0 crore

  2. B

    –6.5 crore

  3. C

    4.0 crore

  4. D

    Cannot be determined

Show answer and explanation

Answer: (A) –12.0 crore

Question 41 Solution:

  1. The scatter chart plots four points: A (180,18)(180, 18), C (240,36)(240, 36), E (220,44)(220, 44), and F (260,26)(260, 26).

  2. The two companies excluded from the chart are B and D.

  3. In FY 2001–02, their operating profits were:

    • Company B: 300×(−5%)=−15 crore300 \times (-5\%) = -15\text{ crore}

    • Company D: 300×(−3%)=−9 crore300 \times (-3\%) = -9\text{ crore}

  4. Average Operating Profit:

    Average=−15+(−9)2=−242=−12.0 crore\text{Average} = \frac{-15 + (-9)}{2} = \frac{-24}{2} = \mathbf{-12.0\text{ crore}}

Question 42 · CAT Level

Directions for Questions 39 to 42

Answer the questions on the basis of the corporate financial charts presented below. [CAT 2003]

The profitability of an enterprise is defined as the ratio of its operating profit to its operating income, expressed as a percentage:

Profitability=(Operating ProfitOperating Income)×100\text{Profitability} = \left(\frac{\text{Operating Profit}}{\text{Operating Income}}\right) \times 100

The first chart displays the operating income and profitability of six enterprise groups (A, B, C, D, E, and F) across the fiscal years FY 2001–02 and FY 2002–03:

Operating Income and Profitability across Companies A to F

The second chart plots the Operating Profit vs. Operating Income coordinates for four of these companies for FY 2002–03:

Operating Profit vs Operating Income Scatter Plot

CompanyOperating Income (Rs. Cr)Profitability (%)FY 2002–03 Operating Profit (Rs. Cr)
FY 01–02FY 02–03FY 01–02FY 02–03
A1601808%10%18.0
B300250-5%2%5.0
C20024015%15%36.0
D300350-3%1%3.5
E18022018%20%44.0
F22026012%10%26.0

The average operating profit in FY 2002–03 of companies with profitability exceeding 10% in FY 2002–03 is approximately:

  1. A

    25.0 crore

  2. B

    32.5 crore

  3. C

    36.0 crore

  4. D

    40.0 crore

Show answer and explanation

Answer: (D) 40.0 crore

Question 42 Solution:

In FY 2002–03, the companies with profitability strictly exceeding 10%10\% are:

  • Company C: Profitability =15%= 15\%, Operating Profit =Rs. 36.0 crore= \text{Rs. } 36.0\text{ crore}

  • Company E: Profitability =20%= 20\%, Operating Profit =Rs. 44.0 crore= \text{Rs. } 44.0\text{ crore}

Average=36.0+44.02=80.02=Rs. 40.0 crore\text{Average} = \frac{36.0 + 44.0}{2} = \frac{80.0}{2} = \mathbf{\text{Rs. } 40.0\text{ crore}}

Question 43 · CAT Level

Directions for Questions 43 to 46

Answer the questions on the basis of the medical tourism and health economic dataset presented below. [CAT 2007]

The table below shows the base comparative costs (in US Dollars) of major surgical procedures in the USA and four Asian medical hub nations:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$140,000$12,000$14,000$20,000$11,000
Heart Valve Replacement$170,000$11,000$12,000$15,000$11,000
Angioplasty$60,000$12,000$15,000$16,000$13,000
Hip Replacement$50,000$10,000$14,000$14,000$12,000
Hysterectomy$25,000$4,000$6,000$7,500$4,500
Knee Replacement$45,000$10,000$11,000$13,000$9,000
Spinal Fusion$70,000$6,500$8,500$11,000$7,500

The baseline currency exchange rates per US Dollar are:

  • India: 50.00 Rupees

  • Malaysia: 4.00 Ringgits

  • Thailand: 35.00 Bahts

  • Singapore: 1.40 S Dollars

An international healthcare audit revealed that post-operative quality varies by country. Sub-optimal clinical quality imposes additional expected costs to correct complications. The estimated cost of poor quality (in thousands of US Dollars) is tabulated below:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$0$4,000$4,000$2,000$5,000
Heart Valve Replacement$0$6,000$5,000$6,000$6,000
Angioplasty$0$6,000$6,000$5,000$7,000
Hip Replacement$0$8,000$6,000$6,000$9,000
Hysterectomy$0$6,000$7,000$6,000$5,000
Knee Replacement$0$10,000$7,000$5,000$5,000
Spinal Fusion$0$6,000$7,000$6,000$7,000

A US patient injured in an industrial accident requires an Angioplasty, Hip Replacement, and a Knee Replacement. Cost of international travel and lodging is fully covered by corporate insurance. Which destination country will result in the cheapest total package, taking the cost of poor quality into account?

  1. A

    India

  2. B

    Thailand

  3. C

    Malaysia

  4. D

    Singapore

Show answer and explanation

Answer: (C) Malaysia

Question 43 Solution:

We sum the Base Procedure Cost and Cost of Poor Quality (in thousands of US Dollars) across the three surgeries:

  1. India:

    • Angioplasty: 12+6=1812 + 6 = 18

    • Hip Replacement: 10+8=1810 + 8 = 18

    • Knee Replacement: 10+10=2010 + 10 = 20

    • Total =18+18+20=$56.0k= 18 + 18 + 20 = \text{\textdollar}56.0\text{k}

  2. Thailand:

    • Angioplasty: 15+6=2115 + 6 = 21

    • Hip Replacement: 14+6=2014 + 6 = 20

    • Knee Replacement: 11+7=1811 + 7 = 18

    • Total =21+20+18=$59.0k= 21 + 20 + 18 = \text{\textdollar}59.0\text{k}

  3. Malaysia:

    • Angioplasty: 13+7=2013 + 7 = 20

    • Hip Replacement: 12+9=2112 + 9 = 21

    • Knee Replacement: 9+5=149 + 5 = 14

    • Total =20+21+14=$55.0k= 20 + 21 + 14 = \mathbf{\text{\textdollar}55.0\text{k}} (Cheapest!)

  4. Singapore:

    • Angioplasty: 16+5=2116 + 5 = 21

    • Hip Replacement: 14+6=2014 + 6 = 20

    • Knee Replacement: 13+5=1813 + 5 = 18

    • Total =21+20+18=$59.0k= 21 + 20 + 18 = \text{\textdollar}59.0\text{k}

  5. USA:

    • 60+50+45=$155.0k60 + 50 + 45 = \text{\textdollar}155.0\text{k}

The cheapest destination is Malaysia at $55,000.

Question 44 · CAT Level

Directions for Questions 43 to 46

Answer the questions on the basis of the medical tourism and health economic dataset presented below. [CAT 2007]

The table below shows the base comparative costs (in US Dollars) of major surgical procedures in the USA and four Asian medical hub nations:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$140,000$12,000$14,000$20,000$11,000
Heart Valve Replacement$170,000$11,000$12,000$15,000$11,000
Angioplasty$60,000$12,000$15,000$16,000$13,000
Hip Replacement$50,000$10,000$14,000$14,000$12,000
Hysterectomy$25,000$4,000$6,000$7,500$4,500
Knee Replacement$45,000$10,000$11,000$13,000$9,000
Spinal Fusion$70,000$6,500$8,500$11,000$7,500

The baseline currency exchange rates per US Dollar are:

  • India: 50.00 Rupees

  • Malaysia: 4.00 Ringgits

  • Thailand: 35.00 Bahts

  • Singapore: 1.40 S Dollars

An international healthcare audit revealed that post-operative quality varies by country. Sub-optimal clinical quality imposes additional expected costs to correct complications. The estimated cost of poor quality (in thousands of US Dollars) is tabulated below:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$0$4,000$4,000$2,000$5,000
Heart Valve Replacement$0$6,000$5,000$6,000$6,000
Angioplasty$0$6,000$6,000$5,000$7,000
Hip Replacement$0$8,000$6,000$6,000$9,000
Hysterectomy$0$6,000$7,000$6,000$5,000
Knee Replacement$0$10,000$7,000$5,000$5,000
Spinal Fusion$0$6,000$7,000$6,000$7,000

Taking the cost of poor quality into account, which country will be the most expensive for Knee Replacement among the Asian destinations?

  1. A

    India

  2. B

    Thailand

  3. C

    Malaysia

  4. D

    Singapore

Show answer and explanation

Answer: (A) India

Question 44 Solution:

Total cost for Knee Replacement (Base Cost + Cost of Poor Quality):

  • India: 10,000+10,000=$20,00010,000 + 10,000 = \mathbf{\text{\textdollar}20,000} (Most expensive!)

  • Thailand: 11,000+7,000=$18,00011,000 + 7,000 = \text{\textdollar}18,000

  • Singapore: 13,000+5,000=$18,00013,000 + 5,000 = \text{\textdollar}18,000

  • Malaysia: 9,000+5,000=$14,0009,000 + 5,000 = \text{\textdollar}14,000

India is the most expensive destination for Knee Replacement surgery when poor quality risk is incorporated.

Question 45 · CAT Level

Directions for Questions 43 to 46

Answer the questions on the basis of the medical tourism and health economic dataset presented below. [CAT 2007]

The table below shows the base comparative costs (in US Dollars) of major surgical procedures in the USA and four Asian medical hub nations:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$140,000$12,000$14,000$20,000$11,000
Heart Valve Replacement$170,000$11,000$12,000$15,000$11,000
Angioplasty$60,000$12,000$15,000$16,000$13,000
Hip Replacement$50,000$10,000$14,000$14,000$12,000
Hysterectomy$25,000$4,000$6,000$7,500$4,500
Knee Replacement$45,000$10,000$11,000$13,000$9,000
Spinal Fusion$70,000$6,500$8,500$11,000$7,500

The baseline currency exchange rates per US Dollar are:

  • India: 50.00 Rupees

  • Malaysia: 4.00 Ringgits

  • Thailand: 35.00 Bahts

  • Singapore: 1.40 S Dollars

An international healthcare audit revealed that post-operative quality varies by country. Sub-optimal clinical quality imposes additional expected costs to correct complications. The estimated cost of poor quality (in thousands of US Dollars) is tabulated below:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$0$4,000$4,000$2,000$5,000
Heart Valve Replacement$0$6,000$5,000$6,000$6,000
Angioplasty$0$6,000$6,000$5,000$7,000
Hip Replacement$0$8,000$6,000$6,000$9,000
Hysterectomy$0$6,000$7,000$6,000$5,000
Knee Replacement$0$10,000$7,000$5,000$5,000
Spinal Fusion$0$6,000$7,000$6,000$7,000

Approximately, what difference in amount in Bahts will it make to a Thai citizen if she were to get a hysterectomy done in India instead of in her native country, taking into account the cost of poor quality? (Assume it costs 8,000 Bahts for one-way air travel between Thailand and India, i.e., 16,000 Bahts round trip).

  1. A

    68,000 Bahts

  2. B

    75,000 Bahts

  3. C

    89,000 Bahts

  4. D

    105,000 Bahts

Show answer and explanation

Answer: (C) 89,000 Bahts

Question 45 Solution:

  1. Cost in Thailand:

    • Base Procedure Cost =$6,000= \text{\textdollar}6,000

    • Cost of Poor Quality =$7,000= \text{\textdollar}7,000

    • Total in USD =$13,000= \text{\textdollar}13,000

    • Converting to Bahts (1 USD=35 Bahts1\text{ USD} = 35\text{ Bahts}):

      13000×35=455,000 Bahts13000 \times 35 = 455,000\text{ Bahts}

  2. Cost in India:

    • Base Procedure Cost =$4,000= \text{\textdollar}4,000

    • Cost of Poor Quality =$6,000= \text{\textdollar}6,000

    • Total Medical Cost in USD =$10,000= \text{\textdollar}10,000

    • Medical Cost in Bahts =10000×35=350,000 Bahts= 10000 \times 35 = 350,000\text{ Bahts}

    • Round-trip air travel =2×8000=16,000 Bahts= 2 \times 8000 = 16,000\text{ Bahts}

    • Total Cost in India =350,000+16,000=366,000 Bahts= 350,000 + 16,000 = 366,000\text{ Bahts}

  3. Difference:

    Net Savings=455,000−366,000=89,000 Bahts\text{Net Savings} = 455,000 - 366,000 = \mathbf{89,000\text{ Bahts}}

Question 46 · CAT Level

Directions for Questions 43 to 46

Answer the questions on the basis of the medical tourism and health economic dataset presented below. [CAT 2007]

The table below shows the base comparative costs (in US Dollars) of major surgical procedures in the USA and four Asian medical hub nations:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$140,000$12,000$14,000$20,000$11,000
Heart Valve Replacement$170,000$11,000$12,000$15,000$11,000
Angioplasty$60,000$12,000$15,000$16,000$13,000
Hip Replacement$50,000$10,000$14,000$14,000$12,000
Hysterectomy$25,000$4,000$6,000$7,500$4,500
Knee Replacement$45,000$10,000$11,000$13,000$9,000
Spinal Fusion$70,000$6,500$8,500$11,000$7,500

The baseline currency exchange rates per US Dollar are:

  • India: 50.00 Rupees

  • Malaysia: 4.00 Ringgits

  • Thailand: 35.00 Bahts

  • Singapore: 1.40 S Dollars

An international healthcare audit revealed that post-operative quality varies by country. Sub-optimal clinical quality imposes additional expected costs to correct complications. The estimated cost of poor quality (in thousands of US Dollars) is tabulated below:

ProcedureUSAIndiaThailandSingaporeMalaysia
Heart Bypass$0$4,000$4,000$2,000$5,000
Heart Valve Replacement$0$6,000$5,000$6,000$6,000
Angioplasty$0$6,000$6,000$5,000$7,000
Hip Replacement$0$8,000$6,000$6,000$9,000
Hysterectomy$0$6,000$7,000$6,000$5,000
Knee Replacement$0$10,000$7,000$5,000$5,000
Spinal Fusion$0$6,000$7,000$6,000$7,000

The rupee value strengthens to Rs. 40 per US Dollar (from the original Rs. 50 per Dollar), while local hospital prices in Rupees and all other parameters remain unchanged. What is the approximate difference in cost, in US Dollars, between Singapore and India for a Spinal Fusion, taking this currency appreciation into account?

  1. A

    1,500 USD

  2. B

    2,875 USD

  3. C

    3,500 USD

  4. D

    4,200 USD

Show answer and explanation

Answer: (B) 2,875 USD

Question 46 Solution:

  1. Spinal Fusion Cost in India:

    Originally, at 1 USD=50 Rupees1\text{ USD} = 50\text{ Rupees}, the base cost was $6,500\text{\textdollar}6,500.

    The procedure price in local Indian Rupees =6500×50=Rs. 3,25,000= 6500 \times 50 = \text{Rs. } 3,25,000.

    When the rupee strengthens to Rs. 40/USD\text{Rs. } 40 / \text{USD}, the new cost in USD becomes:

    Cost in USD=325,00040=$8,125\text{Cost in USD} = \frac{325,000}{40} = \text{\textdollar}8,125

  2. Spinal Fusion Cost in Singapore:

    Base cost in Singapore =$11,000= \text{\textdollar}11,000.

  3. Cost Difference:

    Difference=11000−8125=$2,875\text{Difference} = 11000 - 8125 = \mathbf{\text{\textdollar}2,875}

Try real CAT questions

Study this concept with interactive practice in PrepSoc.

Open the concept library