Free CAT library

Bar Graph: Concepts & Solved Examples

Master simple, grouped, stacked, and 100% subdivided bar charts, baseline distortion traps, cumulative inventory tracking, and constrained Diophantine optimization.

Core Conceptual Framework: Bar Graphs

A Bar Graph (or Bar Chart) is a foundational visual representation of categorical or discrete data using rectangular bars whose heights (in vertical column charts) or lengths (in horizontal bar charts) are strictly proportional to the numerical values they represent. In CAT and IPMAT Data Interpretation, bar graphs evaluate rapid visual estimation, ratio comparisons, percentage growth rates, multi-tier component decompositions, and constrained integer optimization.


1. Taxonomy of Bar Charts

A. Simple Bar Charts
  • Uses a single bar per category or time interval.

  • Orientation: Can be vertical (column chart) or horizontal.

  • Reading Metric: The height (or length) measured against the uniform scale represents the absolute metric directly.

  • Critical Check: Always verify whether the baseline starts at zero (00) or is truncated at an arbitrary non-zero value (y0>0y_0 > 0). Truncated axes artificially amplify visual differences.

B. Grouped (Clustered) Bar Charts
  • Displays two or more bars side-by-side for each primary category to allow direct multi-metric comparisons across sub-categories (e.g., comparing Sales, Costs, and Profits across multiple fiscal quarters).

  • Legend Alignment: Each color or shading pattern corresponds to a specific entity across all clusters.

  • Analytical Utility: Ideal for evaluating ratios between entities within the same time period and tracking entity-specific trajectories over time.

C. Stacked (Component) Bar Charts
  • Each bar represents a cumulative total, subdivided into segments representing distinct constituent components stacked atop one another.

  • Cumulative vs. Component Values:

    • The bottom segment baseline is 00; its height is read directly from the vertical axis.

    • Any interior (middle or upper) segment starts at a floating baseline. Its absolute value is:

      Valuesegment=yupper−ylower\text{Value}_{\text{segment}} = y_{\text{upper}} - y_{\text{lower}}

      where yuppery_{\text{upper}} is the top boundary and ylowery_{\text{lower}} is the bottom boundary of that segment.

    • The total bar height represents the grand sum of all constituent parts.

D. 100% Subdivided (Percentage) Bar Charts
  • All bars have an identical total height normalized to 100%100\%.

  • Each segment represents the relative percentage share of a component within that specific total.

  • The Base-Size Fallacy: A component occupying 40%40\% in Bar A may represent a smaller absolute quantity than a component occupying 25%25\% in Bar B if the total magnitude of Bar B is significantly larger than Bar A:

    Absolute Component Value=Percentage Share100×Total Magnitude\text{Absolute Component Value} = \frac{\text{Percentage Share}}{100} \times \text{Total Magnitude}

E. Bidirectional (Deviation) Bar Charts & Broken Scale Charts
  • Features bars extending both above and below a central zero-reference axis.

  • Used to depict positive and negative variances such as net profit/loss, trade surplus/deficit, or year-over-year percentage change.

  • Broken Scale Charts: Used when one or two outlier values dwarf the remaining data points; zig-zag break lines indicate non-linear jumps in scale.


2. Key Mathematical Operations in Bar Graphs

A. Segment Isolation in Stacked Charts

To determine the magnitude of component kk located between cumulative boundaries Ck−1C_{k-1} and CkC_k:

Segment Valuek=Ck−Ck−1\text{Segment Value}_k = C_k - C_{k-1}

Strategic Warning: Never read the top coordinate of an upper segment as its standalone value without subtracting the lower coordinate baseline.

B. Relative Share & Contribution Ratios

The percentage contribution of entity AA to the group total in period tt:

ShareA(%)=VA,t∑iVi,t×100%\text{Share}_A (\%) = \frac{V_{A, t}}{\sum_{i} V_{i, t}} \times 100\%

To determine which entity experienced the greatest change in share, evaluate the shift in VA,tTotalt\frac{V_{A, t}}{\text{Total}_t} across periods.

C. Multi-Period Net Inventory & Cumulative Flow Tracking

When bar charts depict rates of production (inflows) and sales/dispatches (outflows) over sequential intervals:

Closing Inventoryt=Opening Inventoryt+Manufacturedt−Soldt\text{Closing Inventory}_t = \text{Opening Inventory}_t + \text{Manufactured}_t - \text{Sold}_t

Over NN elapsed periods:

Closing InventoryN=Initial Inventory0+∑t=1NManufacturedt−∑t=1NSoldt\text{Closing Inventory}_N = \text{Initial Inventory}_0 + \sum_{t=1}^N \text{Manufactured}_t - \sum_{t=1}^N \text{Sold}_t

In extreme optimization problems (such as CAT solved examples), maximize or minimize net inventory by pairing maximum manufacturing with minimum sales, or vice-versa, subject to daily integer constraints.

D. Visual Ratio Comparison Shortcut

When comparing two ratios ab\frac{a}{b} and cd\frac{c}{d} from adjacent bars:

ab>cd  ⟺  a⋅d>b⋅c\frac{a}{b} > \frac{c}{d} \iff a \cdot d > b \cdot c

If both numerator and denominator increase from ab\frac{a}{b} to a+Δab+Δb\frac{a + \Delta a}{b + \Delta b}:

  • If ΔaΔb>ab\frac{\Delta a}{\Delta b} > \frac{a}{b}, the overall ratio increases.

  • If ΔaΔb<ab\frac{\Delta a}{\Delta b} < \frac{a}{b}, the overall ratio decreases.


3. Strategic Approaches for CAT & IPMAT

  1. Detect Truncated Axes Immediately: A bar spanning 110 to 120 looks twice as tall as one spanning 100 to 110 on a truncated axis starting at 100, yet the absolute difference is identical (+10). Never judge percentage growth by visual bar heights alone if the vertical axis does not start at 0.

  2. Tabulate Complex Visuals First: For multi-entity grouped bar charts or stacked charts with multiple categories, spending 60 seconds building a clean m×nm \times n matrix will prevent misreading values repeatedly across 4 questions.

  3. Check Units and Scale Multipliers: Confirm whether the y-axis reads in thousands ('000s), lakhs, crores, millions, or percentages.

  4. Leverage Integer Constraints: In puzzle-type DI sets (like multi-nominee elections, module installations, or discrete daily production), formulate Diophantine equations (a+2b+3c=Totala + 2b + 3c = \text{Total}) to establish upper and lower bounds for candidate values.

Formulas

Stacked Component Height Calculation

Valuek=yupper,k−ylower,k\text{Value}_k = y_{\text{upper}, k} - y_{\text{lower}, k}

Computes the true magnitude of an interior segment in a stacked bar chart by subtracting its lower boundary coordinate from its upper boundary coordinate.
Subdivided Percentage Breakdown

Absolute Value=Component Percentage100×Total Magnitude\text{Absolute Value} = \frac{\text{Component Percentage}}{100} \times \text{Total Magnitude}

Translates normalized percentage slices into absolute numbers. Always verify whether base sizes differ across bars.
Grouped Bar Proportional Share

ShareA(%)=VA∑kVk×100%\text{Share}_A (\%) = \frac{V_A}{\sum_{k} V_k} \times 100\%

Measures the proportional contribution of a specific entity within a multi-bar clustered category.
Net Inventory & Cumulative Flow Tracking

Closingt=Openingt+Inflowt−Outflowt\text{Closing}_t = \text{Opening}_t + \text{Inflow}_t - \text{Outflow}_t

Tracks cumulative accumulation over time where bars represent inflows (e.g. production) and outflows (e.g. sales).
Percentage Growth Rate Across True Baselines

Δ%=(Vfinal−VinitialVinitial)×100%\Delta\% = \left( \frac{V_{\text{final}} - V_{\text{initial}}}{V_{\text{initial}}} \right) \times 100\%

Measures rate of change. Truncated axes severely exaggerate visual bar height ratios relative to actual percentage growth.

Traps and tips

  • Trap: The Truncated Y-Axis Optical Illusion (Offset Baseline Distortion) — A bar spanning 110 to 120 appears twice as tall visually as one spanning 100 to 110 if the vertical axis is truncated at 100. However, the absolute change is identical (+10) and the actual growth is only 9.1%. Never evaluate percentage growth or ratios visually when the vertical axis does not originate at zero (00). Always read numeric values off the axis.
  • Trap: Stacked Component Baseline Shift Error — In a stacked (component) bar chart, the height of an upper segment is NOT the reading on the vertical axis. The vertical axis marks the cumulative total up to the top of that segment. You must subtract the coordinate of the bottom of the segment from the top coordinate to get its true value. If lower segments fluctuate, visual heights of upper segments will be visually displaced.
  • Trap: Discrepant Base Size Fallacy in 100% Subdivided Charts — A component occupying 30% of Bar A (with a total base of 10,000 units = 3,000 units) is larger than a component occupying 50% of Bar B (with a total base of 4,000 units = 2,000 units). Never compare absolute segment sizes across 100% normalized bars without multiplying each by its respective total base magnitude.
  • Tip: Cross-Multiplication for Visual Ratio Screening — When determining which clustered category has the greatest ratio VAVB\frac{V_A}{V_B}, first visually eliminate all categories where VA<VBV_A < V_B. For the remaining candidates, verify ab>cd\frac{a}{b} > \frac{c}{d} using rapid mental cross-multiplication a×d>b×ca \times d > b \times c rather than long division.
  • Tip: Formulating Integer Constraints in DI Puzzles — CAT bar graph sets often involve discrete units (e.g., consortium voting sheets, modular compute chassis, or daily production runs). Formulate integer linear equations (a+b+c=Na + b + c = N and a+2b+3c=Sa + 2b + 3c = S) to deduce strict minimum and maximum permissible bounds (c≤⌊(S−N)/2⌋c \le \lfloor (S - N)/2 \rfloor).

Solved examples

Solved Example Set 1: Questions 1 to 3

Directions for Examples 1 to 3

Four international autonomous robotics engineering teams – Team Apex, Team Falcon, Team Zephyr, and Team Orion – participated in a 4-stage autonomous quadruped robotic sprint relay over a closed 500-meter test circuit. Each team deployed four autonomous robotic runners (designated Stage 1, Stage 2, Stage 3, and Stage 4 robotic runners). In the relay, the first robot from each team starts running simultaneously from the origin line. As soon as the first robot from any team completes the 500-meter closed circuit, the second robot from that team starts running from the origin line, and this handoff process continues sequentially until the fourth robot has completed its lap. The same relay protocol applies to all teams. The winning team is the one whose robots take the least total composite time to complete the four laps combined.

The following bar graph provides information about the average speeds (in m/s) at which the four robotic runners from each team ran to complete their respective 500-meter laps:

Autonomous Quadcopter Relay Sprint Stage Speeds

Team / ConsortiumStage 1 Speed (m/s)Stage 2 Speed (m/s)Stage 3 Speed (m/s)Stage 4 Speed (m/s)
Team Apex10201225
Team Falcon12161020
Team Zephyr15251210
Team Orion12201516

Question 1

Which team won the autonomous relay event?

(1) Team Orion

(2) Team Apex

(3) Team Zephyr

(4) Team Falcon

Question 2

What was the shortest distance between the starting origin line and the point on the track at which the second robotic runner from Team Apex and Team Falcon met?

(1) 133.33 metres

(2) 200.00 metres

(3) 333.33 metres

(4) The second robotic runners from Apex and Falcon did not meet

Question 3

Which of the following statements is definitely true?

(1) A robotic runner from Falcon was never behind the corresponding numbered runner from Apex.

(2) The third robotic runner from Zephyr and Falcon never met during the course of the event.

(3) The second robotic runner from Falcon and Zephyr definitely met once during the event.

(4) A robotic runner from Falcon was always behind the corresponding numbered runner from Zephyr.

Show solution

Step-by-Step Solution & Deductions

Each robotic runner completes 1 lap of 500 metres500\text{ metres}. The time taken by a runner moving at uniform speed v m/sv\text{ m/s} is:

t=500v secondst = \frac{500}{v}\text{ seconds}

The total composite time taken by a team across all 4 stages is:

T=500×(1v1+1v2+1v3+1v4)T = 500 \times \left(\frac{1}{v_1} + \frac{1}{v_2} + \frac{1}{v_3} + \frac{1}{v_4}\right)

Reading the speeds of the four runners from the bar graph:

  • Team Apex: v1=10 m/s,v2=20 m/s,v3=12 m/s,v4=25 m/sv_1 = 10\text{ m/s}, v_2 = 20\text{ m/s}, v_3 = 12\text{ m/s}, v_4 = 25\text{ m/s}

  • Team Falcon: v1=12 m/s,v2=16 m/s,v3=10 m/s,v4=20 m/sv_1 = 12\text{ m/s}, v_2 = 16\text{ m/s}, v_3 = 10\text{ m/s}, v_4 = 20\text{ m/s}

  • Team Zephyr: v1=15 m/s,v2=25 m/s,v3=12 m/s,v4=10 m/sv_1 = 15\text{ m/s}, v_2 = 25\text{ m/s}, v_3 = 12\text{ m/s}, v_4 = 10\text{ m/s}

  • Team Orion: v1=12 m/s,v2=20 m/s,v3=15 m/s,v4=16 m/sv_1 = 12\text{ m/s}, v_2 = 20\text{ m/s}, v_3 = 15\text{ m/s}, v_4 = 16\text{ m/s}


Question 1 Solution:

Calculate the composite time taken by each team:

  • Team Apex:

    TApex=50010+50020+50012+50025=50+25+41.67+20=136.67 secondsT_{\text{Apex}} = \frac{500}{10} + \frac{500}{20} + \frac{500}{12} + \frac{500}{25} = 50 + 25 + 41.67 + 20 = 136.67\text{ seconds}

  • Team Falcon:

    TFalcon=50012+50016+50010+50020=41.67+31.25+50+25=147.92 secondsT_{\text{Falcon}} = \frac{500}{12} + \frac{500}{16} + \frac{500}{10} + \frac{500}{20} = 41.67 + 31.25 + 50 + 25 = 147.92\text{ seconds}

  • Team Zephyr:

    TZephyr=50015+50025+50012+50010=33.33+20+41.67+50=145.00 secondsT_{\text{Zephyr}} = \frac{500}{15} + \frac{500}{25} + \frac{500}{12} + \frac{500}{10} = 33.33 + 20 + 41.67 + 50 = 145.00\text{ seconds}

  • Team Orion:

    TOrion=50012+50020+50015+50016=41.67+25+33.33+31.25=131.25 secondsT_{\text{Orion}} = \frac{500}{12} + \frac{500}{20} + \frac{500}{15} + \frac{500}{16} = 41.67 + 25 + 33.33 + 31.25 = 131.25\text{ seconds}

Since Team Orion takes the least composite time (131.25 seconds131.25\text{ seconds}), Team Orion won the event.

Correct Answer: Option (1)


Question 2 Solution:

Analyze the lap transition between the first and second runners of Team Apex and Team Falcon:

  1. First Runner Stage:

    • Falcon Runner 1 finishes 500 m at: tFalcon,1=50012=1253≈41.67 secondst_{\text{Falcon}, 1} = \frac{500}{12} = \frac{125}{3} \approx 41.67\text{ seconds}.

    • Apex Runner 1 finishes 500 m at: tApex,1=50010=50 secondst_{\text{Apex}, 1} = \frac{500}{10} = 50\text{ seconds}.

  2. Second Runner Stage:

    • Falcon Runner 2 starts running at t=1253 st = \frac{125}{3}\text{ s} with speed 16 m/s16\text{ m/s}.

    • Apex Runner 2 starts running at t=50 st = 50\text{ s} with speed 20 m/s20\text{ m/s}.

  3. When Apex Runner 2 starts at t=50 st = 50\text{ s}, Falcon Runner 2 has already been running for:

    Δt=50−1253=253 seconds\Delta t = 50 - \frac{125}{3} = \frac{25}{3}\text{ seconds}

    Distance covered by Falcon Runner 2 in this time (head start):

    Head start=253×16=4003≈133.33 metres\text{Head start} = \frac{25}{3} \times 16 = \frac{400}{3} \approx 133.33\text{ metres}

  4. To overtake Falcon Runner 2, Apex Runner 2 has relative speed:

    vrel=20−16=4 m/sv_{\text{rel}} = 20 - 16 = 4\text{ m/s}

    Time needed to close the gap:

    tcatch=400/34=1003≈33.33 secondst_{\text{catch}} = \frac{400/3}{4} = \frac{100}{3} \approx 33.33\text{ seconds}

  5. Distance Apex Runner 2 would need to run from the starting line to catch Falcon Runner 2:

    D=20×1003=20003≈666.67 metresD = 20 \times \frac{100}{3} = \frac{2000}{3} \approx 666.67\text{ metres}

  6. Since each runner runs only 1 lap of 500 metres1\text{ lap of } 500\text{ metres}, Apex Runner 2 finishes his lap at 500 metres500\text{ metres} before ever catching Falcon Runner 2.

    Therefore, the second runners from Team Apex and Team Falcon did not meet.

Correct Answer: Option (4)


Question 3 Solution:

Evaluate Statement (2): Consider the Third Runners from Zephyr and Falcon:

  1. Team Zephyr:

    • Runner 1 finishes at: 50015=1003≈33.33 s\frac{500}{15} = \frac{100}{3} \approx 33.33\text{ s}.

    • Runner 2 runs at 25 m/s25\text{ m/s}, taking 50025=20 s\frac{500}{25} = 20\text{ s}.

    • Cumulative time when Zephyr Runner 3 starts: 1003+20=1603≈53.33 s\frac{100}{3} + 20 = \frac{160}{3} \approx 53.33\text{ s}.

    • Zephyr Runner 3 runs at 12 m/s12\text{ m/s} and finishes at: 1603+50012=1603+1253=2853=95.00 s\frac{160}{3} + \frac{500}{12} = \frac{160}{3} + \frac{125}{3} = \frac{285}{3} = 95.00\text{ s}.

  2. Team Falcon:

    • Runner 1 finishes at: 50012≈41.67 s\frac{500}{12} \approx 41.67\text{ s}.

    • Runner 2 runs at 16 m/s16\text{ m/s}, taking 50016=31.25 s\frac{500}{16} = 31.25\text{ s}.

    • Cumulative time when Falcon Runner 3 starts: 41.67+31.25=72.92 s41.67 + 31.25 = 72.92\text{ s}.

  3. Notice:

    • Zephyr Runner 3 starts at t=53.33 st = 53.33\text{ s}, whereas Falcon Runner 3 does not start until t=72.92 st = 72.92\text{ s}.

    • Moreover, Zephyr Runner 3 has speed 12 m/s12\text{ m/s} whereas Falcon Runner 3 has speed 10 m/s10\text{ m/s} (slower).

    • When Zephyr Runner 3 finishes at t=95.00 st = 95.00\text{ s}, Falcon Runner 3 has only covered (95−72.92)×10=220.8 m(95 - 72.92) \times 10 = 220.8\text{ m}.

    • Because Zephyr Runner 3 started earlier and ran faster throughout, Falcon Runner 3 was always behind. They never met.

    • Thus, Statement (2) is definitely true.

Correct Answer: Option (2)

Takeaway: In multi-stage speed relay problems, calculate cumulative handoff timestamps sequentially. Relative motion pursuit equations ( d = v rel t ) must always be constrained by the lap length boundary.

Solved Example Set 2: Questions 4 to 6

Directions for Examples 4 to 6

In an annual governance election for the Lead Architecture Steering Chair of an Open Cloud Infrastructure Consortium, 10 technology platform modules / delegates—namely P, Q, R, S, T, U, V, W, X, and Y—were nominated. The consortium comprises a total of 250 voting member enterprise organizations. Each enterprise voter submitted a priority ballot indicating their preferred nominees. Each voting enterprise was permitted to endorse a maximum of three different candidates on a priority basis: the first candidate as their first choice, the second candidate as their second choice, and the third candidate as their third choice. Every voter was mandated to endorse at least one candidate on the ballot.

The following bar graph represents the total number of times the name of each of the 10 nominated platform candidates appeared across all submitted voting ballots:

Consortium Steering Election - Candidate Endorsement Frequency

CandidatePQRSTUVWXYTotal
Endorsements48363245255635527132432

Question 4

How many of the following are not possible values of the number of enterprise voters who endorsed exactly one nominee on their ballot?

A. 64

B. 67

C. 162

D. 145

E. 165

F. 159

(1) 1

(2) 2

(3) 3

(4) 4

Question 5

What was the minimum possible number of enterprise voters who endorsed at least two nominees on their ballot?

(1) 90

(2) 91

(3) 92

(4) 93

Question 6

What could be the maximum value of the sum of the number of enterprise voters who endorsed exactly one nominee and that of those who endorsed exactly three nominees?

(1) 250

(2) 249

(3) 159

(4) 182

Show solution

Step-by-Step Solution & Deductions

1. Aggregate Data Extraction

From the bar graph, the number of endorsements received by each candidate is:

  • P=48,Q=36,R=32,S=45,T=25P = 48, Q = 36, R = 32, S = 45, T = 25

  • U=56,V=35,W=52,X=71,Y=32U = 56, V = 35, W = 52, X = 71, Y = 32

Total number of endorsements written across all sheets:

Total Endorsements=48+36+32+45+25+56+35+52+71+32=432\text{Total Endorsements} = 48 + 36 + 32 + 45 + 25 + 56 + 35 + 52 + 71 + 32 = 432


2. Algebraic Formulation

Let:

  • a=number of voters who endorsed exactly 1 candidatea = \text{number of voters who endorsed exactly 1 candidate}

  • b=number of voters who endorsed exactly 2 candidatesb = \text{number of voters who endorsed exactly 2 candidates}

  • c=number of voters who endorsed exactly 3 candidatesc = \text{number of voters who endorsed exactly 3 candidates}

Since every voter endorsed at least 1 and at most 3 candidates:

a+b+c=250— (Equation 1)a + b + c = 250 \quad \text{--- (Equation 1)}

Each ballot endorsing 1 candidate contributes 1 endorsement; 2 candidates contributes 2; 3 candidates contributes 3:

a+2b+3c=432— (Equation 2)a + 2b + 3c = 432 \quad \text{--- (Equation 2)}

Subtracting Equation 1 from Equation 2:

(a+2b+3c)−(a+b+c)=432−250(a + 2b + 3c) - (a + b + c) = 432 - 250

b+2c=182  ⟹  b=182−2c— (Equation 3)b + 2c = 182 \implies b = 182 - 2c \quad \text{--- (Equation 3)}

Expressing aa in terms of cc:

a=250−(b+c)=250−(182−2c+c)=250−182+c=68+c— (Equation 4)a = 250 - (b + c) = 250 - (182 - 2c + c) = 250 - 182 + c = 68 + c \quad \text{--- (Equation 4)}


3. Permissible Ranges

Since b≥0b \ge 0:

182−2c≥0  ⟹  2c≤182  ⟹  c≤91182 - 2c \ge 0 \implies 2c \le 182 \implies c \le 91

Because cc must be an integer:

c∈{0,1,2,3,…,91}c \in \{0, 1, 2, 3, \dots, 91\}

Consequently:

  • For c=0c = 0: b=182b = 182, a=68+0=68a = 68 + 0 = 68.

  • For c=91c = 91: b=182−2(91)=0b = 182 - 2(91) = 0, a=68+91=159a = 68 + 91 = 159.

  • Range of aa: 68≤a≤15968 \le a \le 159 (any integer from 68 to 159).

  • Range of bb: 0≤b≤1820 \le b \le 182 (even integers only).

  • Range of cc: 0≤c≤910 \le c \le 91.


Question 4 Solution:

Check each given value against the permissible range for aa (68≤a≤15968 \le a \le 159):

  • A. 64: Outside range (<68< 68)   ⟹  \implies Not possible.

  • B. 67: Outside range (<68< 68)   ⟹  \implies Not possible.

  • C. 162: Outside range (>159> 159)   ⟹  \implies Not possible.

  • D. 145: Inside range (68≤145≤15968 \le 145 \le 159)   ⟹  \implies Possible.

  • E. 165: Outside range (>159> 159)   ⟹  \implies Not possible.

  • F. 159: Inside range (68≤159≤15968 \le 159 \le 159)   ⟹  \implies Possible.

The values that are not possible are 64, 67, 162, and 165, which gives a total of 4 values.

Correct Answer: Option (4)


Question 5 Solution:

Number of voters who endorsed at least two candidates =b+c= b + c.

From Equation 1:

b+c=250−ab + c = 250 - a

To minimize (b+c)(b + c), we must maximize aa.

Maximum value of a=159a = 159.

Minimum (b+c)=250−159=91\text{Minimum } (b + c) = 250 - 159 = 91

(Alternatively: b+c=(182−2c)+c=182−cb + c = (182 - 2c) + c = 182 - c. To minimize this, maximize c=91  ⟹  182−91=91c = 91 \implies 182 - 91 = 91.)

Correct Answer: Option (2)


Question 6 Solution:

We need the maximum value of the sum (a+c)(a + c).

From Equation 1:

a+b+c=250  ⟹  a+c=250−ba + b + c = 250 \implies a + c = 250 - b

To maximize (a+c)(a + c), we must minimize bb.

The minimum possible value of bb is 00 (occurring when c=91c = 91).

Maximum (a+c)=250−0=250\text{Maximum } (a + c) = 250 - 0 = 250

(Alternatively: maximum a=159a = 159 and maximum c=91  ⟹  159+91=250c = 91 \implies 159 + 91 = 250.)

Correct Answer: Option (1)

Takeaway: When dealing with multi-selection survey or voting data, setting up linear Diophantine equations allows you to parameterize all sub-groups in terms of a single variable and establish sharp minimum and maximum boundary values.

Solved Example Set 3: Questions 7 to 10

Directions for Examples 7 to 10

The following bar graph provides information about the number of certification examination vouchers (in thousands, '000s) purchased for four specialized enterprise cloud & AI credentials—PCA (Professional Cloud Architect), CKA (Certified Kubernetes Administrator), MLD (Machine Learning DevOps), and SEC (Cloud Security Specialist)—across 5 regional enterprise tech hubs in India (NCR, Pune, Hyderabad, Bengaluru, and Chennai) in August 2017.

The official voucher fee per candidate for PCA, CKA, MLD, and SEC was ₹1,500, ₹1,200, ₹800, and ₹1,400 respectively. Assume that these are the only five regions where vouchers for the aforementioned credentials were purchased, and no other certification vouchers except the four specified credentials were sold in the given regions.

Enterprise Cloud & AI Certification Vouchers Sold (in '000s)

Regional Tech HubPCA (₹1,500)CKA (₹1,200)MLD (₹800)SEC (₹1,400)Hub Total
NCR8.05.09.05.027.0
Pune2.02.010.06.020.0
Hyderabad4.53.012.04.524.0
Bengaluru5.52.58.02.518.5
Chennai6.02.56.04.018.5
Total Vouchers26.015.045.022.0108.0

Question 7

In August 2017, for which credential was the voucher revenue generated through sales in Hyderabad the second lowest as a percentage of that credential's total nationwide voucher revenue?

(1) PCA

(2) CKA

(3) SEC

(4) MLD

Question 8

If the number of vouchers sold for CKA in August 2018 increased by 20% compared to that in August 2017 and the total revenue generated through the sales of vouchers for the four certifications put together in August 2018 increased by 10% compared to that in August 2017, then what was the approximate percentage change in the fee of a CKA voucher in August 2018 over that in August 2017? (Assume that the fee and the number of vouchers sold for certifications other than CKA remained unchanged in August 2018.)

(1) 41%

(2) 35%

(3) 48%

(4) 52%

Question 9

In August 2017, the percentage contribution of NCR to the total voucher revenue generated through the sales of vouchers of the four certifications put together was closest to:

(1) 22%

(2) 26%

(3) 30%

(4) 34%

Question 10

In August 2017, in which regional tech hub(s) was the number of MLD vouchers sold less than 30% of the total number of vouchers sold for the four certifications put together in that particular hub?

(1) Chennai and Bengaluru

(2) Only NCR

(3) NCR and Chennai

(4) None of these

Show solution

Step-by-Step Solution & Deductions

1. Data Matrix (Number of Vouchers in '000s)

Extracting the values from the clustered bar chart:

Regional Tech HubPCA (₹1,500)CKA (₹1,200)MLD (₹800)SEC (₹1,400)Hub Total
NCR8.05.09.05.027.0
Pune2.02.010.06.020.0
Hyderabad4.53.012.04.524.0
Bengaluru5.52.58.02.518.5
Chennai6.02.56.04.018.5
Total Vouchers26.015.045.022.0108.0

2. All-India Revenue in August 2017

Revenue=∑(Vouchers in ’000s×Fee)\text{Revenue} = \sum (\text{Vouchers in '000s} \times \text{Fee})

  • PCA Revenue=26.0×1500=₹39,000 thousand\text{PCA Revenue} = 26.0 \times 1500 = \text{₹}39,000\text{ thousand}

  • CKA Revenue=15.0×1200=₹18,000 thousand\text{CKA Revenue} = 15.0 \times 1200 = \text{₹}18,000\text{ thousand}

  • MLD Revenue=45.0×800=₹36,000 thousand\text{MLD Revenue} = 45.0 \times 800 = \text{₹}36,000\text{ thousand}

  • SEC Revenue=22.0×1400=₹30,800 thousand\text{SEC Revenue} = 22.0 \times 1400 = \text{₹}30,800\text{ thousand}

  • Total Revenue (August 2017):

    Total=39000+18000+36000+30800=₹123,800 thousand=₹123.8 crore\text{Total} = 39000 + 18000 + 36000 + 30800 = \text{₹}123,800\text{ thousand} = \text{₹}123.8\text{ crore}


Question 7 Solution:

The percentage contribution of Hyderabad to the revenue generated by the sale of each credential:

(Note: Because the fee is uniform across all regions, the revenue contribution percentage is simply the ratio of vouchers sold in Hyderabad to total vouchers sold for that credential nationwide.)

  • PCA: 4.526.0×100≈17.31%\frac{4.5}{26.0} \times 100 \approx 17.31\%

  • CKA: 3.015.0×100=20.00%\frac{3.0}{15.0} \times 100 = 20.00\%

  • SEC: 4.522.0×100≈20.45%\frac{4.5}{22.0} \times 100 \approx 20.45\%

  • MLD: 12.045.0×100≈26.67%\frac{12.0}{45.0} \times 100 \approx 26.67\%

Arranging the credentials in ascending order of percentage contribution:

PCA (17.31%)<CKA (20.00%)<SEC (20.45%)<MLD (26.67%)\text{PCA } (17.31\%) < \text{CKA } (20.00\%) < \text{SEC } (20.45\%) < \text{MLD } (26.67\%)

The credential with the second lowest contribution is CKA (20.00%20.00\%).

Correct Answer: Option (2)


Question 8 Solution:

  1. Total Revenue in August 2018:

    Total Revenue2018=1.10×123,800=₹136,180 thousand\text{Total Revenue}_{2018} = 1.10 \times 123,800 = \text{₹}136,180\text{ thousand}

  2. Increase in Total Revenue:

    ΔRevenue=136,180−123,800=₹12,380 thousand\Delta \text{Revenue} = 136,180 - 123,800 = \text{₹}12,380\text{ thousand}

  3. Since sales volume and voucher fees of PCA, MLD, and SEC remained unchanged, the entire ₹12,380 thousand increase came from CKA:

    Revenue from CKA in 2018=18,000+12,380=₹30,380 thousand\text{Revenue from CKA in 2018} = 18,000 + 12,380 = \text{₹}30,380\text{ thousand}

  4. Number of CKA vouchers sold in August 2018:

    Vouchers2018=1.20×15.0 thousand=18.0 thousand=18,000 vouchers\text{Vouchers}_{2018} = 1.20 \times 15.0\text{ thousand} = 18.0\text{ thousand} = 18,000\text{ vouchers}

  5. New Fee per CKA voucher in 2018:

    Fee2018=30,380,00018,000≈₹1,687.78\text{Fee}_{2018} = \frac{30,380,000}{18,000} \approx \text{₹}1,687.78

  6. Percentage Change in Fee:

    Percentage Change=1687.78−12001200×100=487.781200×100≈40.65%≈41%\text{Percentage Change} = \frac{1687.78 - 1200}{1200} \times 100 = \frac{487.78}{1200} \times 100 \approx 40.65\% \approx 41\%

Correct Answer: Option (1)


Question 9 Solution:

Calculate NCR's revenue contribution in August 2017:

NCR Revenue=(8.0×1500)+(5.0×1200)+(9.0×800)+(5.0×1400)\text{NCR Revenue} = (8.0 \times 1500) + (5.0 \times 1200) + (9.0 \times 800) + (5.0 \times 1400)

NCR Revenue=12000+6000+7200+7000=₹32,200 thousand\text{NCR Revenue} = 12000 + 6000 + 7200 + 7000 = \text{₹}32,200\text{ thousand}

Percentage of all-India revenue:

Percentage=32,200123,800×100≈26.01%≈26%\text{Percentage} = \frac{32,200}{123,800} \times 100 \approx 26.01\% \approx 26\%

Correct Answer: Option (2)


Question 10 Solution:

Evaluate the percentage of MLD vouchers sold in each regional hub:

  • NCR: 9.027.0×100≈33.33%>30%\frac{9.0}{27.0} \times 100 \approx 33.33\% > 30\%

  • Pune: 10.020.0×100=50.00%>30%\frac{10.0}{20.0} \times 100 = 50.00\% > 30\%

  • Hyderabad: 12.024.0×100=50.00%>30%\frac{12.0}{24.0} \times 100 = 50.00\% > 30\%

  • Bengaluru: 8.018.5×100≈43.24%>30%\frac{8.0}{18.5} \times 100 \approx 43.24\% > 30\%

  • Chennai: 6.018.5×100≈32.43%>30%\frac{6.0}{18.5} \times 100 \approx 32.43\% > 30\%

In every single regional hub, the proportion of MLD vouchers sold strictly exceeds 30%30\%. There is no state/hub where it was less than 30%30\%.

Correct Answer: Option (4) (None of these)

Takeaway: When unit prices are identical across geographical regions, the regional share of revenue for any single product is identical to its regional share of volume. For overall revenue changes driven by a single product, attribute the entire dollar increment directly to that product.

Solved Example Set 4: Questions 11 to 14

Directions for Examples 11 to 14

An advanced quantum-accelerated supercomputing laboratory operates ten modular server chassis, designated C1,C2,C3,…,C10C_1, C_2, C_3, \dots, C_{10}. Each chassis is housed in one of four specialized rack enclosure types identified by status indicator colors: Obsidian, Platinum, Amber, and Sapphire. The number of high-coherence cryogenic QPU (Quantum Processing Unit) core modules installed in each of the ten chassis is one of five discrete capacity values: 16, 20, 28, 36, or 44 QPU modules.

The following bar graphs provide information about the number of server chassis of each enclosure color and the cumulative frequency distribution of QPU module capacities across the facility. Crucially, no two server chassis of the same enclosure color contain an equal number of QPU core modules.

Quantum Chassis by Enclosure Color and QPU Core Distribution


Question 11

What is the total number of QPU core modules installed across all the server chassis housed in Obsidian enclosures?

(1) 144

(2) 136

(3) 140

(4) 148

Question 12

The total number of QPU core modules across all the ten server chassis put together in the laboratory is at most:

(1) 288

(2) 296

(3) 300

(4) 308

Question 13

If the number of QPU core modules in the server chassis housed in the Sapphire enclosure is 44, which of the following can be the total number of QPU modules across all chassis housed in Platinum enclosures?

(1) 60

(2) 52

(3) 64

(4) Both (a) and (b)

Question 14

If the total number of QPU core modules in the server chassis housed in Amber enclosures is the maximum possible, and the total number of QPU modules across all ten chassis combined is the least possible, what is the number of QPU core modules in the server chassis housed in the Sapphire enclosure?

(1) 36

(2) 44

(3) 20

(4) 16

Show solution

Step-by-Step Solution & Deductions

1. Information from Chart 1 (Server Chassis by Enclosure Color)

  • Obsidian: 5 chassis

  • Platinum: 2 chassis

  • Amber: 2 chassis

  • Sapphire: 1 chassis

  • Total server chassis =5+2+2+1=10= 5 + 2 + 2 + 1 = 10.

Rule: No two chassis of the same enclosure color contain an equal number of QPU modules.

Because there are 5 possible module capacities {16,20,28,36,44}\{16, 20, 28, 36, 44\} and exactly 5 Obsidian chassis, the 5 Obsidian chassis must contain each of the 5 capacity values exactly once:

QPU Modules in Obsidian Chassis={16,20,28,36,44}\text{QPU Modules in Obsidian Chassis} = \{16, 20, 28, 36, 44\}


2. Deductions from Chart 2 (Cumulative Capacity Distribution)

Let N(k)N(k) be the number of chassis containing kk QPU modules:

  • At least 16 modules: N(16)+N(20)+N(28)+N(36)+N(44)=10N(16) + N(20) + N(28) + N(36) + N(44) = 10

  • At most 20 modules: N(16)+N(20)=4N(16) + N(20) = 4

  • At least 28 modules: N(28)+N(36)+N(44)=6N(28) + N(36) + N(44) = 6 (consistent since 10−4=610 - 4 = 6)

  • At least 36 modules: N(36)+N(44)=5N(36) + N(44) = 5

    • From N(28)+[N(36)+N(44)]=6  ⟹  N(28)+5=6  ⟹  N(28)=1N(28) + [N(36) + N(44)] = 6 \implies N(28) + 5 = 6 \implies N(28) = 1.
  • At most 36 modules: N(16)+N(20)+N(28)+N(36)=8N(16) + N(20) + N(28) + N(36) = 8

    • Since total is 10, the remaining chassis have >36> 36 modules (i.e. exactly 44):

      N(44)=10−8=2N(44) = 10 - 8 = 2

    • Then from N(36)+N(44)=5N(36) + N(44) = 5:

      N(36)=5−2=3N(36) = 5 - 2 = 3

    • From N(16)+N(20)=4N(16) + N(20) = 4:

      Since Obsidian already has one 16 and one 20, N(16)≥1N(16) \ge 1 and N(20)≥1N(20) \ge 1.

      Thus, N(16)∈{1,2,3}N(16) \in \{1, 2, 3\} and N(20)=4−N(16)∈{3,2,1}N(20) = 4 - N(16) \in \{3, 2, 1\}.

QPU Module CapacityNumber of Chassis
161 - 3
201 - 3
281
363
442

Question 11 Solution:

The 5 Obsidian chassis contain 16, 20, 28, 36, and 44 QPU modules:

Total QPU Modules in Obsidian Chassis=16+20+28+36+44=144\text{Total QPU Modules in Obsidian Chassis} = 16 + 20 + 28 + 36 + 44 = 144

Correct Answer: Option (1)


Question 12 Solution:

To maximize the total QPU modules across all 10 chassis, maximize the number of chassis having 20 modules rather than 16 modules:

Since N(16)+N(20)=4N(16) + N(20) = 4 and N(16)≥1N(16) \ge 1, the maximum value for N(20)N(20) is 33, leaving N(16)=1N(16) = 1.

Max Total QPU Modules=(1×16)+(3×20)+(1×28)+(3×36)+(2×44)\text{Max Total QPU Modules} = (1 \times 16) + (3 \times 20) + (1 \times 28) + (3 \times 36) + (2 \times 44)

Max Total QPU Modules=16+60+28+108+88=300\text{Max Total QPU Modules} = 16 + 60 + 28 + 108 + 88 = 300

Correct Answer: Option (3)


Question 13 Solution:

  • Total chassis with 44 modules =2= 2. One is Obsidian; if the Sapphire chassis has 44 modules, then neither of the 2 Platinum chassis can have 44 modules.

  • Total chassis with 28 modules =1= 1, which is already Obsidian. Thus neither Platinum chassis can have 28 modules.

  • Therefore, the 2 Platinum chassis must take distinct module counts from the remaining available set: {16,20,36}\{16, 20, 36\}.

  • Possible combinations for the 2 Platinum chassis:

    • {16,20}  ⟹  Total=36\{16, 20\} \implies \text{Total} = 36

    • {16,36}  ⟹  Total=52\{16, 36\} \implies \text{Total} = 52

    • {20,36}  ⟹  Total=56\{20, 36\} \implies \text{Total} = 56

  • Comparing with the given options (60, 52, 64), only 52 is possible.

Correct Answer: Option (2)


Question 14 Solution:

  1. Amber chassis maximized: Amber has 2 chassis with distinct capacities. To maximize their sum, Amber must take the two largest possible denominations: 44 and 36 (since N(44)=2N(44)=2 with one Obsidian, one can be Amber; N(36)=3N(36)=3 with one Obsidian, one can be Amber).

    Amber capacities={36,44}\text{Amber capacities} = \{36, 44\}

  2. Total modules least: To minimize total modules, we minimize N(20)N(20) and maximize N(16)N(16):

    N(16)=3andN(20)=1N(16) = 3 \quad \text{and} \quad N(20) = 1

    Total inventory across all 10 chassis: three 16s, one 20, one 28, three 36s, two 44s.

  3. Accounting for Obsidian and Amber:

    • Obsidian has: {16,20,28,36,44}\{16, 20, 28, 36, 44\}

    • Amber has: {36,44}\{36, 44\}

    • Remaining modules for the 1 Sapphire and 2 Platinum chassis: two 16s and one 36.

  4. The 2 Platinum chassis must have distinct module counts, so they cannot both have 16. Hence Platinum must take {16,36}\{16, 36\}.

  5. This leaves the remaining 16 for the Sapphire chassis.

    Therefore, the Sapphire chassis must contain 16 QPU modules.

Correct Answer: Option (4)

Takeaway: When category counts match the number of possible values under a uniqueness constraint, the entire set of values is assigned deterministically. Use cumulative frequency inequalities to isolate frequencies of intermediate values.

Solved Example Set 5: Questions 15 to 18

Directions for Examples 15 to 18

An advanced clean-energy technology company, AetherVolt Energy Systems, manufactures three specialized solid-state battery cell chemistries: Chemistry Alpha, Chemistry Beta, and Chemistry Gamma. On any given operational production day during the first three months of 2017, the production batch volume for each variety manufactured was either 3, 6, or 7 Megawatt-hour (MWh) modular container units. Similarly, the commercial dispatch volume to the regional power grid on any day for each variety was either 1, 3, or 4 MWh container units.

On any single day, the manufacturing volumes across the three battery chemistries were mutually distinct (taking values 3, 6, and 7 in some permutation), and the dispatch volumes were also mutually distinct (taking values 1, 3, and 4 in some permutation).

The following bar graph provides information about the cumulative count of undistributed (unsold) MWh battery units of Alpha, Beta, and Gamma stored at the central distribution yard at the end of each of the first three months of 2017. Assume each month has exactly 30 operational days and there were zero unsold units at the end of 2016.

Undistributed Solid-State Battery Units at End of Jan, Feb, Mar 2017

MonthChemistry AlphaChemistry BetaChemistry GammaTotal Undistributed Units
End of January628890240
End of February152168160480
End of March225245250720

Question 15

If the maximum possible number of MWh units of Chemistry Gamma were manufactured in January, then find the least possible number of days on which 6 MWh units of Chemistry Beta were manufactured in January.

(1) 6

(2) 8

(3) 10

(4) 12

Question 16

Find the maximum possible number of days on which 7 MWh units of Chemistry Gamma were manufactured over the period of three months.

(1) 80

(2) 82

(3) 84

(4) 85

Question 17

Find the minimum possible number of days on which 7 MWh units of Chemistry Alpha were manufactured over the period of three months.

(1) 0

(2) 15

(3) 12

(4) 10

Question 18

If the ratio of the number of days on which 3, 6, and 7 MWh units of Chemistry Beta were manufactured in February was 1 : 2 : 3, and the number of days on which 4 MWh units of Chemistry Beta were dispatched in February was the minimum possible, then find the number of days on which 3 MWh units of Chemistry Beta were dispatched in February.

(1) 22

(2) 20

(3) 18

(4) 16

Show solution

Step-by-Step Solution & Deductions

1. Core Mathematical Constraints

  • 3 battery chemistries: Alpha,Beta,Gamma\text{Alpha}, \text{Beta}, \text{Gamma}.

  • Daily manufacturing: Each chemistry receives a mutually distinct batch volume from {3,6,7}\{3, 6, 7\}.

    Daily Total Manufactured=3+6+7=16 MWh units\text{Daily Total Manufactured} = 3 + 6 + 7 = 16\text{ MWh units}

  • Daily dispatches: Each chemistry receives a mutually distinct dispatch volume from {1,3,4}\{1, 3, 4\}.

    Daily Total Dispatched=1+3+4=8 MWh units\text{Daily Total Dispatched} = 1 + 3 + 4 = 8\text{ MWh units}

  • Daily net addition to undistributed inventory across all 3 chemistries:

    ΔUndistributed per day=16−8=8 MWh units\Delta \text{Undistributed per day} = 16 - 8 = 8\text{ MWh units}

  • Over a 30-day month, the cumulative net addition across all chemistries combined is:

    30×8=240 units per month30 \times 8 = 240\text{ units per month}

    • End of January: 62+88+90=24062 + 88 + 90 = 240

    • End of February: 152+168+160=480152 + 168 + 160 = 480 (240+240240 + 240)

    • End of March: 225+245+250=720225 + 245 + 250 = 720 (480+240480 + 240)


Question 15 Solution:

  1. Undistributed Chemistry Gamma at end of January = 90:

    Manufactured(Gamma)−Dispatched(Gamma)=90\text{Manufactured}(\text{Gamma}) - \text{Dispatched}(\text{Gamma}) = 90

    To maximize Manufactured(Gamma)\text{Manufactured}(\text{Gamma}), we must maximize Dispatched(Gamma)\text{Dispatched}(\text{Gamma}).

    Maximum units of Gamma that can be dispatched in 30 days =30×4=120= 30 \times 4 = 120.

    Then Manufactured(Gamma)=90+120=210\text{Manufactured}(\text{Gamma}) = 90 + 120 = 210, which means Gamma was manufactured 7 units and dispatched 4 units on all 30 days of January.

  2. Impact on Chemistry Beta:

    Because daily quantities manufactured are distinct across varieties, if Gamma had 7 units manufactured every day, Beta could never have 7 units manufactured in January. Thus Beta was manufactured either 6 or 3 units each day.

    Similarly, Beta could never have 4 units dispatched in January. Thus Beta was dispatched either 1 or 3 units each day.

  3. Let xx be the days on which 6 units of Beta were manufactured (so 3 units on 30−x30 - x days).

    Let yy be the days on which 1 unit of Beta was dispatched (so 3 units on 30−y30 - y days).

    Undistributed Beta=[6x+3(30−x)]−[1y+3(30−y)]=88\text{Undistributed Beta} = [6x + 3(30 - x)] - [1y + 3(30 - y)] = 88

    (3x+90)−(90−2y)=88  ⟹  3x+2y=88  ⟹  3x=88−2y(3x + 90) - (90 - 2y) = 88 \implies 3x + 2y = 88 \implies 3x = 88 - 2y

  4. To minimize xx, maximize y≤30y \le 30:

    • If y=30y = 30: 3x=283x = 28 (not an integer).

    • If y=29y = 29: 3x=88−58=30  ⟹  x=103x = 88 - 58 = 30 \implies x = 10.

    Therefore, the least possible number of days on which 6 units of Beta were manufactured is 10.

Correct Answer: Option (3)


Question 16 Solution:

Examine each month independently to maximize days Chemistry Gamma was manufactured 7 units:

  • January:

    ΔUndistributed(Gamma)=90\Delta \text{Undistributed}(\text{Gamma}) = 90. As deduced in Q15, Gamma can be manufactured 7 units and dispatched 4 units on all 30 days.

  • February:

    ΔUndistributed(Gamma)=160−90=70\Delta \text{Undistributed}(\text{Gamma}) = 160 - 90 = 70.

    Manufactured(Gamma)−Dispatched(Gamma)=70\text{Manufactured}(\text{Gamma}) - \text{Dispatched}(\text{Gamma}) = 70.

    To maximize days of 7 units, maximize total manufacturing by maximizing dispatches:

    Max dispatches in Feb =30×4=120  ⟹  Total Manufactured=70+120=190= 30 \times 4 = 120 \implies \text{Total Manufactured} = 70 + 120 = 190.

    Let aa and bb be days on which 7 and 6 units were manufactured respectively (so 3 units on 30−a−b30 - a - b days):

    7a+6b+3(30−a−b)=190  ⟹  4a+3b+90=190  ⟹  4a+3b=1007a + 6b + 3(30 - a - b) = 190 \implies 4a + 3b + 90 = 190 \implies 4a + 3b = 100

    To maximize aa, minimize b≥0b \ge 0:

    • b=0  ⟹  4a=100  ⟹  a=25b = 0 \implies 4a = 100 \implies a = 25.

    Max days of 7 units in February =25= 25.

  • March:

    ΔUndistributed(Gamma)=250−160=90\Delta \text{Undistributed}(\text{Gamma}) = 250 - 160 = 90.

    Identical to January: Gamma can be manufactured 7 units on all 30 days.

Total maximum days over the 3 months:

Total=30+25+30=85 days\text{Total} = 30 + 25 + 30 = 85\text{ days}

Correct Answer: Option (4)


Question 17 Solution:

  • Total undistributed units of Chemistry Alpha at end of March =225= 225.

  • Total units manufactured in 90 days =225+Total Dispatched= 225 + \text{Total Dispatched}.

  • To minimize the days on which 7 units of Alpha were manufactured, minimize the total units manufactured, which requires minimizing total dispatches.

  • Minimum possible dispatches over 90 days =90×1=90 units= 90 \times 1 = 90\text{ units}.

  • Total manufactured =225+90=315 units= 225 + 90 = 315\text{ units}.

  • Let pp and qq be the number of days on which 7 and 6 units were manufactured (so 3 units on 90−p−q90 - p - q days):

    7p+6q+3(90−p−q)=3157p + 6q + 3(90 - p - q) = 315

    4p+3q+270=315  ⟹  4p+3q=454p + 3q + 270 = 315 \implies 4p + 3q = 45

  • To minimize pp, set p=0p = 0:

    3q=45  ⟹  q=153q = 45 \implies q = 15

    Since q=15≤90q = 15 \le 90 and 90−15=75 days of 3 units90 - 15 = 75\text{ days of 3 units}, this is fully feasible.

  • Therefore, the minimum possible days on which 7 units of Chemistry Alpha were manufactured is 0.

Correct Answer: Option (1)


Question 18 Solution:

  1. Total days in February =30= 30.

    Ratio of days 3, 6, 7 units of Chemistry Beta manufactured =1:2:3= 1 : 2 : 3.

    • Days of 3 units =16×30=5= \frac{1}{6} \times 30 = 5

    • Days of 6 units =26×30=10= \frac{2}{6} \times 30 = 10

    • Days of 7 units =36×30=15= \frac{3}{6} \times 30 = 15

    Total manufactured in February:

    Manufactured=(3×5)+(6×10)+(7×15)=15+60+105=180 units\text{Manufactured} = (3 \times 5) + (6 \times 10) + (7 \times 15) = 15 + 60 + 105 = 180\text{ units}

  2. Undistributed Beta produced in February =168−88=80 units= 168 - 88 = 80\text{ units}.

    Dispatched in Feb=180−80=100 units\text{Dispatched in Feb} = 180 - 80 = 100\text{ units}

  3. Let d,e,fd, e, f be the number of days on which 1, 3, 4 units were dispatched respectively:

    d+e+f=30  ⟹  e=30−d−fd + e + f = 30 \implies e = 30 - d - f

    1d+3e+4f=100  ⟹  d+3(30−d−f)+4f=1001d + 3e + 4f = 100 \implies d + 3(30 - d - f) + 4f = 100

    90−2d+f=100  ⟹  f−2d=10  ⟹  f=10+2d90 - 2d + f = 100 \implies f - 2d = 10 \implies f = 10 + 2d

  4. To minimize ff (days of 4 units dispatched), minimize d≥0d \ge 0:

    d=0  ⟹  f=10d = 0 \implies f = 10

  5. Then the number of days on which 3 units of Chemistry Beta were dispatched:

    e=30−d−f=30−0−10=20 dayse = 30 - d - f = 30 - 0 - 10 = 20\text{ days}

Correct Answer: Option (2)

Takeaway: When solving rate-based inventory tracking puzzles with discrete daily permutation constraints, exploit aggregate flow invariance across all categories to establish exact monthly sums, then optimize single components by extreme value matching.

Practice questions

Question 1 · Foundation

Directions for Question 1

A cloud infrastructure startup tracks its monthly active compute instances (in thousands) over a 5-month period from January to May. The reported server instances are:

  • January: 120 ('000)

  • February: 135 ('000)

  • March: 150 ('000)

  • April: 165 ('000)

  • May: 198 ('000)

A metrics dashboard prepared two different bar charts: Chart A used a true zero baseline (y=0y=0), while Chart B used a truncated baseline starting at y=100y=100 ('000).

What was the actual percentage growth in active compute instances from January to May, and by what factor did the visual height of the May bar exceed the January bar in Chart B (truncated at 100)?

  1. A

    65.0%; 4.90 times

  2. B

    65.0%; 1.65 times

  3. C

    78.0%; 4.90 times

  4. D

    78.0%; 1.98 times

Show answer and explanation

Answer: (A) 65.0%; 4.90 times

Step-by-Step Solution:

  1. Actual Percentage Growth:

    Percentage Growth=May−JanuaryJanuary×100%=198−120120×100%=78120×100%=65.0%\text{Percentage Growth} = \frac{\text{May} - \text{January}}{\text{January}} \times 100\% = \frac{198 - 120}{120} \times 100\% = \frac{78}{120} \times 100\% = 65.0\%

  2. Visual Heights in Truncated Chart B:

    Because Chart B starts at baseline y=100y = 100:

    • Visual height of January bar =120−100=20 units= 120 - 100 = 20\text{ units}.

    • Visual height of May bar =198−100=98 units= 198 - 100 = 98\text{ units}.

    • Factor of visual height =9820=4.90 times= \frac{98}{20} = 4.90\text{ times}.

(In the true Chart A, the factor is simply 198/120=1.65198 / 120 = 1.65 times. The truncated baseline artificially magnifies the visual appearance from 1.65x to 4.90x!)

Question 2 · Foundation

Directions for Question 2

A clean-energy analytics firm recorded the quarterly dispatches (in units) of three commercial EV charger models—Model Alpha, Model Beta, and Model Gamma—across three consecutive quarters:

QuarterModel AlphaModel BetaModel Gamma
Q1400600500
Q2550650800
Q3700750950

In which quarter was the ratio of dispatches of Model Gamma to the total dispatches of all three models combined the highest, and what was that ratio (expressed in percentage to the nearest integer)?

  1. A

    Q1; 33%

  2. B

    Q2; 40%

  3. C

    Q3; 40%

  4. D

    Q2; 44%

Show answer and explanation

Answer: (B) Q2; 40%

Step-by-Step Solution:

  1. Quarter 1:

    • Total dispatches =400+600+500=1,500= 400 + 600 + 500 = 1,500

    • Gamma share =5001500=13≈33.33%= \frac{500}{1500} = \frac{1}{3} \approx 33.33\%

  2. Quarter 2:

    • Total dispatches =550+650+800=2,000= 550 + 650 + 800 = 2,000

    • Gamma share =8002000=25=40.00%= \frac{800}{2000} = \frac{2}{5} = 40.00\%

  3. Quarter 3:

    • Total dispatches =700+750+950=2,400= 700 + 750 + 950 = 2,400

    • Gamma share =9502400=1948≈39.58%= \frac{950}{2400} = \frac{19}{48} \approx 39.58\%

Comparing the three quarters: 40.00%>39.58%>33.33%40.00\% > 39.58\% > 33.33\%.

The ratio was highest in Q2 at 40%.

Question 3 · Foundation

Directions for Question 3

A stacked bar chart represents the quarterly expenditure (in ₹ lakh) of a SaaS enterprise across four quarters. Each bar is divided from bottom to top into three segments: Cloud Infrastructure (bottom), Marketing & Sales (middle), and AI R&D (top). The cumulative boundaries on the vertical axis are:

QuarterTop of Cloud Infra (Bottom Segment)Top of Marketing (Middle Segment)Total Bar Height (Top of AI R&D)
Q180140200
Q290165240
Q3110180270
Q4120210320

What was the absolute increase in Marketing & Sales expenditure from Q1 to Q4, and what percentage of the total quarterly expenditure in Q4 did Marketing & Sales constitute?

  1. A

    ₹30 lakh; 28.125%

  2. B

    ₹70 lakh; 28.125%

  3. C

    ₹30 lakh; 35.000%

  4. D

    ₹90 lakh; 65.625%

Show answer and explanation

Answer: (A) ₹30 lakh; 28.125%

Step-by-Step Solution:

  1. Marketing Expenditure in Q1:

    MarketingQ1=Top of Marketing−Top of Cloud Infra=140−80=₹60 lakh\text{Marketing}_{\text{Q1}} = \text{Top of Marketing} - \text{Top of Cloud Infra} = 140 - 80 = \text{₹}60\text{ lakh}

  2. Marketing Expenditure in Q4:

    MarketingQ4=Top of Marketing−Top of Cloud Infra=210−120=₹90 lakh\text{Marketing}_{\text{Q4}} = \text{Top of Marketing} - \text{Top of Cloud Infra} = 210 - 120 = \text{₹}90\text{ lakh}

  3. Absolute Increase:

    ΔMarketing=90−60=₹30 lakh\Delta \text{Marketing} = 90 - 60 = \text{₹}30\text{ lakh}

    (Trap note: Subtracting cumulative coordinates 210−140=70210 - 140 = 70 is wrong because the baseline shifted from 80 to 120).

  4. Marketing Percentage of Total in Q4:

    PercentageQ4=90320×100%=932×100%=28.125%\text{Percentage}_{\text{Q4}} = \frac{90}{320} \times 100\% = \frac{9}{32} \times 100\% = 28.125\%

Question 4 · Foundation

Directions for Question 4

A 100% subdivided bar chart shows the percentage distribution of engineers across three technical specializations—Core Systems, Cloud Architecture, and Machine Learning—in two engineering divisions:

  • Division Alpha: Total engineering workforce =1,200= 1,200. Distribution: Core Systems 25%25\%, Cloud Architecture 55%55\%, Machine Learning 20%20\%.

  • Division Beta: Total engineering workforce =1,800= 1,800. Distribution: Core Systems 30%30\%, Cloud Architecture 45%45\%, Machine Learning 25%25\%.

What is the total number of Machine Learning engineers across both divisions combined, and what percentage of the total combined engineering workforce do Machine Learning engineers represent?

  1. A

    690; 23.0%

  2. B

    675; 22.5%

  3. C

    690; 22.5%

  4. D

    720; 24.0%

Show answer and explanation

Answer: (A) 690; 23.0%

Step-by-Step Solution:

  1. Machine Learning Engineers in Division Alpha:

    MLα=20%×1,200=240\text{ML}_\alpha = 20\% \times 1,200 = 240

  2. Machine Learning Engineers in Division Beta:

    MLβ=25%×1,800=450\text{ML}_\beta = 25\% \times 1,800 = 450

  3. Total Machine Learning Engineers:

    Total ML=240+450=690\text{Total ML} = 240 + 450 = 690

  4. Total Combined Workforce:

    Total Workforce=1,200+1,800=3,000\text{Total Workforce} = 1,200 + 1,800 = 3,000

  5. Overall Machine Learning Percentage:

    Percentage=6903,000×100%=23.0%\text{Percentage} = \frac{690}{3,000} \times 100\% = 23.0\%

(Trap note: Taking the simple unweighted average of 20%20\% and 25%25\% yields 22.5%22.5\%, which is incorrect because Division Beta has 50%50\% more engineers than Division Alpha).

Question 5 · Foundation

Directions for Question 5

A clean-tech manufacturing facility tracks its monthly production and commercial dispatches of modular battery storage units (in '000 units) over four months. On January 1, the plant started with an opening inventory of 15 ('000 units).

MonthProduction ('000 units)Dispatches ('000 units)
January5042
February6558
March5562
April7064

At the end of which month was the closing inventory of undistributed battery storage units the highest, and what was that peak closing inventory (in '000 units)?

  1. A

    February; 30 thousand units

  2. B

    April; 29 thousand units

  3. C

    January; 23 thousand units

  4. D

    March; 23 thousand units

Show answer and explanation

Answer: (A) February; 30 thousand units

Step-by-Step Solution:

Using the inventory formula: Closingt=Openingt+Productiont−Dispatchest\text{Closing}_t = \text{Opening}_t + \text{Production}_t - \text{Dispatches}_t

  1. January:

    • Opening =15= 15

    • Net change =50−42=+8= 50 - 42 = +8

    • Closing =15+8=23= 15 + 8 = 23

  2. February:

    • Opening =23= 23

    • Net change =65−58=+7= 65 - 58 = +7

    • Closing =23+7=30= 23 + 7 = 30

  3. March:

    • Opening =30= 30

    • Net change =55−62=−7= 55 - 62 = -7

    • Closing =30−7=23= 30 - 7 = 23

  4. April:

    • Opening =23= 23

    • Net change =70−64=+6= 70 - 64 = +6

    • Closing =23+6=29= 23 + 6 = 29

Comparing the closing inventory across all four months:

  • January: 23

  • February: 30 (Peak)

  • March: 23

  • April: 29

The peak inventory occurred at the end of February at 30 thousand units.

Try real CAT questions

Study this concept with interactive practice in PrepSoc.

Open the concept library